Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 982 Kingston Rd
982 Kingston Rd is on a 6 m by 30.8 m lot on Kingston Rd in East End-Danforth. The zoning is CR. A site-specific exception, 900.11.10(1988), changes some of the usual rules for this address.
The City has 12 records on this lot since 2011. That is more than at 99% of Toronto houses. In 2021, a building permit was filed: "To construct a second and third storey addition above the rear one-storey portion of the existing three-storey commercial and residential building to establish…". Status: closed. In 2021, a Committee of Adjustment application was filed: "To construct a second and third storey addition above the rear one-storey portion of the existing three-storey commercial and residential building to establish…". Status: closed. In 2013, a building permit was filed: "Proposal for 3 new sinks on 1 - ground floor and 2 - basement of new cafe/restaurant under 30 seats". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 27 minor variance applications in the last 10 years and approved 89%. The nearest TTC stop is Kingston Rd at Scarborough Rd, a 1-minute walk.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(1988)Moderate
- 1 City tree in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
12 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-10-23 | By-law investigation25 243744 WST 00 IR | Waste | Closed | |
| 2024-03-04 | Zoning review24 121511 LPR | No description on file | Closed | |
| 2022-04-26 | Zoning review22 138538 ZAP | No description on file | Closed | |
| 2021-07-15 | Building permit21 149319 | To construct a second and third storey addition above the rear one-storey portion of the existing three-storey commercial and residential building to establish a third dwelling unit. | Closed | |
| 2021-02-17 | Minor varianceA0480/20TEY | To construct a second and third storey addition above the rear one-storey portion of the existing three-storey commercial and residential building to establish a third dwelling unit. | Approved | |
| 2020-03-05 | Zoning review20 122273 ZPR | No description on file | Closed | |
| 2014-01-10 | Zoning review14 103089 LPR | No description on file | Closed | |
| 2013-12-31 | Building permit13 272874 | Proposal for 3 new sinks on 1 - ground floor and 2 - basement of new cafe/restaurant under 30 seats. | Closed | |
| 2012-06-29 | Building permit12 144342 | Proposal changed from 3 storey rear addition to one storey rear addition and number of units to be maintained as 2. | Closed | |
| 2012-03-09 | Zoning review12 134521 ZZC | No description on file | Closed | |
| 2012-02-24 | Building permit11 312026 | REVISION - to remove basement walkout, reconfigure the front entrace and add new ground floor exit door at rear. Permit for interior alterations to existing apartment units in mixed use building. Please note that ZZC application has been reduced. | Closed | |
| 2011-09-15 | Zoning review11 275137 ZZC | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(1988)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(1988)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1988)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.0 (c1.0; r1.5) SS2 (x1988)
- Height limit
- 14 m
- Corner lot
- No
- Public lane
- Ln N Kingston E Scarborough, 6.1 m along it
- House footprint
- 95 m²
- Back yard
- 10.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 3 suite and multiplex permits within 300 m in 10 years
- 27 minor variance decisions within 300 m, 89% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
East End-Danforth neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Danforth GO StationNearest station24 min walk
- Kingston Rd at Scarborough RdNearest TTC stop1 min walk
- Fallingbrook RdNearest cycling route10 min walk
- Beaches MontessoriSchool2 min walk
- Adam Beck Jr Public SchoolSchool5 min walk
- Neil McNeil Catholic High SchoolSchool6 min walk
- Blantyre Public SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3796.2
- Robberycity median 69.551.8
- Shootingscity median 10.54
- Auto theftcity median 192.6147.3
- Theft over $5,000city median 46.139.8
- Break and entercity median 172.8195.1
- Theft from vehiclescity median 188.1195.1
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist