Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 26 134392 (Proposal for concrete repairs, 2026); 26 109754 (Proposal to add new field devices and control relays to the existing fire alarm system..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications17 development applications open within 300 m
Good to know17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications1 short-term rental registrations here
Good to know1 active short-term rental registration at this address (Condominium).
What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.
How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details
City of Toronto, Short-term Rental Registrations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
4 records on file: more than at 88% of Toronto houses (median 0).
- Building permit26 134392Inspection
Proposal for concrete repairs.
Apr 16, 2026 · 95 LOMBARD ST - Building permit26 109754Permit Issued
Proposal to add new field devices and control relays to the existing fire alarm system for CSA-B44 elevator modernization
Mar 2, 2026 · 95 LOMBARD ST - Building permit09 143954Closed
Proposal to install Back Flow Preventor and Thermal expansion tank on existing 2" line
Jun 10, 2009 · 95 LOMBARD ST - Building permit03 120966Closed
Install 3 electro-magnetic locking devices (on 1st, 2nd & 3rd bsmt. levels one on each level)
Apr 3, 2003 · 95 LOMBARD ST
Check before you build
Site-specific exception 900.11.10(2352)
Needs a closer look3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 333 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law H
On 95 Lombard St. and 111 Lombard St., former City of Toronto by-law 245-86
6 parts for other addresses
- C On 90 Adelaide St. E., former City of Toronto by-laws 711-77 and 96-0140
- D On 120 Adelaide St. E., the even numbered addresses of 132-134 Adelaide St. E., 142 Adelaide St. E., former City of Toronto by-law 245-86
- E On 69 Lombard St., former City of Toronto by-law 96-0140
- F On 76 Lombard St., former City of Toronto by-law 658-91
- G On 77 Lombard St., former City of Toronto by-laws 711-77 and 96-0140
- I On 79R Richmond St. E., former City of Toronto by-law 658-91.
Lot facts
- Area
- 614 m²
- Frontage
- 20.8 m
- Depth
- 34.1 m
- Street
- Lombard St
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c0.5; r4.0) SS1 (x2352) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: ginkgo (14 cm), ginkgo (12 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 95%19 of 20 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 42
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 256 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 405 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 400 m away - Minor varianceApproved
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
225 JARVIS ST · May 7, 2025 · 498 m away - Minor varianceApproved
To alter the existing three-storey detached building by constructing a fourth storey addition, and a rear four-storey addition. This building will contain a total of 18 dwelling rooms (multi-tenant house).
75 MUTUAL ST · Apr 9, 2025 · 470 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 238 m away - Building permit
To allow small make up air unit (serving garage vestibules and lobby) to be installed in garbage room. OBC 2012 3.6.3.3.(11) notes no other service equipment shall be installed within a room where the refuse chute discharges.
125 GEORGE ST · Nov 25, 2026 · 186 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 174 m away - Building permit
nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements
50 RICHMOND ST E · Nov 19, 2026 · 285 m away - Building permit
Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.
19 TORONTO ST · Nov 16, 2026 · 275 m away - Building permit
Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.
124 CHURCH ST · Nov 16, 2026 · 184 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 50 m away - Building permit
Demolition and reconstruction of staircase, podium slab, and wall with waterproofing repairs
200 KING ST E · Oct 27, 2026 · 273 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 166 m away - Building permit
FS - Sprinkler Shop Drawing - Proposal for interior back to base of existing vacant suites (1300 +1500) - landlord work.
1 TORONTO ST · Oct 26, 2026 · 294 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station8 min walk
- Nearest TTC stop
- Queen St East at Jarvis St3 min walk
- Nearest cycling route
- Adelaide St ECycle Track, 1 min walk
- Nearest traffic count
- 29,580 vehicles in 14 hRichmond St E / Jarvis St, 90 m away, Jul 3, 2025
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 2 fatal, 8 with pedestrians, 2 with cyclists
- Parks
- St. James Park1 min walk
- Market Lane Park3 min walk
- Courthouse Square Park4 min walk
Schools within 1 km
- KEYSTONE INTERNATIONAL SCHOOLS Private 4 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 4 min walk
- VICTORIA STREET LINC English Public 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 8 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 8 min walk
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.