HousePrecheckCheck an address

945 Alness StToronto · zoning, lot size and permit records

Also 1081 Alness St, 1083 Alness St, 1085 Alness St, 1087 Alness St, 947 Alness St and 14 more

Employment · EH 1.0 (x45)≈ 302.9 × 170.2 m38,393 m²on Alness St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 24 186031 (Proposal to install a new commercial cooler and freezer in an existing warehouse. Insta..., 2024, status Permit Issued); 24 171068 (Proposal to remove existing non-loadbearing cmu wall between units 947 and 949, 2024, status Permit Issued); 10 119353 (Install backflow preventer, 2010, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 302.9 m frontage≈ 170.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2010

    Needs a closer look

    Still open in the City's records: 24 186031 (Proposal to install a new commercial cooler and freezer in an existing warehouse. Insta..., 2024, status Permit Issued); 24 171068 (Proposal to remove existing non-loadbearing cmu wall between units 947 and 949, 2024, status Permit Issued); 10 119353 (Install backflow preventer, 2010, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit24 186031Permit Issued

    Proposal to install a new commercial cooler and freezer in an existing warehouse. Install nessessary rooftop equipment for coolers/freezer with structural reinforcing. Modify existing sprinkler system.

    Aug 27, 2024 · 947 ALNESS ST
  • Building permit24 171068Permit Issued

    Proposal to remove existing non-loadbearing cmu wall between units 947 and 949

    Aug 23, 2024 · 947 ALNESS ST
  • Building permit11 157427Closed

    Lowes Warehouse - Interior offices and new ramp on west side of building wharehouse only not open to the public. tg

    May 20, 2011 · 1081 ALNESS ST
  • Building permit10 119353Inspection

    Install backflow preventer

    Feb 23, 2010 · 945 ALNESS ST
  • Building permit03 145971Closed

    New intertior altertion to existing part of office area.

    Jun 17, 2003 · 945 ALNESS ST
  • Building permit02 141276Closed

    PROPOSED NEW INTERTIOR ALTERTION TO WAREHOUSE AT THE REAR AND OFFICE.

    Jun 17, 2002 · 945 ALNESS ST
  • Building permit00 145432Closed

    INTERIOR ALTERATIONS TO AN EXISTING OFFICE.

    Oct 23, 2000 · 945 ALNESS ST

Check before you build

  • Site-specific exception 900.22.10(45)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(45)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625. © City of Toronto 1998-2026

By-law 569-2013, Chapter 900

Lot facts

Area
38,393 m²
Frontage
302.9 mestimated, irregular lot
Depth
170.2 mestimated, irregular lot
Street
Alness St
Corner lot
No
Public lane
None
House footprint
6,445 m²roof up to 10.1 m
Back yard
13.4 mhouse to rear lot line
Side yards
7.7 m and 191.7 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 1.0 (x45) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust skyline (13 cm), honey locust (9 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing production studio to a post-secondary school use. Please be advised an application (A0668/15NY) with respect to the subject property was previously before the Committee of Adjustment on September 9, 2015. It was the decision of the Committee to APPROVE the application which sought a variance to permit a production studio use.

    907 ALNESS ST · Apr 7, 2016 · 193 m away
  • Minor varianceApproved

    To convert unit 121 into a production studio (226m²).

    907 ALNESS ST · Sep 9, 2015 · 193 m away

Latest activity nearby

  • Zoning review

    Cancelled

    40-76 MAGNETIC DR · Sep 21, 2026 · 247 m away
  • Zoning review

    Closed

    913 ALNESS ST · Aug 17, 2026 · 177 m away
  • Zoning review

    Cancelled

    40-76 MAGNETIC DR · Jul 21, 2026 · 247 m away
  • Building permit

    Rev 02: Amendment to existing permit 25 190668 HVA 00 MS to add wall mounted A/C unit to LAN Room on 2nd floor and to change exhaust fan in kitchen area to exhaust outside.Rev 01: changes to add a dropped acoustic tile ceiling on the 2nd floor. Lighting, HVAC and sprinkler layouts have been revised.HVAC - Proposal for interior alterations for the construction of new offices, washrooms, meeting spaces, lunchroom and elevator. New plumbing, new HVAC and electrical distribution and new sprinkler layout on 2nd floor. New lobby and barrier free entrance on the ground floor.

    850-894 ALNESS ST · Jun 4, 2026 · 297 m away
  • Zoning review

    Closed

    360 MAGNETIC DR · Feb 28, 2025 · 203 m away
  • Zoning review

    Closed

    850 MAGNETIC DR · Jan 31, 2025 · 246 m away
  • Building permit

    Proposal for interior alterations to architectural floor layout, sprinkler and HVAC systems.

    376-382 MAGNETIC DR · Oct 15, 2024 · 191 m away
  • Building permit

    Proposal to install a new commercial cooler and freezer in an existing warehouse. Install nessessary rooftop equipment for coolers/freezer with structural reinforcing. Modify existing sprinkler system.

    947 ALNESS ST · Aug 27, 2024 · 84 m away
  • Building permit

    Proposal to remove existing non-loadbearing cmu wall between units 947 and 949

    947 ALNESS ST · Aug 23, 2024 · 84 m away
  • Zoning review

    Closed

    40-76 MAGNETIC DR · Dec 13, 2023 · 247 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Finch West Station36 min walk
Nearest TTC stop
Alness St at Flint Rd2 min walk
Nearest cycling route
Supertest RdSharrows, 9 min walk
Nearest traffic count
9,073 vehicles in 8 hFlint Rd / Alness St, 190 m away, Dec 15, 2021
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
G. Ross Lord Park9 min walk

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.