HousePrecheckCheck an address

955 Queen St WToronto · zoning, lot size and permit records

Also 107A Crawford St, 107B Crawford St, 109A Crawford St, 109B Crawford St, 110 Massey St and 11 more

Commercial residential · CR 3.0 (c1.5; r2.5) SS2 (x1770)39.7 × 71.7 m2,837 m²on Massey Stcorner, also on Queen St Wbacks onto Ln S Queen E Crawford

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 15 134922 (interior alterations to condo suite #514, 2015, status Inspection); 13 225551 (To complete interior alterations (47 m2) to the ground floor lobby of the existing mult..., 2013, status Inspection); 13 140799 (Proposal for interior alterations to existing PH18 in existing condo building, 2013, status Inspection); and 2 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • Major Transit Station Area: King-LibertyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
39.7 m frontage71.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 5 building permits open, the oldest since 2010

    Needs a closer look

    Still open in the City's records: 15 134922 (interior alterations to condo suite #514, 2015, status Inspection); 13 225551 (To complete interior alterations (47 m2) to the ground floor lobby of the existing mult..., 2013, status Inspection); 13 140799 (Proposal for interior alterations to existing PH18 in existing condo building, 2013, status Inspection); and 2 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 102217 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 250711Closed

    LOCALIZED PARKING GARAGE CONCRETE REPAIRS, DRAIN REPLACEMENT AND WATERPROOFING REPAIRS.

    Jan 13, 2025 · 955 QUEEN ST W
  • By-law investigation25 102217 PRS 00 IRClosed

    Property Standards

    Jan 8, 2025 · 965 QUEEN ST W
  • Building permit19 194733Closed

    Proposal to change the use of the existing office space to education (elementary school)

    Aug 26, 2019 · 969 QUEEN ST W
  • Zoning review17 207126 LTOClosed
    Jul 28, 2017 · 955 QUEEN ST W
  • Zoning review17 150898 LPRCancelled
    Apr 28, 2017 · 955 QUEEN ST W
  • Zoning review17 149136 LPRApplication On Hold
    Apr 25, 2017 · 955 QUEEN ST W
  • Building permit16 271010Closed

    Relocation and new fixtures in an existing unit. - UNIT 419

    Jan 11, 2017 · 955 QUEEN ST W
  • Zoning review16 191149 LTOClosed
    Jul 15, 2016 · 955 QUEEN ST W
Show 13 older records
  • Building permit15 134922Inspection

    interior alterations to condo suite #514

    May 14, 2015 · 955 QUEEN ST W
  • Building permit13 225551Inspection

    To complete interior alterations (47 m2) to the ground floor lobby of the existing multi unit building.

    Sep 13, 2013 · 955 QUEEN ST W
  • Building permit13 140799Inspection

    Proposal for interior alterations to existing PH18 in existing condo building.

    Apr 18, 2013 · 955 QUEEN ST W
  • Building permit11 282560Revision Issued

    Revision for additional opening between Units 122 and 104 and minor alterations.

    Feb 28, 2012 · 955 QUEEN ST W
  • Building permit10 241138Inspection

    Installation of a six(6) antennae mast on top of the mechanical penthouse of this building. There will also be a radio unit attached to the wall of the mechanical penthouse on the roof. The top panel of the antennas will be approx. 5m in height.

    Sep 13, 2010 · 955 QUEEN ST W
  • Zoning review10 201902 LTOClosed
    Jun 21, 2010 · 955 QUEEN ST W
  • Building permit10 109465Closed

    Proposal to install 1 backflow prevention device in an exisitng 6 storey apartment building with ground floor retail.

    Jan 27, 2010 · 955 QUEEN ST W
  • Zoning review07 109765 ZPUClosed
    Feb 16, 2007 · 955 QUEEN ST W
  • Zoning review04 128322 PLOClosed
    Apr 27, 2004 · 955 QUEEN ST W
  • Zoning review00 012026 LTOClosed
    Jan 10, 2000 · 969 QUEEN ST W
  • Zoning review94 024666 LTOClosed
    Mar 23, 1994 · 969 QUEEN ST W
  • Zoning review87 030312 LTOClosed
    Jul 27, 1987 · 969 QUEEN ST W
  • Zoning review84 026819 LTOClosed
    Aug 31, 1984 · 969 QUEEN ST W

Check before you build

  • Site-specific exception 900.11.10(1770)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1770)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 287 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  3. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 287 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
2,837 m²
Frontage
39.7 m
Depth
71.7 m
Street
Massey St
Corner lot
Yes, also on Queen St W71.7 m along it
Public lane
Ln S Queen E Crawford, 83.9 m along it
Max height
16 m
Max lot coverage
—
  • Major Transit Station Area: King-Liberty. The lot is inside the King-Liberty Major Transit Station Area approved by the Province (Site and Area Specific Policy 687). Source
  • Garrison Common North Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c1.5; r2.5) SS2 (x1770) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 18 City trees in front of this lot. The City's street tree inventory lists 18 trees at this address: maple, silver (30 cm), maple, silver (25 cm), honey locust (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%33 of 36 decisions
Garden suite permits
0
Laneway suite permits
13
Multiplex permits
7
Development applications
4

Within 300 m, last 10 years. 20 suite and multiplex permits: more than at 88% of Toronto houses (median 3). 36 variance decisions: more than at 70% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a nightclub use on the second storey (with a third storey ancillary use) within the existing three-storey non-residential building. The existing use on the ground level (eating/drinking establishment) will be maintained and unaltered.

    1032 QUEEN ST W · Oct 21, 2026 · 477 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 686-2023(OLT)) for an 18-storey mixed-use building (which is currently under construction), by constructing one additional storey. There will be a total of 243 residential dwelling units on this lot.

    950 KING ST W · Apr 29, 2026 · 351 m away
  • Minor varianceApproved

    To construct a new four-storey mixed-use building containing five residential dwelling units, and one commercial unit (to be located on the ground floor). There will be front and rear patios (above portions of the third storey).

    26 OSSINGTON AVE · Feb 19, 2025 · 407 m away
  • Minor varianceApproved

    To alter the development standards as approved under Site Specific Zoning By-law 686-2023(OLT) for an 18-storey mixed-use building. There will be a total of 231 residential dwelling units on this lot.

    938 KING ST W · Oct 23, 2024 · 364 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing an outdoor sidewalk patio, abutting Argyle Street.

    114 OSSINGTON AVE · Aug 14, 2024 · 500 m away

Latest activity nearby

  • Building permit

    Back water valve installation

    160 STRACHAN AVE · Nov 16, 2026 · 131 m away
  • Building permit

    PROPOSED REAR SECOND STORY ADDITION AND INTERIOR ALTERATION

    119 SHAW ST · Nov 12, 2026 · 163 m away
  • Zoning review

    Application On Hold

    927 QUEEN ST W · Nov 10, 2026 · 138 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition with a juliet balcony.

    106 MASSEY ST · Nov 4, 2026 · 36 m away
  • Building permit

    INTERIOR ALTERATIONS TO THE BASEMENT ONLYTO AUTHORIZE THE CONSTRUCTION OF STALLS

    942 QUEEN ST W · Oct 30, 2026 · 179 m away
  • Building permit

    Proposed roof repairs to existing wood deck, guards and pergola on the roof and rear 3rd storey deck.

    883 QUEEN ST W · Oct 13, 2026 · 243 m away
  • Zoning review

    Closed

    72 STAFFORD ST · Sep 21, 2026 · 294 m away
  • Zoning review

    Closed

    927 QUEEN ST W · Sep 18, 2026 · 138 m away
  • Building permit

    Permits, to allow temporary event tents, stage and pop food tents on the grounds of Trinity Bellwoods Park, Sept 19-20-21 2026

    790 QUEEN ST W · Sep 10, 2026 · 84 m away
  • Minor varianceDeferred

    To permit a hotel (to contain 62 rooms) and a restaurant use (at grade), including a gym in the basement level, within the existing three-storey non-residential building (vacant office uses). Also, to alter the existing building by constructing a new front canopy, two new interior stairwells and one new elevator for rooftop access (maintenance). There will be no parking spaces provided on-site.

    860 RICHMOND ST W · Sep 4, 2026 · 185 m away

Neighbourhood: West Queen West

About the area around the lot, not the lot itself.

Nearest station
Exhibition GO Station18 min walk
Nearest TTC stop
Queen St West at Strachan Ave2 min walk
Nearest cycling route
Strachan AveSharrows, 2 min walk
Nearest traffic count
6,998 vehicles in 8 hQueen St W / Strachan Ave / Trinity Dr, 120 m away, Jul 2, 2022
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 3 with cyclists
Parks
Trinity Bellwoods Park1 min walk
Stanley Park North - Toronto5 min walk
Joseph Workman Park6 min walk

Schools within 1 km

  • DISCOVERING MINDS MONTESSORI SCHOOL Private 4 min walk
  • GIVINS SHAW JR PUBLIC SCHOOL English Public 5 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 8 min walk
  • CHARLES G FRASER JR PUBLIC SCHOOL English Public 9 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • ECOLE ELEMENTAIRE PIERRE ELLIOTT TRUDEAU French Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest Queen WestMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home54%54%
Population (2021)13,17016,813
Homes built in 1960 or before14%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Queen WestCity median
Assault588.7636.3
Robbery51.869.5
Shootings6.510.5
Auto theft84.1192.6
Theft over $5,00019.446.1
Break and enter258.8172.8
Theft from vehicles181.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.