HousePrecheck

Basement apartment check · free · any Toronto house

Is this Toronto basement apartment permitted?

Only 1 in 34 Toronto houses has a permit for a second unit or a multiplex on file*. If the listing says “legal basement apartment”, type the address to see whether the City has a permit for it.

Try

A second unit: what makes it legal

  1. Permit

    A second unit needs one

    Adding a second unit to a house, such as a basement apartment, needs a building permit, and the permit is closed only after the final inspection.

    City of Toronto, Secondary Suites
  2. Fire

    A house with two units has its own rules

    Ontario's Fire Code has its own section for houses with two units, so a unit that was never inspected may need work to meet it.

    Ontario Fire Code, Division B, Section 9.8
  3. 50%

    Work found without a permit

    When unpermitted work comes to light, the City can charge a fee of 50% of the permit fees, and the work may have to be changed or removed. After closing, that is the new owner.

    City of Toronto, Working Without a Permit

Good to know

What makes a basement apartment legal in Toronto?

A building permit for the second unit, closed after its final inspection, so the City has a record that the unit was inspected. Zoning has to allow it too; most Toronto houses can have a second unit.

What if no permit is on file?

There is no City record that the unit was permitted or inspected. It is a question for the seller, not proof that the unit is illegal: ask for the permit number, and ask your lawyer about it before you count on the rent.

Does a finished basement need a permit?

It depends on the work. You need one when finishing includes structural changes, new plumbing or heating, underpinning, a basement entrance or a second suite. A basement finished without any of those does not.

What if the unit was built before 2000?

The City's open data has permits from 2000 on, so an older permit will not show here. Ask the seller for it, or order the City's building records for the address.

Why does a permit still open matter?

An open permit means the final inspection was not done. The City says the current owner is responsible for outstanding permits, so after closing, finishing it falls to you.

What does the full report add?

Everything else in the City's records on the house, explained for a buyer: other open permits, City orders, zoning, heritage, TRCA, what to ask the seller and the steps before an offer. One payment, for one address.

Read the guide: Toronto building permits: what to check before you buy

* Of 464,699 Toronto houses, 11,252 (2.4%) have a building permit for a second unit on file, and 13,518 (2.9%) one for a second unit or for two to four units, from 2000 to October 2026 (City of Toronto building permits open data). A screening tool, not a legal opinion. How it works

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.