HousePrecheckCheck an address

1 Delisle AveYonge-St.Clair, Toronto · City records before you offer

Also 1510 Yonge St

Commercial residential · CR 4.25 (c2.0; r3.0) SS2 (x2559)10.1 × 30.8 m308 m²on Yonge Stcorner, also on Delisle Ave

2 things to check before you offer, including building permit open since 2024
N10 m
10.1 m frontage30.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1 Delisle Ave

1 Delisle Ave is on a 10.1 m by 30.8 m lot on Yonge St in Yonge-St.Clair. The zoning is CR. A site-specific exception, 900.11.10(2559), changes some of the usual rules for this address. The lot also fronts Delisle Ave.

The City has 22 records on this lot since 1997. That is more than at 99% of Toronto houses. In 2026, a Committee of Adjustment application was filed: "To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction)". Status: closed. In 2025, a development application was filed: "Draft plan of condominium for 371 dwelling units". Status: draft plan approved. In 2025, a building permit was filed: "Conditional permit - proposal to construct a new 44 storey mixed use building with 371 residential units, 3 levels of non residential uses and 4 levels of…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 19 development applications are open (the tallest up to 50 storeys). St. Clair station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2559)Moderate
  • 1 by-law investigation closed in the last two yearsLow
  • 19 development applications open within 300 mLowFree check
  • 3 City trees in front of this lotLowFree check
  • Yonge-St. Clair Secondary PlanLow
  • 2 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • Work or applications in progress
  • 1 by-law investigation closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 1 by-law investigation closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 2 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

22 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2027-08-10Consent (lot split)
B0048/26TEY
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.Pending
2026-02-18Minor variance
A0909/25TEY
To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction).Approved
2025-12-05Development application
25 263076 STE 12 CD
Draft Plan of Condominium for 371 dwelling units.Draft Plan Approved
2025-08-25By-law investigation
25 215598 PRS 00 IR
Property StandardsClosed
2025-05-28Building permit
21 218024
Conditional Permit - Proposal to construct a new 44 storey mixed use building with 371 residential units, 3 levels of non residential uses and 4 levels of below grade parking. The proposal includes the retention of the facade of 1496-1500 Yonge Street and a parkland dedication at the rear of 30 and 40 St. Clair Avenue West. See also 21 122895 STE 12 SA.Closed
2024-05-15Building permit
24 148905
Proposal for an alternative solution for proposed exit discharge condition for one below grade exit stairs which will not discharge directly to the exterior of the buildingNot Started
2024-01-29Building permit
24 109279
An indoor swimming pool will be located on the 2nd floor level and classified as a Class B pool.The design and construction is regulated by OBC Article 3.11.3.1. Specifically, OBC Clause3.1.11.3.1.(9)(a), requires the pool to be surrounded by a hard-surfaced pool deck, not lessthan 1,800 mm wide. It is proposed to provide the required deck on three sides of the pool.Cancelled
2023-07-17Building permit
23 175833
Proposal to install 65 mm hose connection valves within the exit stairs in lieu of the required fire hose cabinets containing 65mm and 38 mm hose valves with 38 mm fire hoses within 5 m of exits and within the floor areas.Approved
2023-07-17Building permit
23 175820
Proposal to install indoor swimming pool, located on the 2nd floor level and classified as a Class B pool.The design and construction is regulated by OBC Article 3.11.3.1. Specifically, OBC Clause3.1.11.3.1.(9)(a), requires the pool to be surrounded by a hard-surfaced pool deck, not lessthan 1,800 mm wide. It is proposed to provide the required deck on three sides of the pool.Approved
2022-01-17Building permit
21 236414
Demolish existing buildingClosed
2021-03-26Zoning review
21 122895 PSP
No description on fileClosed
2021-03-04Development application
21 122895 STE 12 SA
The City has received a Site Plan Control application for a 44-storey (150-metre) mixed-use building containing 383 residential dwelling units. The proposed development will contain 1,640 square metres of non-residential gross floor area and 32,375 square metres of residential gross floor area. The proposal includes the retention of the facade of 1496-1500 Yonge Street and a parkland dedication at the rear of 30 and 40 St. Clair Avenue West.Closed
2021-03-01Building permit
20 153703
Revision 01 - L1 ramp framing and L2 slab framing revision and extentension to accommodate the terrace mock-ups on L2.Proposal for interior alterations to convert the existing retail space into an office space.Closed
2020-03-02Consent (lot split)
SYS 4727189
No description on filePending
2018-07-10Zoning review
18 189938 POZ
No description on fileClosed
2018-07-06Development application
18 189938 STE 22 OZ
The City has received applications to amend the Official Plan and Zoning By-law for a 44-storey (150 metres tall including the mechanical penthouse) mixed-use building with 293 dwelling units and retail uses at grade. Overall, a total of 34,869 square metres of residential floor space will be provided, as well as 614 square metres of retail. The facade of the existing building at 1496-1500 Yonge Street will be incorporated into the podium of the new building.Closed
2017-11-16Building permit
17 251104
Proposal for interior alterations to unit 210 of an existing multi-unit commercial building.Closed
2009-05-14Zoning review
09 138436 LTO
No description on fileClosed
2000-03-20Building permit
00 128614
Relocate Ducts and Diffusers to exiting system on 1st floor. Cost Incl. in BPA:00-128604 Tenant: Sporting Life - New BalanceClosed
2000-03-15Building permit
00 128617
Install Plumbing Fixtures: 1 Shower in the Basement. Cost Incl. in BPA:00-128604 Tenant: Sporting Life - New Balance a.p. cleared - feb 22/00Closed
2000-02-28Building permit
00 128604
Demolish partitions in the Basement. Make interior alterations on the 1st floor for Retail store purposes.- Demising partitions by landlord only. Interior store layouts will be under separate permits Tenant: Sporting Life - New BalanceClosed
1997-05-21Zoning review
97 026394 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2559)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2559)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 3 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Yonge-St. Clair Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2559)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
10.1 m frontage30.8 m deepon Yonge St
Zone
CR 4.25 (c2.0; r3.0) SS2 (x2559)
Height limit
30 m
Corner lot
Yes, also on Delisle Ave
Public lane
None
House footprint
293 m²
Back yard
1.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 19 development applications open within 300 m, up to 50 storeys
    • In the St Clair station area
    • 9 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 19 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 5 of 6 categories
    • Break and enter: 2.2 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-St.Clair neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$94,000median $84,500
    Households that own their home40%median 54%
    Population (2021)12,905median 16,813
    Homes built in 1960 or before45%median 29%
    Homes needing major repairs5%median 7%

    Getting around and schools

    • St. Clair StationNearest station2 min walk
    • Yonge St at St Clair Ave West - St Clair StationNearest TTC stop1 min walk
    • Yonge StNearest cycling route1 min walk
    • Deer Park Jr & Sr Public SchoolSchool4 min walk
    • The York School - Jr CampusSchool5 min walk
    • The Linden SchoolSchool5 min walk
    • The York School - Mdl and Sr CampusSchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3270.8
    • Robberycity median 69.525.8
    • Auto theftcity median 192.664.5
    • Theft over $5,000city median 46.132.2
    • Break and entercity median 172.8374
    • Theft from vehiclescity median 188.1116.1

    More about Yonge-St.Clair

    Ready emails

    Copy and send as they are.

    5 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 1 Delisle Ave

    2 things to check at 1 Delisle Ave before you offer

    • Building permit open since 2024Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2559)Moderate
    • 1 by-law investigation closed in the last two yearsLow
    • and 4 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 8 steps to take before you offer, so nothing slips
    • What each of the 8 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.