HousePrecheckCheck an address

950 Davenport RdToronto · zoning, lot size and permit records

Open space · OR134.5 × 172.4 m21,512 m²on Conrad Avecorner, also on Davenport Rd

Not a home

Hillcrest Park

The City of Toronto's real estate inventory lists Hillcrest Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
134.5 m frontage172.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Ravine and natural feature protection (35% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (29% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
21,512 m²
Frontage
134.5 m
Depth
172.4 m
Street
Conrad Ave
Corner lot
Yes, also on Davenport Rd172.4 m along it
Public lane
None
House footprint
145 m²roof up to 16.3 m
Back yard
127.8 mhouse to rear lot line
Side yards
5.9 m and 116.1 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 16 City trees in front of this lot. The City's street tree inventory lists 16 trees at this address: maple, norway (85 cm), black locust (83 cm), maple, norway (83 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%40 of 42 decisions
Garden suite permits
1
Laneway suite permits
2
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 42 variance decisions: more than at 77% of Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To construct a new rear two-storey detached ancillary building, abutting the laneway. This building will contain an integral garage within the basement level, and one laneway suite occupying all levels (with a second level (north) balcony) There will be a total of three residential dwelling units on this lot (two units within the main dwelling, and one unit within the ancillary building). The existing rear one-storey garage will be demolished.

    859 DAVENPORT RD · Dec 16, 2026 · 270 m away
  • Building permit

    REV 01: REDUCED SCOPE FROM ISSUED PERMIT: REMOVE INTERIOR STRUCTURAL WALL ON THE GROUND FLOOR; ADD NEW BEAM AND COLUMNS; ADD NEW COLUMNS AND FOOTINGS IN THE BASEMENT; RE-ARRANGE KITCHEN AND ALTER NON BEARING WALLS IN THE LIVING-DINGING ROOMS. PREVIOUS ALTERATION OF EXTERIOR WALLS WITH INSULATION HAS BEEN DELETED; REVISIONS TO THE BASEMENT STAIR AND UTILITY ROOM PARTITIONS HAS BEEN DELETED. REAR MASONRY BEARING WALL REMOVAL IS DELETED.

    31 HILLCREST DR · Nov 25, 2026 · 115 m away
  • Minor variancePending

    To alter the existing rear one-storey ancillary building (detached two-car garage) by constructing a complete second storey addition to contain a second storey garden suite. There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

    50 BRAEMORE GDNS · Nov 19, 2026 · 182 m away
  • Building permit

    Rev 01 - Enlargement of existing third floor roof deck and minor interior changes to 2nd floor renoProposal for interior alterations (basement 26.3 sq m, ground - third floors 159.2 sq m), replacement of 2 existing roof decks

    1035 DAVENPORT RD · Nov 5, 2026 · 162 m away
  • Building permit

    Existing garage superstructure to be demolished. Concrete slab to remain as parking pad. A replacement garage is proposed and will be the subject of a separate building permit application once design is complete.

    406 CHRISTIE ST · Nov 3, 2026 · 204 m away
  • Zoning review

    Notice Sent

    50 BRAEMORE GDNS · Oct 14, 2026 · 182 m away
  • Zoning review

    Notice Sent

    859 DAVENPORT RD · Oct 13, 2026 · 270 m away
  • Building permit

    Admin permit for work at 58 Marchmount - 26-238273 SR

    56 MARCHMOUNT RD · Sep 21, 2026 · 281 m away
  • Building permit

    Proposed to re-build front porch and step, same size and location. 11.10m²

    58 MARCHMOUNT RD · Sep 21, 2026 · 284 m away
  • Minor variancePending

    To legalize and to maintain the two-storey side (north) addition of the detached dwelling (with a one-storey rear addition, an oversized driveway, an integral garage, and a rear ground floor walkout with stairs), which was constructed beyond the limits of an authorized building permit.

    11 BRACONDALE HILL RD · Sep 17, 2026 · 257 m away

Neighbourhood: Wychwood

About the area around the lot, not the lot itself.

Nearest station
St Clair West Station20 min walk
Nearest TTC stop
Christie St at Davenport Rd2 min walk
Nearest cycling route
Davenport RdBike Lane, 1 min walk
Nearest traffic count
13,066 vehicles in 14 hDavenport Rd / Rains Ave, 110 m away, Jan 20, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Hillcrest Park1 min walk
Marian Engel Park4 min walk
Wychwood Barns Park6 min walk

Schools within 1 km

  • ST BRUNO AND ST RAYMOND CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • WINONA DRIVE SR PUBLIC SCHOOL English Public 8 min walk
  • MCMURRICH JR PUBLIC SCHOOL English Public 9 min walk
  • HILLCREST COMMUNITY SCHOOL English Public 13 min walk
  • ESSEX JR SR & HAWTHORNE TWO BILINGUAL English Public 14 min walk
  • UCHENNA ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWychwoodMedian neighbourhood
Median household income (2020)$86,000$84,500
Households that own their home51%54%
Population (2021)12,80016,813
Homes built in 1960 or before53%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWychwoodCity median
Assault722636.3
Robbery2669.5
Homicide135.3
Auto theft188.6192.6
Theft over $5,00032.546.1
Break and enter234.1172.8
Theft from vehicles130.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.