HousePrecheckCheck an address

95 Humber College BlvdToronto · zoning, lot size and permit records

Institutional · IH (x2)≈ 99.0 × 117.4 m6,929 m²on Alicewood Crt

Not a home

A hospital

The zoning by-law sets this parcel aside for a hospital. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A hospital nearbyAmbulances and sirens, traffic and parking at shift changes; care and jobs close by.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Humber CollegeThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 99.0 m frontage≈ 117.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (14% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (6% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (31% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit12 106757Closed

    Installation of new sprinkler system for an existing retirement home facility.

    Feb 21, 2012 · 95 HUMBER COLLEGE BLVD
  • Building permit06 193153Closed

    Installation of one new mag-lock

    Dec 11, 2006 · 95 HUMBER COLLEGE BLVD
  • Building permit02 170440Closed - Dormant

    8 Mag-Locks for Nursing Home

    Oct 10, 2002 · 95 HUMBER COLLEGE BLVD

Check before you build

  • Site-specific exception 900.31.10(2)

    Needs a closer look

    3 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.31.10(2)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    A single nursing home use is permitted provided: (i) the maximum height of the nursing home is the lesser of 3 storeys and 12.0 metres; (ii) the nursing home is have a maximum of 160 bed-sitting rooms ; and (iii) there must be a minimum of 21 parking spaces provided for the nursing home

  2. Rule B

    A single medical office building is permitted if: (i) the maximum height of the medical office building is the lesser of 4 storeys and 16.0 metres; and (ii) parking must be provided at the minimum rate of 3.0 spaces for each 100 square metres used as a financial institution or pharmacy and at a minimum rate of 5.5 parking spaces for each 100 square metres used for all other offices uses in the building

  3. Rule C

    On the date of the enactment of this By-law: (i) the maximum lot coverage is equal to the area of the lot covered by all building and structures ; (ii) the permitted maximum gross floor area for all buildings on a lot is not exceed the gross floor area of all building existing on the lot ; (iii) the minimum number of required parking spaces is not be reduced to less than the number of parking spaces existing or required; and (iv) the maximum height for any part of a building is equal to the existing height of that part of the building .

By-law 569-2013, Chapter 900

Lot facts

Area
6,929 m²
Frontage
99 mestimated, irregular lot
Depth
117.4 mestimated, irregular lot
Street
Alicewood Crt
Corner lot
No
Public lane
None
House footprint
1,579 m²roof up to 13.2 m
Back yard
—house to rear lot line
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Humber College. The lot is inside the Humber College Major Transit Station Area approved by the Province (Site and Area Specific Policy 636). Source
  • Zone IH (x2) (Institutional Hospital). Chapter 80, section 80.20 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a four-storey (including the mechanical penthouse) hospital expansion along the west side of the building and to construct a free-standing seven-storey (including the mechanical penthouse) Ancillary Services Building (containing ambulatory health clinics, doctor's office, Humber College classrooms, labs and offices and retail spaces).

    101 HUMBER COLLEGE BLVD · Jun 4, 2015 · 329 m away

Latest activity nearby

  • Building permit

    Supply and install back water valve

    25 ALICEWOOD CRT · Nov 9, 2026 · 294 m away
  • Building permitmultiplex, secondary suite

    Proposed interior alterations for conversion of single family dwelling into triplex.

    75 ALICEWOOD CRT · Jun 26, 2026 · 135 m away
  • Building permitmultiplex

    Proposed interior alterations to convert existing single family dwelling to triplex.

    59 ALICEWOOD CRT · Mar 5, 2026 · 147 m away
  • Zoning review

    Notice Sent

    52 ALICEWOOD CRT · Jun 11, 2025 · 225 m away
  • Building permitmultiplex

    Proposal to convert to a four unit rental.

    41 ALICEWOOD CRT · Jan 29, 2025 · 216 m away
  • Minor varianceApproved

    To convert the existing dwelling into a fourplex.

    41 ALICEWOOD CRT · Nov 7, 2024 · 216 m away
  • Building permit

    Proposal to install a back water valve

    43 ALICEWOOD CRT · Oct 23, 2024 · 202 m away
  • Building permitsecondary suite

    PROPOSED EXISTING BASEMENT TO CONVERT TO SECOND UNIT (37 SQ.M) AND INTERIOR ALTERATION

    49 ALICEWOOD CRT · Jun 17, 2024 · 159 m away
  • Building permitsecondary suite

    Proposed interior alterations to convert basement into a 2nd suite

    49 ALICEWOOD CRT · Jun 6, 2024 · 159 m away
  • Building permit

    CONVERTING EXISTING GARAGE INTO GYM.CAR PARLING WILL BE USED AS EXISTING DRIVEWAYPROPOSED REAR DOOR AND WINDOW AT THE REAR WALL OF PROPOSED GYM AREA.PROPOSED 3.48MX0.99M POWDER ROOM IN THE PROPOSED GYM AREA.

    52 ALICEWOOD CRT · Mar 28, 2023 · 225 m away

Neighbourhood: West Humber-Clairville

About the area around the lot, not the lot itself.

Nearest station
Humber College Station8 min walk
Nearest TTC stop
Humber College Blvd at Westmore Dr - Etobicoke General Hospital7 min walk
Nearest cycling route
West Humber TrlMulti-Use Trail, 2 min walk
Nearest traffic count
7,139 vehicles in 8 hHumber College Blvd / Westmore Dr, 470 m away, Nov 24, 2014
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
West Humber Parkland1 min walk
Humber Gate Park5 min walk
Humber Arboretum5 min walk

Schools within 1 km

  • ALBION HEIGHTS JR MDL SCHOOL English Public 8 min walk
  • ST DOROTHY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • HUMBER COLLEGE SCHOOL - UNIVERSITY OF GUELPH BLDG College 12 min walk
  • HUMBER COLLEGE SCHOOL - NORTH CAMPUS College 14 min walk
  • WEST HUMBER COLLEGIATE INSTITUTE English Public 14 min walk
  • FATHER HENRY CARR CATHOLIC SECONDARY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest Humber-ClairvilleMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home65%54%
Population (2021)33,30016,813
Homes built in 1960 or before13%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Humber-ClairvilleCity median
Assault933636.3
Robbery152.469.5
Homicide2.75.3
Shootings26.710.5
Auto theft1320.6192.6
Theft over $5,000245.946.1
Break and enter347.5172.8
Theft from vehicles545.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.