HousePrecheckCheck an address

95 King St EDowntown Yonge East, Toronto · City records before you offer

Also 93A King St E, 93 King St E, 97 King St E

15.7 × 29.5 m457 m²on King St E

2 things to check before you offer, including heritage property: designated (Part IV)
N10 m
15.7 m frontage29.5 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 95 King St E

95 King St E is on a 15.7 m by 29.5 m lot on King St E in Downtown Yonge East. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 37 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2021, a building permit was filed: "Revision 01- revision to change interior partitions and washroomsinterior alterations to units b101 & b102 in basementconversion of commercial school and…". Status: closed. In 2020, a building permit was filed: "Proposal for interior alterations to existing office". Status: closed. In 2017, a building permit was filed: "Proposal to construct interior alterations for a business and personal services use". Status: closed. Nothing on file is open right now.

Within 300 m, 18 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 12 minor variance applications in the last 10 years and approved 92%. King station is a 4-minute walk.

Summary

What the City's records show on this house

  • Heritage property: designated (Part IV)Moderate
  • Zoning not in By-law 569-2013Moderate
  • 18 development applications open within 300 mLowFree check
  • 2 City trees in front of this lotLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Clear

Open City files

How much in the City's records needs answers before an offer

  • No open orders or by-law investigations
  • No permits left open for years
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

37 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-12-19Zoning review
25 268242 LPR
No description on fileClosed
2021-05-21Building permit
19 186656
Revision 01- revision to change interior partitions and washroomsInterior alterations to units B101 & B102 in basementConversion of commercial school and laboratory class A to massage establishment, spa and salonClosed
2020-12-03Building permit
20 221546
Proposal for interior alterations to existing officeClosed
2019-11-28Zoning review
19 254862 LTO
No description on fileClosed
2018-10-24Consent (lot split)
B0064/18TEY
To obtain consent to re-establish an easement/right-of-way.Approved
2018-05-11Zoning review
18 157454 ZZC
No description on fileClosed
2017-11-27Building permit
17 261288
Proposal to construct interior alterations for a business and personal services use.Closed
2017-08-18Development application
17 219094 STE 28 CD
Draft Plan of Standard Condominium to permit a 25-storey mixed-use building with retail at grade and 254 residential units above. A total of 169 vehicular parking spaces are proposed.Closed
2016-07-29Building permit
16 186503
Proposal to install a 2 inch backflow prevention device.Closed
2015-11-18Building permit
15 127478
In conjunction with a development presentation centre on the premises, proposal to erect and display one illuminated wall sign at the first storey of the northerly elevation. The proposed sign is to be 5.07 metres in length by .088 metres in width, at a height of 4.38 metres. **Sixty Colborne**Closed
2015-07-31Zoning review
15 199898 LPR
No description on fileClosed
2015-02-27Building permit
15 110991
Proposed interior alterations to convert existing fast food restaurant to a residential sales centre.Closed
2013-12-10Building permit
13 268823
To construct a demising wall on the 3rd floor of the existing office building.Closed
2013-04-02Building permit
13 113188
Proposal to install kitchen exhaust hood, ecology unit and make up air unit in an existing less than 30 seats restaurant. "Frank's Hotdog Factory".Closed
2012-06-14Building permit
12 183447
Interior alterations to existing restaurant on ground floor and basement.Closed
2012-05-29Building permit
11 238679
Minor revision to layout of existing restaurant. Occupant load to remain.Cancelled
2012-03-29Development application
12 145905 STE 28 OZ
Application update and partial resubmission on September 26, 2016: Rezoning application for 79-91 King St E to permit a 25-storey (77m in height excluding mechanical penthouse) mixed-use building with a 4-storey podium and 3 levels of underground parking. The podium component occupies the entire footprint of the site. Tower floorplate is 625 sq. metres. The proposal includes 169 dwelling units on floors 5-25, a private club (Albany Club) spanning floors 1-4, and ground floor retail.Closed
2012-03-23Building permit
11 211514
Revision to reduce the scope of work to opereate a bar Training Space on lower level. Occupant load - 35. Tender - 'Bartender One". The bartender training area in the basement is no longer part of the restaurant which is on the ground level. Separate permit is required for the alterations of the restaurant on the ground level.Closed
2012-02-29Development application
12 130075 STE 28 OZ
Proposal to construct a 25 storey, 77.3 metre (82.3 metres including mechanical penthouse) mixed-use building including 281 residential condominium units and 890 square metres of commercial uses at grade. The proposal also includes five levels of below-grade parking with 186 vehicle parking spaces. The proposal is for 54-70 Colborne Street & 101 King Street East. Also see site plan application 12 130079 STE 28 SAClosed
2012-02-29Development application
12 130079 STE 28 SA
Proposal to construct a 25 storey, 77.3 metre (82.3 metres including mechanical penthouse) mixed-use building including 281 residential condominium units and 890 square metres of commercial uses at grade. The proposal also includes five levels of below-grade parking with 186 vehicle parking spaces. The proposal is for 54-70 Colborne Street & 101 King Street East.Closed
2012-02-22Building permit
12 121632
Proposal for interior alterations to existing office space on the 2nd floor - suite 201).Closed
2012-02-01Building permit
12 106006
permit for interior alterations to existing office space - floor 2 - suite 201 - Edgecombe Property ManagersClosed
2011-02-14Zoning review
11 125742 LPR
No description on fileClosed
2009-11-24Building permit
09 169646
REVISION: There is some interior layout changes to the restaurant seating located at the front of the restaurant. Permit for interior alterations to create new restaurant less than 30 seats - PASTABILITIESClosed
2009-11-09Building permit
09 169651
REVISION: The kitchen exhaust is to be relocated from original plans. Kitchen exhaust permit for new restaurant - see 09 169646 BLD for building permit - Permit for interior alterations to create new restaurant less than 30 seats - PASTABILITIESClosed
2008-01-07Building permit
07 286412
Make interior alterations to ground floor office.Closed
2005-05-27Zoning review
05 136488 ZSV
No description on fileClosed
2003-07-10Building permit
03 154523
Relocate one maglock on 3rd floor ( as a result of a relocated door )Closed
2001-12-21Building permit
01 197127
Install 5 maglocks (2- 2nd floor, 2 - 3rd floor and 1- 5th floor)Closed
2000-11-28Building permit
00 352989
install partitions on portion 2nd floor. tenant: CoheranteClosed
2000-04-13Building permit
99 118390
alter h.v.a.c. system on 5th floor. see bp# 99-118389 tenant: ninty five king street eastClosed
2000-04-11Building permit
99 118389
install partitions on 5th floor. tenant: ninty five king street eastClosed
1998-12-04Building permit
98 024507
ERECT PARTITIONS ON GROUND THROUGH 5TH FLOORS SSClosed
1998-11-23Building permit
98 023149
ALTER OPENINGS IN WEST AND REAR ELEVATIONS AND EXTEND EXISTING SPRINKLER SYSTEM ON FIRST FLOOR AND INSTALL SPRINKLER SYSTEM ON THE 2ND TO THE 5TH FLOORS. /LMClosed
1984-07-31Zoning review
84 026723 LTO
No description on fileClosed
1983-08-02Zoning review
83 026147 LTO
No description on fileClosed
1981-03-27Zoning review
81 030098 LTO
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Zoning not in By-law 569-2013

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 2 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
15.7 m frontage29.5 m deepon King St E
Zone
—
Height limit
—
Corner lot
No
Public lane
None
House footprint
394 m²
Back yard
0 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 18 development applications open within 300 m, up to 80 storeys
    • 12 minor variance decisions within 300 m, 92% approved

    What this part means for this house, in plain EnglishUnlock

    1. 18 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • King StationNearest station4 min walk
    • King St East at Church St West SideNearest TTC stop1 min walk
    • Adelaide St ENearest cycling route3 min walk
    • Keystone International SchoolsSchool2 min walk
    • Victoria Street LincSchool5 min walk
    • George Brown College - St James CampusSchool6 min walk
    • Downtown Alternative SchoolSchool7 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    1 question for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 95 King St E

    2 things to check at 95 King St E before you offer

    • Heritage property: designated (Part IV)Moderate
    • Zoning not in By-law 569-2013Moderate
    • 18 development applications open within 300 mLow
    • 2 City trees in front of this lotLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 4 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.