HousePrecheckCheck an address

9950-9952 Sheppard Ave EToronto · zoning, lot size and permit records

Also 9950 Sheppard Ave E, 9952 Sheppard Ave E

IPW (x92)≈ 256.5 × 99.8 m8,456 m²on Sheppard Ave E

Not a home

A place of worship

The zoning by-law sets this parcel aside for a place of worship. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A place of worshipParking and traffic around services, often at weekends.
  • 2 development applications open within 300 m, up to 3 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 256.5 m frontage≈ 99.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (9% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (2% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Little Rouge Forest

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • Natural Heritage System (20% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit25 208681Closed

    Proposal to renovate the men and womens washroom including two ADA accessible washrooms.

    Jan 20, 2026 · 9950-9952 SHEPPARD AVE E
  • Building permit25 177823Cancelled

    Proposal to construct interior alterations to an existing bathroom and a new accessible bathroom in an existing place of worship.

    Jun 16, 2025 · 9950 SHEPPARD AVE E
  • Building permit24 173899Closed

    The work pertains to the office within the church. The existing second floor is sagging severely. Structural strengthening on 2F is required. No plumbing and HVAC are added.

    Mar 18, 2025 · 9950-9952 SHEPPARD AVE E
  • Building permit17 138370Closed

    Enclose an outdoor platform and create a new enclosed elevator for barrier free access

    Jul 18, 2017 · 9950-9952 SHEPPARD AVE E
  • Zoning review16 240088 ZZCClosed
    Oct 20, 2016 · 9950-9952 SHEPPARD AVE E
  • Building permit15 167633Closed

    To construct kitchen hood in the kitchen of the basement.

    Jul 14, 2015 · 9950 SHEPPARD AVE E

Check before you build

  • Site-specific exception 900.34.10(92)

    Needs a closer look

    6 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.34.10(92)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a front lot line that abuts Sheppard Ave. is 21.0 metres, measured from the original centre line of the street

  2. Rule B

    The minimum building setback from a side lot line or rear lot line is a distance equal to half the height of the building

  3. Rule C

    The maximum lot coverage is the lot coverage the existed on the date of the enactment of this by-law

  4. Rule D

    Gross floor area of all buildings must not exceed 40% of the lot area

  5. Rule E

    The maximum height of a building is the height of the building that lawfully existed on the date of the enactment of this By-law, excluding any spire, belfry or similar architectural feature

  6. Rule F

    Parking must be provided at a minimum rate of 7.7 parking spaces for 100 square metres of gross floor area .

  7. Older by-law A

    Schedule "C" Exception 11, of former City of Scarborough by-law 15907.

By-law 569-2013, Chapter 900

Lot facts

Area
8,456 m²
Frontage
256.5 mestimated, irregular lot
Depth
99.8 mestimated, irregular lot
Street
Sheppard Ave E
Corner lot
No
Public lane
None
House footprint
1,167 m²roof up to 13.9 m
Back yard
41.2 mhouse to rear lot line
Side yards
71.2 m and 142.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 122. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone IPW (x92) (Institutional Place of Worship). Chapter 80, section 80.50 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for a group home for youth in support of a Childrens Residence Licence, no construction proposed

    45 LIONHEAD TRL · Nov 3, 2026 · 180 m away
  • Zoning review

    Closed

    45 LIONHEAD TRL · Aug 11, 2026 · 180 m away
  • Building permit

    Proposal to renovate the men and womens washroom including two ADA accessible washrooms.

    9950-9952 SHEPPARD AVE E · Jan 20, 2026 · 59 m away
  • Building permit

    Proposal to construct interior alterations to an existing bathroom and a new accessible bathroom in an existing place of worship.

    9950 SHEPPARD AVE E · Jun 16, 2025 · 61 m away
  • Building permit

    Proposal to install back water valve

    58 LIONHEAD TRL · Apr 23, 2025 · 108 m away
  • Building permit

    The work pertains to the office within the church. The existing second floor is sagging severely. Structural strengthening on 2F is required. No plumbing and HVAC are added.

    9950-9952 SHEPPARD AVE E · Mar 18, 2025 · 59 m away
  • Zoning review

    Closed

    45 LIONHEAD TRL · Jan 20, 2025 · 180 m away
  • Building permitsecondary suite

    PROPSAL TO CONVERT THE EXISTING BASEMENT TO A aADDITIONAL DWELLING UNIT BY USING THE EXISTING SIDE DOOR

    73 LIONHEAD TRL · Jun 10, 2024 · 148 m away
  • Zoning review

    Notice Sent

    9940 SHEPPARD AVE E · Nov 16, 2023 · 157 m away
  • Building permit

    Proposed unheated sunroom extension in rear yard

    14 LIONHEAD TRL · Oct 31, 2023 · 256 m away

Neighbourhood: Morningside Heights

About the area around the lot, not the lot itself.

Nearest TTC stop
Sheppard Ave East at Twyn Rivers Dr North Side2 min walk
Nearest cycling route
Sheppard Ave EBike Lane, 1 min walk
Nearest traffic count
8,207 vehicles in 8 hSheppard Ave E: Meadowvale Rd - Twyn Rivers Dr, 70 m away, Jun 6, 2017
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 1 with cyclists
Parks
Rouge Park1 min walk
Zooview Park6 min walk
Dean Park Walkway11 min walk

Schools within 1 km

  • CHIEF DAN GEORGE PUBLIC SCHOOL English Public 13 min walk
  • JOHN G DIEFENBAKER PUBLIC SCHOOL English Public 14 min walk
  • ST JEAN DE BREBEUF CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMorningside HeightsMedian neighbourhood
Median household income (2020)$117,000$84,500
Households that own their home84%54%
Population (2021)24,94016,813
Homes built in 1960 or before1%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMorningside HeightsCity median
Assault486.1636.3
Robbery138.469.5
Shootings18.710.5
Auto theft362.7192.6
Theft over $5,00067.346.1
Break and enter149.6172.8
Theft from vehicles243.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.