HousePrecheckCheck an address

99 Coleman AveToronto · zoning, lot size and permit records

Residential · R (d0.6) (x298)30.5 × 44.4 m1,350 m²on Coleman Avebacks onto Ln N Danforth W Dawes

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 22 151603 (Proposal to remodel existing washroom; no new fixtures, 2022, status Permit Issued); 18 117106 (Proposal to relocate washing machine and install new shower in existing condo unit, 2018, status Inspection); 14 167371 (Proposal to replace the gaurd rails around the roof top deck on the existing apartment..., 2014, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 10 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: Main StreetThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
30.5 m frontage44.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2014

    Needs a closer look

    Still open in the City's records: 22 151603 (Proposal to remodel existing washroom; no new fixtures, 2022, status Permit Issued); 18 117106 (Proposal to relocate washing machine and install new shower in existing condo unit, 2018, status Inspection); 14 167371 (Proposal to replace the gaurd rails around the roof top deck on the existing apartment..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit22 151603Permit Issued

    Proposal to remodel existing washroom; no new fixtures.

    Jul 19, 2022 · 99 COLEMAN AVE
  • Building permit18 236748Closed

    Proposed backflow prevention device

    Oct 31, 2018 · 99 COLEMAN AVE
  • Building permit18 152781Cancelled

    Proposal for interior alterations to unit 204 of existing apartment building.

    May 3, 2018 · 99 COLEMAN AVE
  • Building permit18 117106Inspection

    Proposal to relocate washing machine and install new shower in existing condo unit.

    Mar 2, 2018 · 99 COLEMAN AVE
  • Building permit14 167371Inspection

    Proposal to replace the gaurd rails around the roof top deck on the existing apartment building.

    Jun 17, 2014 · 99 COLEMAN AVE

Check before you build

  • Exception 900.2.10(298) does not apply to this address

    Good to know

    The exception covers this area, but each of its 3 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(298)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

3 parts for other addresses
  • A On 78 Coleman Ave., former City of Toronto by-law 423-76
  • B On 88 Coleman Ave., former City of Toronto by-law 424-76
  • C On 314 Main St., former City of Toronto by-law 95-0454.
By-law 569-2013, Chapter 900

Lot facts

Area
1,350 m²
Frontage
30.5 m
Depth
44.4 m
Street
Coleman Ave
Corner lot
No
Public lane
Ln N Danforth W Dawes, 30.5 m along it
Max height
11 m
Max lot coverage
—
  • Major Transit Station Area: Main Street. The lot is inside the Main Street Major Transit Station Area approved by the Province (Site and Area Specific Policy 621). Source
  • Zone R (d0.6) (x298) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
2
Laneway suite permits
2
Multiplex permits
0
Development applications
15

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey ancillary building (one-car detached garage) abutting the laneway.

    393 MAIN ST · Sep 2, 2026 · 462 m away
  • Minor varianceApproved

    To alter the existing rear one-storey detached ancillary building (garage) by constructing a complete second storey addition with a side (north) exterior staircase. This building will contain an existing garage on the ground level and new one garden suite on the second level. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

    34 NEWMAN AVE · Apr 29, 2026 · 487 m away
  • Minor varianceApproved

    To construct a one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway (Sibley Avenue). The existing one-storey shed will be demolished.

    9 AVONLEA BLVD · Jan 21, 2026 · 317 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (sunroom) above the existing rear one-storey portion of the dwelling.

    25 SIBLEY AVE · Apr 9, 2025 · 403 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition (rooftop deck enclosure) and a partial rear third storey addition (rooftop deck enclosure).

    40 CROSSOVERS ST · Nov 20, 2024 · 451 m away

Latest activity nearby

  • Building permit

    Proposed installation of backwater valve to single family dwelling.

    47 DENTONIA PARK AVE · Nov 19, 2026 · 209 m away
  • Building permit

    Interior alterations to the second and third floors to convert the residential space into a single dwelling unit.

    2813 DANFORTH AVE · Nov 6, 2026 · 176 m away
  • Zoning review

    Closed

    2820 DANFORTH AVE · Oct 28, 2026 · 134 m away
  • Building permit

    INSTALL BACK WATER VALVE AND SUMP PUMP

    7 DENTONIA PARK AVE · Oct 21, 2026 · 226 m away
  • Building permit

    Proposed Interior alteration for mercantile space at ground floor and office/shop arrangement at basement.

    2858 DANFORTH AVE · Oct 19, 2026 · 204 m away
  • Development application

    Draft Plan of Condominium for 373 residential units.

    30 DAWES RD · Oct 14, 2026 · 158 m away · City file
  • Building permitdemolition

    Proposal for demolition of the existing structures

    2734 DANFORTH AVE · Sep 21, 2026 · 75 m away
  • Building permitdemolition

    proposal for demolition of the existing structures

    2726 DANFORTH AVE · Sep 21, 2026 · 85 m away
  • Building permitdemolition

    Proposal for demolition of the existing structures on the property and the construction of a new exterior wall to isolate the adjacent attached structure

    2720 DANFORTH AVE · Sep 21, 2026 · 85 m away
  • Building permit

    Proposal for administrative permit for work at 161 Coleman Ave - 26 235478 BLD 00 SR

    159 COLEMAN AVE · Sep 16, 2026 · 257 m away

Neighbourhood: East End-Danforth

About the area around the lot, not the lot itself.

Nearest station
Main Street Station5 min walk
Nearest TTC stop
Dawes Rd at Danforth Ave North Side1 min walk
Nearest cycling route
Dawes RdBike Lane, 1 min walk
Nearest traffic count
4,096 vehicles in 8 hDawes Rd / Coleman Ave, 80 m away, Apr 20, 2022
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 0 with cyclists
Parks
Coleman Park2 min walk
Maryland Park4 min walk
Dentonia Park6 min walk

Schools within 1 km

  • WILLIAM J MCCORDIC SCHOOL English Public 2 min walk
  • COMMUNITY LIFE CHRISTIAN SCHOOL Private 7 min walk
  • SECORD ELEMENTARY SCHOOL English Public 7 min walk
  • DANFORTH LINC English Public 9 min walk
  • BEACHES ALTERNATIVE JR & KIMBERLEY JR English Public 13 min walk
  • MALVERN COLLEGIATE INSTITUTE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEast End-DanforthMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home55%54%
Population (2021)21,84016,813
Homes built in 1960 or before54%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEast End-DanforthCity median
Assault796.2636.3
Robbery51.869.5
Shootings410.5
Auto theft147.3192.6
Theft over $5,00039.846.1
Break and enter195.1172.8
Theft from vehicles195.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.