HousePrecheckCheck an address

95 La Rose AveToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f24.0; u103; au67.0; d1.53) (x113)≈ 91.4 × 120.2 m9,101 m²on La Rose Avecorner, also on Timothy Crt

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.9 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 24 182095 (fire protection back flow preventor install, 2024, status Inspection); 24 167910 (plumbing interior service replacement to back flow preventor, 2024, status Inspection); 24 141126 (Proposal for watermain replacement, 2024, status Inspection); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 7 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 91.4 m frontage≈ 120.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 24 182095 (fire protection back flow preventor install, 2024, status Inspection); 24 167910 (plumbing interior service replacement to back flow preventor, 2024, status Inspection); 24 141126 (Proposal for watermain replacement, 2024, status Inspection); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 7 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation25 114392 ELS 00 IRClosed

    Election Signs

    Feb 8, 2025 · 95 LA ROSE AVE
  • Building permit24 182095Inspection

    fire protection back flow preventor install.

    Jul 31, 2024 · 95 LA ROSE AVE
  • Building permit24 167910Inspection

    plumbing interior service replacement to back flow preventor

    Jul 31, 2024 · 95 LA ROSE AVE
  • Building permit24 141126Inspection

    Proposal for watermain replacement

    May 16, 2024 · 95 LA ROSE AVE
  • Building permit13 250891Permit Issued

    Backflow Prevention Devices (Water only) installation.

    Nov 4, 2013 · 95 LA ROSE AVE
  • Building permit04 135308Closed - Dormant

    Exit Lobby finishes to condominium apartment building

    May 21, 2004 · 95 LA ROSE AVE
  • Building permit99 116656Closed

    Install two magnetic locks to apartment building. This permit is for the maglocks in the garage not the unit 1001

    Feb 2, 2000 · 95 LA ROSE AVE

Check before you build

  • Site-specific exception 900.8.10(113)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(113)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    On 95 La Rose Ave., former City of Etobicoke By-law No. 1982-122.

By-law 569-2013, Chapter 900

Lot facts

Area
9,101 m²
Frontage
91.4 mestimated, irregular lot
Depth
120.2 mestimated, irregular lot
Street
La Rose Ave
Corner lot
Yes, also on Timothy Crt120.2 m along it
Public lane
None
Max height
—
Max lot coverage
20%
  • Minimum frontage 24 m. Frontage is about 91.4 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RAC (f24.0; u103; au67.0; d1.53) (x113) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
75%3 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for existing boiler/mechanical room slab repairs and waterproofing (associated to Penhouse 5, 6, 9, 10) - SEE 26 262397 WNP 00 VI

    45 LA ROSE AVE · Nov 2, 2026 · 290 m away
  • Building permitnew building

    Proposed construction of an Emergency Exit Building (EEB-1) at 75 Richview Road for the ECWE

    75 RICHVIEW RD · Sep 1, 2026 · 207 m away
  • Minor varianceRefused

    To construct an 8-storey apartment building that will contain 211residential units and one level of underground parking. The proposed building will be located along the west side of the property. The existing apartment building located along the on the east side of the property will be maintained.

    45 LA ROSE AVE · May 28, 2026 · 290 m away
  • Building permit

    PROPOSED INTERIOR ALTERATION ON MAIN FLOOR TO REMOVE A LOAD BEARING WALL

    54 LA ROSE AVE · Apr 17, 2026 · 206 m away
  • Building permit

    Revision 01 - New Aluminum railing total length is 900 metres.----------------------------------------------------------------Proposal for concrete repairs on ten drops of balconies in 15 floors of the building, waterproofing/painting the balconies and rebrushing steel panel railings on these drops

    45 LA ROSE AVE · Jan 12, 2026 · 290 m away
  • Building permit

    Proposed retaining wall replacement.

    123 LA ROSE AVE · Jul 30, 2025 · 199 m away
  • Building permit

    Proposal to perform structural concrete repairs, in the parking garage entrance/exit ramp.

    61 RICHVIEW RD · May 6, 2025 · 261 m away
  • Building permit

    PROPOSAL FOR THE REPLACEMENT OF BALCONY RAILINGS, BALCONY SLAB WATERPROOFING, ISOLATED REPAIR OF BALCONY CONCRETE SLABS AND BUILDING CLADDING SYSTEM

    61 RICHVIEW RD · Apr 23, 2025 · 261 m away
  • Zoning review

    Notice Sent

    45 LA ROSE AVE · Mar 18, 2025 · 290 m away
  • Building permit

    Localized Garage Repairs

    40 RICHVIEW RD · Feb 21, 2025 · 274 m away

Neighbourhood: Humber Heights-Westmount

About the area around the lot, not the lot itself.

Nearest station
Weston GO Station27 min walk
Nearest TTC stop
La Rose Ave at Timothy Crt1 min walk
Nearest cycling route
Eglinton Ave West TrlMulti-Use Trail - Boulevard, 4 min walk
Nearest traffic count
4,126 vehicles in 8 hLa Rose Ave / Arcade Dr, 250 m away, Nov 1, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
La Rose Park1 min walk
Westmount Park2 min walk
Buttonwood Park5 min walk

Schools within 1 km

  • ST DEMETRIUS CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • INSTITUTE OF CANADIAN EDUCATION Private 6 min walk
  • WESTMOUNT JR SCHOOL English Public 7 min walk
  • HOLY ANGELS CATHOLIC SCHOOL English Separate 10 min walk
  • ALL SAINTS CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber Heights-WestmountMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home61%54%
Population (2021)10,00516,813
Homes built in 1960 or before26%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber Heights-WestmountCity median
Assault405.6636.3
Robbery88.269.5
Shootings8.810.5
Auto theft220.5192.6
Theft over $5,00035.346.1
Break and enter114.6172.8
Theft from vehicles88.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.