Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 96 Glengarry Ave
96 Glengarry Ave is on a 7.4 m by 32.5 m lot on Glengarry Ave in Lawrence Park North. The zoning is R. A site-specific exception, 900.2.10(604), changes some of the usual rules for this address. The lot also fronts Greer Rd.
The City has 7 records on this lot since 2009. That is more than at 97% of Toronto houses. In 2010, a building permit was filed: "Installation of solar hot water system, certified plans 09-148269-01". Status: closed. In 2010, a building permit was filed: "Two storey dwelling". Status: closed. In 2010, a Committee of Adjustment application was filed: "The is an application to permit access to the third floor in order to be used for habitable space. the applicants were before committee twice previously…". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Lawrence station is a 9-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.2.10(604)Moderate
- No permit for a second unit on fileLowFree check
- 6 City trees in front of this lotLowFree check
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2010-08-18 | Building permit10 226781 | Installation of solar hot water system, certified plans 09-148269-01 | Closed | |
| 2010-08-16 | Building permit09 174205 | Two storey dwelling | Closed | |
| 2010-04-14 | Minor varianceA0067/10NY | The is an application to permit access to the third floor in order to be used for habitable space. The applicants were before Committee twice previously (A108/09NY and A0321/09NY) and was granted variances to the Gross Floor Area of 82.3% (202.55 square metres) and a west side yard setback of 0.31m. The applications were approved with the conditions that no living or habitable space be located on the third floor, no stairs leading to the third floor and the dormer windows in the roof be non-operational. The intention of these conditions was to limit the future possibility of conversion of the third floor into habitable space which would increase the Gross Floor Area significantly. The applicants are before committee once again to seek permission for increased GFA which would be a result of the third floor space being converted to livable or habitable space. | Approved | |
| 2009-11-05 | Building permit09 174210 | One storey dwelling | Closed | |
| 2009-09-30 | Minor varianceA0321/09NY | This is an application to permit the construction of a new two storey dwelling. The property was previously subject to minor variance application (A0108/09NY) for a second storey addition above the existing dwelling which was considered by the Committee of Adjustment on May 27,2009. The Committee of Adjustment approved the application for west side yard setback of 0.31metres, and gross floor area of 202.55 square metres. The applicants have had to apply again to the Committee of Adjustment to recognize the similar variances but now for a new dwelling since more than 50% of the existing walls were demolished. | Approved | |
| 2009-05-27 | Minor varianceA0108/09NY | This is an application to permit the construction of a second storey addition on the existing one storey dwelling. The elevation shows the dwelling to have a third storey, however, the added height provides for some vaulted ceilings and the dormer windows are decorative only. There will be not habitable space above the second storey. | Approved | |
| 2009-04-21 | Building permit09 128199 | Underpin foundation walls, lower basement floor by 14"; Block up west side entrance doorway and remove stair on main floor. | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(604)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(604)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
6 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(604)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Garden suite: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (f7.5; d0.6) (x604)
- Height limit
- 11 m
- Corner lot
- Yes, also on Greer Rd
- Public lane
- None
- New house permit
- 2010
- House footprint
- 118 m²
- Back yard
- 12.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- In the Lawrence station area
- 12 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Lawrence Park North neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Lawrence StationNearest station9 min walk
- Lawrence Ave West at Greer RdNearest TTC stop2 min walk
- Jedburgh RdNearest cycling route4 min walk
- Lawrence Park Collegiate InstituteSchool5 min walk
- Blessed Sacrament Catholic Elementary SchoolSchool8 min walk
- John Wanless Jr Public SchoolSchool9 min walk
- Glenview Sr Public SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3265.5
- Robberycity median 69.542.2
- Auto theftcity median 192.696.5
- Theft over $5,000city median 46.118.1
- Break and entercity median 172.8235.3
- Theft from vehiclescity median 188.1175
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist