HousePrecheckCheck an address

97 Railside RdToronto · zoning, lot size and permit records

Employment · E 1.0≈ 96.0 × 151.9 m9,033 m²on Railside Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 96.0 m frontage≈ 151.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (8% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (5% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (4% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit18 259161Closed

    Proposal for new fire alarm system and modification of existing sprinkler system for existing TCDSB elementary school

    Dec 19, 2018 · 97 RAILSIDE RD
  • Building permit17 267133Closed

    Proposed boiler plant retrofit within existing elementry school.

    Dec 1, 2017 · 97 RAILSIDE RD

Lot facts

Area
9,033 m²
Frontage
96 mestimated, irregular lot
Depth
151.9 mestimated, irregular lot
Street
Railside Rd
Corner lot
No
Public lane
None
House footprint
3,058 m²roof up to 10.5 m
Back yard
39.4 mhouse to rear lot line
Side yards
12.4 m and 13.9 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: apple, sargents (36 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the building back to industrial space and construct 3 new loading docks to the existing 1 loading dock to the front of the building.

    74 RAILSIDE RD · Jan 28, 2021 · 187 m away
  • Minor varianceApproved

    To allow a portion of the existing building space to be used for vehicular sales.

    103 RAILSIDE RD · Oct 24, 2019 · 145 m away
  • Minor varianceApproved

    Interior alterations to the existing structure.

    72 RAILSIDE RD · Mar 21, 2019 · 259 m away
  • Minor varianceApproved

    To permit the proposed expansion of the legal non-conforming recreation use by converting the existing east side parking lot into two outdoor soccer fields, with a seasonal enclosure during the winter months.

    101 RAILSIDE RD · Aug 25, 2016 · 99 m away

Latest activity nearby

  • Zoning review

    Application On Hold

    132 RAILSIDE RD · Jul 29, 2026 · 239 m away
  • Zoning review

    Cancelled

    132 RAILSIDE RD · Jul 28, 2026 · 239 m away
  • Building permit

    Proposed new Shed of 26.34 sq.m in rear yard of existing detached dwelling

    61 SUNDIAL CRES · Dec 3, 2025 · 162 m away
  • Building permit

    Proposal for interior alterations to portion of existing offices.

    150 RAILSIDE RD · Oct 20, 2025 · 283 m away
  • Building permit

    Elementary school renovation which includes the modification of existing washrooms, stage and classrooms and exterior brick repairs.

    150 CARNFORTH RD · Apr 30, 2025 · 233 m away
  • Building permitsecondary suite

    revision: Changing the fire separation between the units and keeping existing assembly

    201 SWEENEY DR · Mar 24, 2025 · 273 m away
  • Building permit

    Replacement of two 4" premise isolation backflow preventers to the existing food manufacturing plant.

    72 RAILSIDE RD · Mar 4, 2025 · 259 m away
  • Zoning review

    Closed

    73 RAILSIDE RD · Jan 29, 2025 · 164 m away
  • Building permitsecondary suite

    PROPOSAL TO LEGALIZE THE EXISTING UNIT IN THE BASEMENTEXISTING 1 STOREY - NO CHANGE TO THE FOOTPRINT OR THE EXTERIOR

    201 SWEENEY DR · Jan 21, 2025 · 273 m away
  • Building permit

    Proposal for interior alterations to existing office space for new partition walls

    109-111 RAILSIDE RD · Jan 14, 2025 · 223 m away

Neighbourhood: Victoria Village

About the area around the lot, not the lot itself.

Nearest station
Wynford Station21 min walk
Nearest TTC stop
74 Railside Rd3 min walk
Nearest cycling route
East Don River TrlMulti-Use Trail, 5 min walk
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Charles Sauriol Conservation Area3 min walk
Moccasin Trail Park8 min walk
Sweeney Park9 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE JEANNE LAJOIE French Public 4 min walk
  • SEERAH MISSION SCHOOL Private 7 min walk
  • ST CATHERINE CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • VICTORIA VILLAGE PUBLIC SCHOOL English Public 13 min walk
  • BRIGHTON SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureVictoria VillageMedian neighbourhood
Median household income (2020)$68,000$84,500
Households that own their home41%54%
Population (2021)17,36516,813
Homes built in 1960 or before29%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleVictoria VillageCity median
Assault591.2636.3
Robbery20.469.5
Auto theft285.4192.6
Theft over $5,00030.646.1
Break and enter208.9172.8
Theft from vehicles178.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.