Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 23 228917 WET 03 OZ (The proposed development consists of a 26-storey mixed use building, containing 352 dwe..., 2023).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- Development application23 228917 WET 03 OZOMB Appeal
The proposed development consists of a 26-storey mixed use building, containing 352 dwelling units with retail uses at-grade. The proposed net density is 8.83 times the area of the lot. The total building height is 80.47 metres, exclusive of the 5-metre-high mechanical penthouse. 147 vehicular parking spaces are proposed in underground parking levels and 265 bicylcle parkings spaces are proposed on ground level and the first underground level.
Nov 23, 2023 · 99 BIRMINGHAM ST · City file - Building permit15 240376Closed
Proposal to demolish existing fire damaged industrial building.
Oct 22, 2015 · 99 BIRMINGHAM ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,393 m²
- Frontage
- 36.6 m
- Depth
- 38.1 m
- Street
- Eighth St
- Corner lot
- Yes, also on Birmingham St38.1 m along it
- Public lane
- None
- House footprint
- 1,247 m²roof up to 7.1 m
- Back yard
- 0.6 mhouse to rear lot line
- Side yards
- 0.2 m and 0.3 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: apple, sargents (29 cm), planetree, london bloodgood (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%17 of 17 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 5
- Multiplex permits
- 0
- Development applications
- 5
Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct two new warehouse buildings.
260 EIGHTH ST · Jun 25, 2026 · 277 m away - Minor varianceApproved
To legalize and to maintain an enclosed second storey front platform, to construct a second storey rear addition, and to convert the existing dwelling into a duplex.
115 TENTH ST · Nov 20, 2025 · 362 m away - Minor varianceApproved
To construct a second storey addition above the existing dwelling.
145 FOURTH ST · Nov 6, 2025 · 381 m away - Minor varianceApproved
To construct a new ancillary building (detached garage) in the rear yard.
140 FOURTH ST · Aug 14, 2025 · 342 m away - Minor varianceApproved
To construct a second and third storey addition above the existing dwelling.
84 TENTH ST · Jul 24, 2025 · 500 m away
Latest activity nearby
- Building permit
Proposal fo interior alterations to an existing vacant unit on the ground floor for new dental clinic.Convenience address is 2955 Lake Shore Blvd W
2953 LAKE SHORE BLVD W · Oct 22, 2026 · 280 m away - Building permit
REV: Proposed revision for layout change and structural updatesProposed interior alterations, underpinning, new deck in the rear yard, and new roof on the east side of the existing detached single family dwelling.
181 SIXTH ST · Oct 21, 2026 · 190 m away - Building permit
Interior alteration to existing suite. Addition of Washroom
50 ETTA WYLIE RD · Oct 5, 2026 · 265 m away - Zoning review
Closed
260 EIGHTH ST · Jul 20, 2026 · 277 m away - Building permit
PROPOSED BASEMENT INTERIOR ALTERATIONS (35.87m2) and UNDERPINNING (25.21m)
159 SIXTH ST · Jun 29, 2026 · 208 m away - Minor varianceApproved
To construct two new warehouse buildings.
260 EIGHTH ST · Jun 25, 2026 · 277 m away - Building permit
To construct a rear laneway suite behind the existing apartment building of 8 units.
149 SIXTH ST · May 13, 2026 · 227 m away - Building permit
Back water valve installation
171 FIFTH ST · Apr 17, 2026 · 288 m away - Zoning review
Closed
2953 LAKE SHORE BLVD W · Apr 13, 2026 · 280 m away - Building permit
Administrative party wall permit for underpinning. Refer to permit 26 108279 BLD 00 BA
2957-2959 LAKE SHORE BLVD W · Feb 23, 2026 · 280 m away
Neighbourhood: New Toronto
About the area around the lot, not the lot itself.
- Nearest station
- Mimico GO Station28 min walk
- Nearest TTC stop
- Eighth St at Birmingham St1 min walk
- Nearest cycling route
- Birmingham StCycle Track, 1 min walk
- Nearest traffic count
- 8,406 vehicles in 8 hIslington Ave / Birmingham St, 80 m away, Mar 24, 2021
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Jordon Carter Memorial Park1 min walk
- Lakeshore Village Park4 min walk
- Lamp Ground4 min walk
Schools within 1 km
- CHILDREN'S URBAN ENRICHMENT STUDIO Private 4 min walk
- SEVENTH STREET JR SCHOOL English Public 6 min walk
- ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
- SECOND STREET JR MDL SCHOOL English Public 9 min walk
- LAKESHORE COLLEGIATE INSTITUTE English Public 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | New Toronto | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 44% | 54% |
| Population (2021) | 11,345 | 16,813 |
| Homes built in 1960 or before | 45% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | New Toronto | City median |
|---|---|---|
| Assault | 903.2 | 636.3 |
| Robbery | 76.5 | 69.5 |
| Shootings | 15.3 | 10.5 |
| Auto theft | 145.4 | 192.6 |
| Theft over $5,000 | 91.9 | 46.1 |
| Break and enter | 183.7 | 172.8 |
| Theft from vehicles | 244.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.