HousePrecheckCheck an address

940 Progress AveToronto · zoning, lot size and permit records

≈ 213.1 × 173.1 m23,627 m²on Progress Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 11 114205 (Revision to add one more solar simulator3 roof simulators for instruction of solar pane..., 2011). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 17 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
≈ 213.1 m frontage≈ 173.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (9% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 140892 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 11 114205 (Revision to add one more solar simulator3 roof simulators for instruction of solar pane..., 2011).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A081/01SC (Conversion of existing building to student residence, 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 140892 PRS 00 IRClosed

    Property Standards

    Apr 9, 2026 · 940 PROGRESS AVE
  • Development application19 154849 ESC 24 OZClosed

    Official Plan and Zoning By-law Amendments related to the Centennial College Progress Campus. The combined applications set out to establish parameters and framework to guide growth on the campus over the next 20 years. No development of individual buildings is proposed as part of these combined applications. File closed due to inactivity.

    May 15, 2019 · 940 PROGRESS AVE · City file
  • Building permit17 184612Closed

    Proposed interior alterations to occur in east, south and west portions of the first floor for 10 new classrooms.

    Aug 2, 2017 · 940 PROGRESS AVE
  • Zoning review13 205587 PSPClosed
    Jul 17, 2013 · 940 PROGRESS AVE
  • Development application13 205209 ESC 38 SAClosed

    Metrolinx - SRT Centennial Station.NB: file has been closed due to City Council's October 2013 decision to proceed with the Scarborough Subway and MetroLinx's inactivity on the file.

    Jul 16, 2013 · 940 PROGRESS AVE
  • Building permit11 114205Under Review

    Revision to add one more solar simulator3 roof simulators for instruction of solar panel installation: storage room for batteries

    Jul 18, 2011 · 940 PROGRESS AVE
  • Building permit09 174610Closed

    Fire alarm system upgrade- 6 storey building

    Nov 12, 2009 · 940 PROGRESS AVE
  • Building permit08 121529Cancelled

    temp tent "Apr. 10 - 29" certified tent 06118717

    Mar 25, 2008 · 940 PROGRESS AVE
Show 5 older records
  • Building permit07 232093Closed

    Connection of services to new kitchen equipment & addition of exhaust fan

    Nov 19, 2007 · 940 PROGRESS AVE
  • Zoning review04 204201 LTOClosed
    Dec 30, 2004 · 940 PROGRESS AVE
  • Building permit04 156587Closed

    existing use: College Residence proposed use: Same work description: Make interior alterstion to existing kitchen

    Oct 15, 2004 · 940 PROGRESS AVE
  • Minor varianceA081/01SCApproved

    Conversion of existing building to student residence.

    May 23, 2001 · 940 PROGRESS AVE
  • Zoning review01 035787 ZSVClosed
    Apr 18, 2001 · 940 PROGRESS AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
23,627 m²
Frontage
213.1 mestimated, irregular lot
Depth
173.1 mestimated, irregular lot
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
5,147 m²roof up to 22.2 m
Back yard
29.3 mhouse to rear lot line
Side yards
38.1 m and 96 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    3

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved with conditions

      To permit the construction of a 6-storey addition that will connect to the existing 3-storey administration building. This addition is Centennial College's indigenization of the Campus as part of the College's response to the Truth and Reconciliation Commission Report. The purpose of the minor variance application is to increase the permitted gross floor area from 0.4 to 0.6 times the area of the lot.

      941 PROGRESS AVE · Nov 24, 2020 · 492 m away
    • Minor varianceApproved

      To permit the construction of a third storey addition to the northwest wing of the existing hotel to add 30 new suites (total 163 suites). Sixteen (16) new surface parking spaces will be added for a total of 157 spaces.

      50 ESTATE DR · Mar 5, 2020 · 267 m away
    • Minor varianceApproved

      To construct a new eight storey Student Residence and Culinary Arts Centre at the Centennial College Progress Campus.

      941 PROGRESS AVE · Jul 10, 2014 · 492 m away
    • Minor varianceApproved

      Proposal to use a 128 m2 commercial unit for a pharmacy.

      42 TUXEDO CRT · May 16, 2013 · 413 m away
    • Minor varianceApproved

      The owners are proposing to renovate the existing buildings on the subject property to provide a seating area in the Subway take-out restaurant and a new (2-4-1) pizza take-out store in a portion of the existing car-wash building. The owners have submitted revised plans to amend a site plan that was approved on October 3, 2006, as part of this application. The amendments include the renovations mentioned above and additional parking spaces for the Subway restaurant. In 2002, the Committee of Adjustment approved variances for retail sales (convenience store) including the take-out restaurant, a car wash facility with 18 stacking spaces and limited landscape area along Progress Avenue and Estate Drive.

      900 PROGRESS AVE · May 28, 2008 · 286 m away

    Latest activity nearby

    • Consent (lot split)Pending

      Accepted

      921-931 PROGRESS AVE · Oct 14, 2026 · 223 m away
    • Zoning review

      Closed

      930 PROGRESS AVE · Jul 22, 2026 · 159 m away
    • Development application

      Redevelopment of the lands consisting of, a 17-storey mixed use building containing apartment dwelling units intended for seniors, and a dedicated daycare/pre-school facility. The development will be phased. A 2-storey community centre/banquet hall, and, two new 39-storey residential buildings.The existing Place of Worship located at 920 Progress Avenue will be retained in situ, with a reconfigured access and pick-up/drop-off area.

      930 PROGRESS AVE · May 11, 2026 · 168 m away · City file
    • Zoning review

      Closed

      900 PROGRESS AVE · Jan 22, 2026 · 286 m away
    • Development application

      Site Plan Control Application proposes the development of a 1-storey restaurant in an existing vacant part of lot with two existing one-storey buildings.

      921-931 PROGRESS AVE · Oct 1, 2025 · 169 m away · City file
    • Zoning review

      Closed

      900 PROGRESS AVE · Aug 23, 2024 · 286 m away
    • Zoning review

      Notice Sent

      921-931 PROGRESS AVE · Jan 29, 2024 · 223 m away
    • Building permit

      Revision 01. HVAC - Kitchen Fire SuppressionPROPOSED: Remove existing no load bearing wall, new sinks, HVAC renovation

      930 PROGRESS AVE · Aug 1, 2023 · 159 m away
    • Zoning review

      Notice Sent

      60 ESTATE DR · Dec 1, 2022 · 245 m away
    • Zoning review

      Closed

      921-931 PROGRESS AVE · Jun 20, 2022 · 223 m away

    Neighbourhood: Woburn North

    About the area around the lot, not the lot itself.

    Nearest station
    McCowan Rt Station30 min walk
    Nearest TTC stop
    Progress Ave at Opposite Roadway to Centennial College2 min walk
    Nearest cycling route
    Ellesmere RdMulti-Use Trail - Boulevard, 14 min walk
    Nearest traffic count
    9,430 vehicles in 8 hHwy 401 Collectors E Ramp / Progress Ave / Progress Ave N, 140 m away, Jan 31, 2006
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Morningside Park4 min walk
    Trca Lands ( 77)6 min walk
    Woburn Park - Scarborough6 min walk

    Schools within 1 km

    • CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 8 min walk
    • WOBURN JR PUBLIC SCHOOL English Public 12 min walk
    • WOBURN COLLEGIATE INSTITUTE English Public 13 min walk
    • Z3 EDUCATION CENTRE SCHOOL Private 14 min walk
    • TALENTA ACADEMY Private 15 min walk
    • ST THOMAS MORE CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWoburn NorthMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home54%54%
    Population (2021)26,58016,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWoburn NorthCity median
    Assault768.9636.3
    Robbery76.569.5
    Shootings13.910.5
    Auto theft316.6192.6
    Theft over $5,00062.646.1
    Break and enter180.9172.8
    Theft from vehicles281.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.