HousePrecheckCheck an address

999 Progress AveToronto · zoning, lot size and permit records

Employment · E 0.6153.2 × 173.9 m25,141 m²on Milner Business Crtcorner, also on Progress Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 04 104305 (SITE SERVICESPlumbing - NEW INDUSTRIAL BUILDING-SHELL - New Building, 2004, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
153.2 m frontage173.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2004

    Needs a closer look

    Still open in the City's records: 04 104305 (SITE SERVICESPlumbing - NEW INDUSTRIAL BUILDING-SHELL - New Building, 2004, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (12% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit24 231789Closed

    HVAC - INTERIOR RENOVATION: PROPOSED DIGITAL PRINTING ROOM 1. ADD WALL WITH ROLL-UP DOORS, WIDOWS AND ONE LOUVER2. ADD ONE SINK (PLUMBING FIXTURE)2. ADD T-BAR CEILING WITH MECHANICAL AND ELECTRICAL FIXTURES + RELOCATION OF SPRINKLERS3. ADD ONE ROOF TOP UNIT ON EXISTING FRAMING

    Dec 2, 2024 · 999 PROGRESS AVE
  • Building permit21 137090Closed

    Proposal for interior alterations

    Jun 25, 2021 · 999 PROGRESS AVE
  • Building permit14 229081Closed

    Installation of rooftop PV solar collector system.

    Oct 17, 2014 · 999 PROGRESS AVE
  • Building permit03 202812Closednew building

    rev#2-initial drwgs showed future mezzannine, owner wants to use now NEW INDUSTRIAL BUILDING-SHELL

    Apr 26, 2006 · 999 PROGRESS AVE
  • Building permit04 104305Inspection

    SITE SERVICESPlumbing - NEW INDUSTRIAL BUILDING-SHELL - New Building

    May 17, 2004 · 999 PROGRESS AVE

Lot facts

Area
25,141 m²
Frontage
153.2 m
Depth
173.9 m
Street
Milner Business Crt
Corner lot
Yes, also on Progress Ave173.9 m along it
Public lane
None
House footprint
11,553 m²roof up to 12.8 m
Back yard
18.2 mhouse to rear lot line
Side yards
4.4 m and 37 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.6 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a vehicle depot use on the subject property, whereas the By-law prohibits a Vehicle Depot within 70m of a residential zone.

    415 MILNER AVE · Aug 23, 2023 · 267 m away

Latest activity nearby

  • Zoning review

    Closed

    325 MILNER AVE · Sep 30, 2026 · 242 m away
  • Zoning review

    Closed

    50 NOVOPHARM CRT · Sep 28, 2026 · 296 m away
  • Minor varianceDeferred

    To construct a new 15-storey hotel with 279 parking spaces. The existing six-storey hotel will remain.

    20 MILNER BUSINESS CRT · Jul 20, 2026 · 291 m away
  • Building permit

    Demolition of existing interior partitions. New interior partitions. Revised HVAC and electrical.

    325 MILNER AVE · Apr 9, 2026 · 242 m away
  • Building permit

    Proposed expansion of existing dental office

    325 MILNER AVE · Jan 9, 2026 · 242 m away
  • Building permit

    Proposal to install a backflow prevention device in an existing hotel.

    20 MILNER BUSINESS CRT · Jul 8, 2025 · 291 m away
  • Building permit

    HVAC - INTERIOR RENOVATION: PROPOSED DIGITAL PRINTING ROOM 1. ADD WALL WITH ROLL-UP DOORS, WIDOWS AND ONE LOUVER2. ADD ONE SINK (PLUMBING FIXTURE)2. ADD T-BAR CEILING WITH MECHANICAL AND ELECTRICAL FIXTURES + RELOCATION OF SPRINKLERS3. ADD ONE ROOF TOP UNIT ON EXISTING FRAMING

    999 PROGRESS AVE · Dec 2, 2024 · 39 m away
  • Zoning review

    Notice Sent

    20 MILNER BUSINESS CRT · Nov 27, 2024 · 291 m away
  • Zoning review

    Closed

    325 MILNER AVE · Nov 22, 2024 · 242 m away
  • Development application

    Draft Plan of Condominium to convert 4 existing multiple unit employment buildings - currently rented to industrial/ commercial tenants - into condominium ownership. The exisiting development contains four (4), one (1) storey, multi-unit commercial/ industrial buildings constructed circa 1979. Each building will have 12 condominium units for a total of 48 units. The site contains surface parking with 326 spaces, including 10 accessible parking spaces.

    50 NOVOPHARM CRT · Sep 10, 2024 · 290 m away · City file

Neighbourhood: Malvern East

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station35 min walk
Nearest TTC stop
Progress Ave at Milner Business Crt2 min walk
Nearest traffic count
9,430 vehicles in 8 hHwy 401 Collectors E Ramp / Progress Ave / Progress Ave N, 270 m away, Jan 31, 2006
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Cynthia Lai Park5 min walk
Trca Lands ( 90)7 min walk
Morningside Park8 min walk

Schools within 1 km

  • CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 8 min walk
  • BURROWS HALL JR PUBLIC SCHOOL English Public 9 min walk
  • VEDIC ROOTS Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern EastMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home70%54%
Population (2021)26,09516,813
Homes built in 1960 or before4%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern EastCity median
Assault505.9636.3
Robbery80.869.5
Auto theft224.8192.6
Theft over $5,00035.146.1
Break and enter80.8172.8
Theft from vehicles186.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.