Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1 Delisle Ave
1 Delisle Ave is on a 10.3 m by 30.8 m lot on Yonge St in Yonge-St.Clair. The zoning is CR. A site-specific exception, 900.11.10(2559), changes some of the usual rules for this address. The lot also fronts Delisle Ave.
The City has 16 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "Draft plan of condominium for 371 dwelling units". Status: draft plan approved. In 2022, a building permit was filed: "Demolish existing building". Status: closed. In 2021, a development application was filed: "The city has received a site plan control application for a 44-storey (150-metre) mixed-use building containing 383 residential dwelling units. the proposed…". Status: closed. Nothing on file is open right now.
Within 300 m, 19 development applications are open (the tallest up to 50 storeys). St. Clair station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2559)Moderate
- 19 development applications open within 300 mLowFree check
- Yonge-St. Clair Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
16 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-12-05 | Development application25 263076 STE 12 CD | Draft Plan of Condominium for 371 dwelling units. | Draft Plan Approved | |
| 2022-01-25 | Building permit21 236364 | Demolish existing building | Closed | |
| 2021-03-04 | Development application21 122895 STE 12 SA | The City has received a Site Plan Control application for a 44-storey (150-metre) mixed-use building containing 383 residential dwelling units. The proposed development will contain 1,640 square metres of non-residential gross floor area and 32,375 square metres of residential gross floor area. The proposal includes the retention of the facade of 1496-1500 Yonge Street and a parkland dedication at the rear of 30 and 40 St. Clair Avenue West. | Closed | |
| 2018-07-06 | Development application18 189938 STE 22 OZ | The City has received applications to amend the Official Plan and Zoning By-law for a 44-storey (150 metres tall including the mechanical penthouse) mixed-use building with 293 dwelling units and retail uses at grade. Overall, a total of 34,869 square metres of residential floor space will be provided, as well as 614 square metres of retail. The facade of the existing building at 1496-1500 Yonge Street will be incorporated into the podium of the new building. | Closed | |
| 2015-11-02 | Zoning review15 246100 LTO | No description on file | Closed | |
| 2015-08-11 | Zoning review15 204951 LTO | No description on file | Closed | |
| 2014-01-31 | Zoning review14 111924 LTO | No description on file | Closed | |
| 2004-03-04 | Zoning review04 113552 LTO | No description on file | Closed | |
| 2000-12-05 | Building permit00 355323 | install new sprinkler system on ground floor and basement for restaurant purposes - (94 Seats). see 00-338189 cost included in 00-338189 edc Tenant: Takara Sushi Health Department approval required | Closed | |
| 2000-11-17 | Building permit00 338189 | Make interior alterations on portion of 1st floor for restaurant purposes - (94 Seats) Tenant: Takara Sushi Health Department approval required | Closed | |
| 2000-09-22 | Building permit00 338206 | Install Kitchen Exhaust System in the restaurant on 1st floor. - (94 Seats): Tenant: Takara Sushi | Closed | |
| 2000-06-22 | Zoning review00 012688 LTO | No description on file | Closed | |
| 2000-05-24 | Building permit00 138530 | make interior alterations to portion of 1st floor for restaurant- 22 seats Health Approval received. tenant: Subway | Closed | |
| 1997-04-24 | Building permit97 015692 | INSTALL FIXTURES 1ST FLOOR RESTAURANT 3 W.C., 1 URNL., 2 W.B., 2 K.S., 2-2 CPT.K.S., 3 BAR S., 7 F.D., 1 HWT., 1 GREASE INTER., 2ND FL RETAIL STORE 1 W.C., 1 W.B., 1-2 CPT.S. SS | Closed - Dormant | |
| 1983-12-13 | Zoning review83 026521 LTO | No description on file | Closed | |
| 1981-07-07 | Zoning review81 030481 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2559)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2559)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2559)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.25 (c2.0; r3.0) SS2 (x2559)
- Height limit
- 30 m
- Corner lot
- Yes, also on Delisle Ave
- Public lane
- None
- House footprint
- 273 m²
- Back yard
- 1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 19 development applications open within 300 m, up to 50 storeys
- In the St Clair station area
- 9 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
19 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-St.Clair neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St. Clair StationNearest station2 min walk
- Yonge St at St Clair Ave West - St Clair StationNearest TTC stop1 min walk
- Yonge StNearest cycling route1 min walk
- Deer Park Jr & Sr Public SchoolSchool4 min walk
- The Linden SchoolSchool5 min walk
- The York School - Jr CampusSchool5 min walk
- The York School - Mdl and Sr CampusSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3270.8
- Robberycity median 69.525.8
- Auto theftcity median 192.664.5
- Theft over $5,000city median 46.132.2
- Break and entercity median 172.8374
- Theft from vehiclescity median 188.1116.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist