Ravine lot check · free · any Toronto house
Is this Toronto house in a TRCA regulated area?
1 in 16 Toronto houses sits at least partly in a TRCA regulated area*, where even a deck or a pool can need a permit. Type the address to see this one, drawn from TRCA's own map.
Try
Buying on a ravine lot: three things to know
- 1 in 16
Toronto houses in a regulated area
29,384 of 464,699 Toronto houses are at least partly inside TRCA's regulated area: land near rivers, ravines, wetlands and the lake shore, plus an allowance around them.
TRCA Regulation Limit; HousePrecheck count, October 2026 - Permit
For a deck, a pool or an addition
In a regulated area, most building, grading and landscaping needs a TRCA permit. TRCA checks whether the work affects flooding or erosion, and it can refuse.
Conservation Authorities Act, s. 28; O. Reg. 41/24 - $385
For a formal answer
TRCA's property inquiry letter says whether the lot is affected and lists past violations. It costs $385 per parcel and takes at least two weeks.
TRCA, Property Inquiries
Good to know
What is a TRCA regulated area?
Land near rivers, ravines, wetlands or the Lake Ontario shoreline where most building, grading and landscaping needs a permit from the Toronto and Region Conservation Authority. It covers the hazard itself plus an allowance around it, so it is wider than the floodplain.
Does a house in a regulated area flood?
Not necessarily. The regulated area marks land where work can affect flooding or erosion, not houses that have flooded. A house outside it can still get water in the basement.
What work needs a TRCA permit?
Building or replacing a house, an addition, a garage or a shed, a deck, a pool, landscaping, and placing or removing fill, on the part of the lot inside the regulated area. Some small projects are exempt under the regulation, such as certain fences.
How long does a TRCA permit take?
By law, TRCA has 21 days to say whether an application is complete (O. Reg. 41/24, s. 7). Its own service standard is faster: 14 days for a minor application and 21 for a major one, then a reply within 21 or 28 days. If there is no decision within 90 days, the applicant can appeal to the Ontario Land Tribunal (Conservation Authorities Act, s. 28.1). A permit can be refused.
What is the City's ravine by-law?
A separate City of Toronto map, the Ravine and Natural Feature Protection area. Inside it, cutting or injuring any tree, whatever its size, and grading or dumping fill need a City permit. A lot can be under one, both or neither.
How do you draw the line?
From TRCA's published Regulation Limit and the City's ravine protection map, laid over the City's property boundaries and 3D Massing outline of the house. The maps are close but not exact, and TRCA updates its own: its free Regulated Area Search shows the current line.
What if a previous owner built a deck without a TRCA permit?
TRCA can enforce against work done without a required permit. Its property inquiry letter lists previous and outstanding violations. Ask your lawyer how to handle it before closing.
What does the full report add?
Everything else in the City's records on the house, explained for a buyer: open permits and orders, zoning, heritage, what neighbours built and the steps before an offer. One payment, for one address.
Read the guide: TRCA regulated area: what it means when you buy a house
* Of 464,699 Toronto houses, 29,384 (6.3%) are at least partly inside TRCA's regulated area and 27,101 (5.8%) partly under the City's ravine by-law, by our count of TRCA's and the City's published maps (October 2026). A screening tool, not TRCA's answer: confirm with TRCA before you buy or plan work. How it works