HousePrecheckCheck an address

96 Scollard StToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c1.5; r2.0) SS1 (x2349)4.1 × 22.4 m91 m²on Scollard St

Not a home

Land without a building

A demolition permit (25 127782, 2025) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 24 175171 (To convert the existing two storey buildings at 96, 98 and 100 Scollard St. to an offic..., 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 78 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
4.1 m frontage22.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 155184 PRS 00 IV (Order Issued Property Standards: The yards and /or other part of property is not being..., 2026); 26 153764 PRS 00 IR (Property Standards, 2026); 26 111016 PRS 00 IR (Property Standards, 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 175171 (To convert the existing two storey buildings at 96, 98 and 100 Scollard St. to an offic..., 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0096/19TEY (To obtain consent for a technical severance to re-establish six lots which merged on ti..., 2019).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 78 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 188571 WST 00 IRClosed

    Waste

    Jun 21, 2026 · 96 SCOLLARD ST
  • By-law investigation26 155184 PRS 00 IVClosed

    Order Issued Property Standards: The yards and /or other part of property is not being kept clean and free of any conditions that are health, fire or other hazards.

    May 1, 2026 · 96 SCOLLARD ST
  • By-law investigation26 153764 PRS 00 IRClosed

    Property Standards

    May 1, 2026 · 96 SCOLLARD ST
  • By-law investigation26 153270 WST 00 IRClosed

    Waste

    Apr 30, 2026 · 96 SCOLLARD ST
  • By-law investigation26 146597 WST 00 IRClosed

    Waste

    Apr 20, 2026 · 96 SCOLLARD ST
  • By-law investigation26 137420 WST 00 IRClosed

    Waste

    Mar 31, 2026 · 96 SCOLLARD ST
  • By-law investigation26 111016 PRS 00 IRClosed

    Property Standards

    Jan 30, 2026 · 96 SCOLLARD ST
  • By-law investigation25 206686 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Aug 5, 2025 · 96 SCOLLARD ST
Show 15 older records
  • By-law investigation25 205061 WST 00 IRClosed

    Waste

    Aug 5, 2025 · 96 SCOLLARD ST
  • By-law investigation25 174937 WST 00 IRClosed

    Waste

    Jun 10, 2025 · 96 SCOLLARD ST
  • By-law investigation25 179809 PRS 00 IVClosed

    Order Issued Property Standards: The yards and /or other part of property is not being kept clean and free of any conditions that are health, fire or other hazards.

    May 27, 2025 · 96 SCOLLARD ST
  • By-law investigation25 166199 PRS 00 IRClosed

    Property Standards

    May 27, 2025 · 96 SCOLLARD ST
  • Building permit25 127782Cancelleddemolition

    Proposal to demolish the remainder of building due to fire damage.

    Mar 12, 2025 · 96 SCOLLARD ST
  • Building permit24 175171Response Received

    To convert the existing two storey buildings at 96, 98 and 100 Scollard St. to an office use. Scope of work includes two storey rear additions, partial third floor addition, third floor roof terrace, interior alterations, basement rear additions, rear yard deck, front porch and stairs, front chair lift, and front basement walkout stairs.

    Jul 5, 2024 · 96 SCOLLARD ST
  • Consent (lot split)B0096/19TEYApproved

    To obtain consent for a technical severance to re-establish six lots which merged on title within the Yorkville-Hazelton Heritage Conservation District.

    Dec 11, 2019 · 96 SCOLLARD ST
  • Zoning review19 189159 ZPRClosed
    Jul 15, 2019 · 96 SCOLLARD ST
  • Zoning review18 270003 LTOClosed
    Dec 19, 2018 · 96 SCOLLARD ST
  • Zoning review18 133800 ZPRClosed
    Mar 23, 2018 · 96 SCOLLARD ST
  • Zoning review17 232627 ZPRClosed
    Sep 14, 2017 · 96 SCOLLARD ST
  • Zoning review17 230737 ZPRClosed
    Sep 11, 2017 · 96 SCOLLARD ST
  • Zoning review15 222759 LTOClosed
    Sep 15, 2015 · 96 SCOLLARD ST
  • Building permit13 181687Closed

    Proposal for interior alterations to the 1st and 2nd floors of existing retail store, including a new stair between floors (100.0m2).

    Jul 10, 2013 · 96 SCOLLARD ST
  • Zoning review86 028482 LTOClosed
    Nov 3, 1986 · 96 SCOLLARD ST

Check before you build

  • Site-specific exception 900.11.10(2349)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2349)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a building may exceed a floor space index of 1.5 by 0.5, if the lot area is less than 139.35 square metres

  2. Rule B

    On the lands, an eating establishment , take-out eating establishment , personal service shop which cleans apparel, pet services , laboratory , motion picture production studio , club , vehicle fuel station , public parking , vehicle washing establishment , vehicle service shop , funeral home , veterinary hospital , recreation use , retail service for photocopying and printing services, retail store for the sale of animals, pets, firearms, taxidermy and auctioned items, or a vehicle dealership or massage therapy is not a permitted use. [TO: 438-86; 12 (2) 23]

  3. Older by-law A

    Section 12(1) 335 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

2 parts for other addresses
  • C On 87 Scollard St., former City of Toronto by-laws 258-75 and 236-81
  • D On or between the odd numbered addresses of 109-119 Scollard St., 100 Yorkville Ave., 80 Yorkville Ave., City of Toronto by-law 192-03.
By-law 569-2013, Chapter 900

Lot facts

Area
91 m²
Frontage
4.1 m
Depth
22.4 m
Street
Scollard St
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 211, 225. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.0 (c1.5; r2.0) SS1 (x2349) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%45 of 48 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
35

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 48 variance decisions: more than at 83% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    1235 BAY ST · Oct 14, 2026 · 229 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).

    131 DAVENPORT RD · Oct 7, 2026 · 286 m away
  • Minor varianceApproved

    To alter the development standards for the mixed-use building (as approved under Site Specific Zoning By-law 687-2021 (amended under City Wide Zoning By-law 569-2013)), by increasing the height of certain roof elements by 0.8 metres, and increasing the non-residential and residential gross floor areas. The overall building height (including the mechanical penthouse) will be 143.2 m. There will be a total of 323 rental residential dwelling units on this lot.

    33 AVENUE RD · Sep 23, 2026 · 247 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    874 YONGE ST · Aug 5, 2026 · 335 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

    27-29 YORKVILLE AVE · Jul 15, 2026 · 269 m away

Latest activity nearby

  • Building permit

    1 wall sign + 1 projecting sign***HELLO NORI***

    1250 BAY ST · Nov 24, 2026 · 213 m away
  • Building permit

    REVISION - conflicts with the existing building services that necessitated the relocation of the proposed washroomsRemove, relocate and reconfigure interior non loading partitions, adjust hvac, lighting and plumbing to suit new layout.

    100 BLOOR ST W · Nov 24, 2026 · 279 m away
  • Building permit

    INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802

    50 YORKVILLE AVE · Nov 16, 2026 · 230 m away
  • Building permit

    Proposal for fire alarm system panel repair (Edwards EST3 to EST4)

    118 YORKVILLE AVE · Nov 10, 2026 · 188 m away
  • Building permit

    2 wall signs + 1 projecting sign**DOLCE VITA**

    83 YORKVILLE AVE · Nov 6, 2026 · 127 m away
  • Building permit

    MECHANICAL SHAFT IN SOUTH STAIRWELL

    1200 BAY ST · Nov 6, 2026 · 282 m away
  • Building permit

    Proposal to remove existing sprinklers as required, supply and install up to sixteen (16) new upright sprinklers, supply and install up to one hundred and eight (108) new concealed sprinklers c/w white cover plates, and supply and install up to three new 10lbs ABC rated standard dry chemical fire extinguishers c/w wall mounting brackets.

    100 BLOOR ST W · Nov 4, 2026 · 279 m away
  • Zoning review

    Closed

    122 CUMBERLAND ST · Oct 30, 2026 · 189 m away
  • Building permit

    2 wall signs + 1 projecting sign**DOLCE VITA**

    83 YORKVILLE AVE · Oct 26, 2026 · 127 m away
  • Building permit

    Poposal for an interior alteration.

    3 MC ALPINE ST · Oct 26, 2026 · 247 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Bay Station4 min walk
Nearest TTC stop
Bay St at Scollard St2 min walk
Nearest cycling route
Bay StBike Lane, 2 min walk
Nearest traffic count
2,953 vehicles in 8 hYorkville Ave / Bellair St, 110 m away, Dec 8, 2015
Serious collisions within 500 m
102021–2026, killed or seriously injured: 3 fatal, 5 with pedestrians, 2 with cyclists
Parks
Jesse Ketchum Park1 min walk
Village of Yorkville Park3 min walk
Town Hall Square5 min walk

Schools within 1 km

  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 2 min walk
  • CAREER QUEST - TORONTO Private 3 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 6 min walk
  • ROSEDALE DAY SCHOOL Private 6 min walk
  • THE SHIRE SCHOOL Private 8 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.