HousePrecheckCheck an address

972 Eglinton Ave EToronto · zoning, lot size and permit records

Residential multiple · RM (f30.0; a930; d1.25)≈ 36.6 × 43.8 m1,242 m²on Eglinton Ave E

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 49 rental units, built 1962More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • City upkeep score: 89 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 36.6 m frontage≈ 43.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (27% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (15% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 243048 PRS 00 IR (Property Standards, 2026); 26 170824 000 00 IR (Adequate Heat, 2026); 26 170823 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 89 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (6 storeys, 49 units, built 1962).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 243048 PRS 00 IRClosed

    Property Standards

    Sep 23, 2026 · 972 EGLINTON AVE E
  • By-law investigation26 170824 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 972 EGLINTON AVE E
  • By-law investigation26 170823 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 972 EGLINTON AVE E
  • Building permit18 121498Closed

    Proposal for interior alterations to existing apartment building for a fire rated wall and fire rated door for a 6th-7th floor staircase

    Apr 16, 2018 · 972 EGLINTON AVE E
  • Building permit18 121491Cancelled

    Alternative Solution for fire rated shaft wall to run alongside staircase and a fire rated door for staircase access as requested by the fire department.

    Feb 26, 2018 · 972 EGLINTON AVE E
  • Building permit08 200326Closed

    This is a common garage for building 970 and 972 Eglinton Ave.

    Sep 19, 2008 · 972 EGLINTON AVE E

Lot facts

Area
1,242 m²
Frontage
36.6 mestimated, irregular lot
Depth
43.8 mestimated, irregular lot
Street
Eglinton Ave E
Corner lot
No
Public lane
None
House footprint
735 m²roof up to 29.2 m
Back yard
3.8 mhouse to rear lot line
Side yards
0 m and 2.6 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
16 m
Max lot coverage
30%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 30 m. Frontage is about 36.6 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 930 m². Lot area is 1,242 m²: meets the minimum. Source
  • Zone RM (f30.0; a930; d1.25) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
88%21 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a three-storey fourplex with a garden suite in the rear yard.

    221 DONLEA DR · Mar 5, 2026 · 373 m away
  • Minor varianceApproved

    The proposal is to alter the existing detached dwelling by adding a second-story extension to the rear of the house.

    235 DONLEA DR · May 1, 2025 · 312 m away
  • Minor varianceApproved

    To construct a new semi-detached garage in the rear yard.

    42 THURSFIELD CRES · Sep 12, 2024 · 89 m away
  • Minor varianceApproved

    To construct a new semi-detached garage in the rear yard.

    40 THURSFIELD CRES · Sep 12, 2024 · 95 m away
  • Minor varianceApproved

    To construct a new one storey rear addition and deck

    2 THURSFIELD CRES · Apr 11, 2024 · 175 m away

Latest activity nearby

  • Building permit

    Back water valve installation

    113 RYKERT CRES · Nov 25, 2026 · 186 m away
  • Zoning review

    Not Started

    63 RYKERT CRES · Nov 23, 2026 · 277 m away
  • Building permit

    Proposal to install new solar panels on roof of existing residential detached single dwelling.

    79 BRENTCLIFFE RD · Nov 23, 2026 · 299 m away
  • Minor variancePending

    Accepted

    63 RYKERT CRES · Nov 19, 2026 · 277 m away
  • Building permit

    Revision 1: Interior alteration of an existing unoccupied commercial unit to Group D Banking Office.

    36 BRENTCLIFFE RD · Nov 12, 2026 · 240 m away
  • Minor varianceApproved

    The proposal consists of alterations to extend the basement portion of the dwelling, which is currently under construction.

    80 RYKERT CRES · Oct 29, 2026 · 207 m away
  • Zoning review

    Notice Sent

    82 RYKERT CRES · Oct 13, 2026 · 204 m away
  • Minor varianceApproved

    To construct a balcony (raised deck platform) at the rear of the existing two storey detached dwelling.

    72 RYKERT CRES · Sep 17, 2026 · 227 m away
  • Zoning review

    Notice Sent

    98 RYKERT CRES · Sep 14, 2026 · 183 m away
  • Building permit

    Revision 02: Add storage room in basement under new concrete porch above. Revision: UNDERPIN FULL BASEMENT, WIDEN STAIR, AND ADJUST LAYOUT OF SECOND FLOOR HALL BATHROOM

    68 RYKERT CRES · Aug 20, 2026 · 253 m away

Neighbourhood: Leaside-Bennington

About the area around the lot, not the lot itself.

Nearest station
Laird Station11 min walk
Nearest TTC stop
Eglinton Ave East at Brentcliffe Rd3 min walk
Nearest cycling route
Eglinton Ave EBike Lane, 1 min walk
Nearest traffic count
40,706 vehicles in 14 hEglinton Ave E / Brentcliffe Rd, 180 m away, Sep 30, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Serena Gundy Park3 min walk
Radar Park4 min walk
Leonard Linton Park5 min walk

Schools within 1 km

  • MARIA MONTESSORI SCHOOL Private 8 min walk
  • NORTHLEA ELEMENTARY & MDL SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLeaside-BenningtonMedian neighbourhood
Median household income (2020)$148,000$84,500
Households that own their home72%54%
Population (2021)16,53516,813
Homes built in 1960 or before67%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLeaside-BenningtonCity median
Assault212.9636.3
Robbery10.669.5
Auto theft298.1192.6
Theft over $5,00047.946.1
Break and enter181172.8
Theft from vehicles234.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.