HousePrecheckCheck an address

94 Queen's ParkToronto · zoning, lot size and permit records

Also 100 Queen's Park, 175 Bloor St W

117.3 × 155.2 m17,584 m²on Bloor St Wcorner, also on Queen's Park

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 251650 (A proposal to erect and display 2 ground signs, one wall sign and one overhanging struc..., 2026); 26 107983 (Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the..., 2026); 25 233409 (Proposed infill portion of south wall - facade retrofit after demolishing planetarium (..., 2025); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 9 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N50 m
117.3 m frontage155.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 31 building permits open, the oldest since 1999

    Needs a closer look

    Still open in the City's records: 23 223407 (Removal and disposal of existing HVAC system and installation of a new Air Handling Uni..., 2023, status Inspection); 22 218111 (Proposal to remove the existing 23m lengths of 38mm diamter fire hoses in every hose ca..., 2022, status Deficiency Notice Issued); 21 115584 (Proposal for interior alterations to existing museum, 2021, status Inspection); and 28 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 251650 (A proposal to erect and display 2 ground signs, one wall sign and one overhanging struc..., 2026); 26 107983 (Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the..., 2026); 25 233409 (Proposed infill portion of south wall - facade retrofit after demolishing planetarium (..., 2025); and 1 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0317/24TEY (To alter the existing institutional building (Royal Ontario Museum) by constructing a g..., 2024); A0613/03TEY (The applicant, The Royal Ontario Museum, is seeking relief from the provisions of Site..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

100 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 251650Permit Issued

    A proposal to erect and display 2 ground signs, one wall sign and one overhanging structure sign, all displaying static copy.***ROYAL ONTARIO MUSEUM***

    Nov 10, 2026 · 100 QUEEN'S PARK
  • Building permit26 166470Issuance Pending

    To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor.

    May 25, 2026 · 100 QUEEN'S PARK
  • Building permit26 107983Permit Issued

    Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the bridge at 90 Queen's Park (Which is connected to 100 QP) is demolished)

    Feb 13, 2026 · 100 QUEEN'S PARK
  • Building permit25 233409Permit Issued

    Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum)

    Nov 28, 2025 · 100 QUEEN'S PARK
  • Building permit25 227777Approved

    Alternative Solution for the proposed wood ceiling for the proposed renovations to the Royal Ontario Museum (ROM), related to permit #23_166554_BLD.

    Sep 19, 2025 · 100 QUEEN'S PARK
  • Building permit24 129322Closed

    HVAC - Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room.

    Jan 17, 2025 · 100 QUEEN'S PARK
  • Building permit24 225931Approved

    Proposal for an alternative solution to permit the use "street level entrance storey" in lieu of "first storey".

    Oct 15, 2024 · 100 QUEEN'S PARK
  • Minor varianceA0317/24TEYApproved

    To alter the existing institutional building (Royal Ontario Museum) by constructing a ground level canopy, fronting Bloor Street West, with front stairs, a ramp, and water features (fountains).

    Jun 12, 2024 · 100 QUEEN'S PARK
Show 92 older records
  • Building permit24 113916Closed

    Proposal for interior alteration to existing building for on-site alcohol storage collection laboratory

    Apr 5, 2024 · 100 QUEEN'S PARK
  • Building permit23 223407Inspection

    Removal and disposal of existing HVAC system and installation of a new Air Handling Unit (AHU SF-26)

    Dec 15, 2023 · 100 QUEEN'S PARK
  • Building permit23 166554Closed

    FS - Sprinkler Shop Drawing - Interior and Exterior renovations to the Royal Ontario Museum related to the Bloor Street entrance.

    Oct 11, 2023 · 100 QUEEN'S PARK
  • Building permit23 186135Closed

    Replacement of existing exterior private on-site fire water mains due to deterioration. Installation of underground concrete valve chamber on private property for future maintenance purposes.

    Sep 25, 2023 · 100 QUEEN'S PARK
  • Building permit23 164677Closed

    ERECT TEMPORARY STRUCTURE FOR THE TORONTO JAZZ FESTSTART DATE JUN 23, TEAR DOWN 25 JUN. 2023.

    Jun 22, 2023 · 100 QUEEN'S PARK
  • Building permit23 162753Closed

    Proposal to construct a temporary structure on the roadway for the Toronto Jazz Festival.Setup date is June 23, 2023 and dismantled on June 25, 2023.

    Jun 21, 2023 · 100 QUEEN'S PARK
  • Building permit22 218111Deficiency Notice Issued

    Proposal to remove the existing 23m lengths of 38mm diamter fire hoses in every hose cabinet within the building

    Oct 17, 2022 · 100 QUEEN'S PARK
  • Zoning review21 167384 ZPRClosed
    Jun 8, 2021 · 100 QUEEN'S PARK
  • Building permit21 115584Inspection

    Proposal for interior alterations to existing museum

    Feb 23, 2021 · 100 QUEEN'S PARK
  • Building permit20 222144Closed

    Proposal for interior alterations to existing museum for new gallery space

    Dec 18, 2020 · 100 QUEEN'S PARK
  • Building permit20 199982Permit Issued

    Stone masonry repairs, including steel shelf angle replacement and off site heritage steel window conservation at the north south and patrial west (south end) of the East Wing

    Oct 21, 2020 · 100 QUEEN'S PARK
  • Building permit19 264735Closed

    HVAC - Proposal to renovate Japan Gallery on the ground floor and convert it into a new event space.

    Apr 21, 2020 · 100 QUEEN'S PARK
  • Building permit16 214548Closed

    Revision # 01 - Mechanical related to reduce the scope of work to only include the work at the North West corner of the site for the Performance Terrace and Bloor Street Gardens. The area of work that has been deleted is from the main entrance off of Bloor Street to the Museum Subway Entrance.HVAC - Proposal to construct vestibule & canopy at Bloor St Entrance, extension of terrace at northwest corner, and landscaping/new benches along Bloor St and Queen's Park. ROM.

    Jul 18, 2019 · 100 QUEEN'S PARK
  • Building permit18 261107Closed

    HVAC - Proposal for interior alterations to the ground floor to create new meeting room in existing museum.

    Jan 8, 2019 · 100 QUEEN'S PARK
  • Zoning review18 114844 LTOClosed
    Feb 8, 2018 · 100 QUEEN'S PARK
  • Building permit17 228998Closed

    Propsed interior alterations to existng *Royal Ontario Museum* for an interior fit-out in the east block ticketing area.

    Sep 15, 2017 · 100 QUEEN'S PARK
  • Building permit17 205744Closed

    Proposal for 5 - Certified Tents, 30ft x 30ft (Cert. #14 251051) August 12 - 13, 2017.

    Aug 11, 2017 · 100 QUEEN'S PARK
  • Building permit16 264560Revision Issued

    Revision to entrance area.Proposal to replaceme Rotunda East entrance stairs, ramp and vestibule doors for accessible entrance and upgrade of the vestibule HVAC. ROM

    Jul 21, 2017 · 100 QUEEN'S PARK
  • Development application16 221931 STE 20 OZClosed

    Official Plan Amendment application to establish a new University of Toronto St. George Campus Secondary Plan that would replace the existing University of Toronto Secondary Plan.

    Sep 13, 2016 · 100 QUEEN'S PARK · City file
  • Building permit15 265149Inspection

    Proposal to install one maglock on ground exit door, "Royal Ontario Museum"

    Jan 19, 2016 · 100 QUEEN'S PARK
  • Building permit15 253244Cancelled

    Proposal to reconstruct the stairs and ramp located at the East Block front entrance - Royal Ontario Museum

    Jan 18, 2016 · 100 QUEEN'S PARK
  • Building permit15 244198Closed

    INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) - ( Royal Ontario Museum)

    Dec 1, 2015 · 100 QUEEN'S PARK
  • Building permit15 230852Closed

    Proposal to construct a temporary structure for "Nuit Blanche" of the grounds of ROM - setup date Oct 2/2015, dismantle date Oct 5/2015

    Oct 1, 2015 · 100 QUEEN'S PARK
  • Building permit13 274002Closed

    Proposal to remove existing fire hose cabinet located on the ground floor - centre block - at ladies washroom in existing museum - "ROM"

    Dec 20, 2013 · 100 QUEEN'S PARK
  • Building permit13 265763Closed

    Proposal for interior alterations to the washroom area on the ground floor of "ROM" (97.45m2). Proposal includes HVAC and PLB.

    Nov 29, 2013 · 100 QUEEN'S PARK
  • Building permit12 235987Permit Issued

    This is for interior alterations to the second floor to the "INVERTEBRATE ZOOLOGY LAB". This is the Royal Ontario Museum. This will also include HVAC.

    Nov 16, 2012 · 100 QUEEN'S PARK
  • Zoning review12 236004 LTOClosed
    Aug 27, 2012 · 100 QUEEN'S PARK
  • Building permit12 179545Closed

    Proposal to install Six tents;2-30ft x 100ft (11-176036) and 2 - 30ft x 50ft (11-176036) plus 2- 10 x 100'. Erection date: May 25, 2012/Removal May 26, 2012 . Taste of Toronto festival.

    May 25, 2012 · 100 QUEEN'S PARK
  • Building permit12 108957Closed

    permit to errect certified tent structure on North elevation (entrance) of the ROM - Errected Feb 15 - 2012 - Removed on Feb 17 2012 - CERT # 11 166654 BLD

    Jan 26, 2012 · 100 QUEEN'S PARK
  • Building permit11 282496Closed

    Proposal for fire alarm retrofit on all floors at "Royal Ontario Museum".

    Jan 26, 2012 · 100 QUEEN'S PARK
  • Building permit11 310036Inspection

    permit for interior alterations to existing museam - install a temporary warming kitchen on ground level south east section of building

    Dec 16, 2011 · 100 QUEEN'S PARK
  • Building permit11 208759Closed

    Proposal to erect 6 cert tents. 2-30'x100 (cert # 11 176036), 2-30'x50' (cert # 11 176036), and 2-10'x100' (cert # 11 176028). ROM. June 11-12/2011. "The Taste of Toronto".

    Jun 8, 2011 · 100 QUEEN'S PARK
  • Building permit10 317882Inspection

    Interior alterations to the waste area located on level B1. Also, there will be a new exterior platform at the B1 waste area location to facilitate the use of green organic waste bins complete with a new door opening. There will also be two new container and compactor openings at the same location.

    Feb 3, 2011 · 100 QUEEN'S PARK
  • Building permit10 237555Inspection

    This is for new platforms to be constructed at different locations of the property, new ladder systems, new platforms around the mechanical equipment on the roof and new heritage railings on the East portion of the building. Most of the work is to take place at the roof area.

    Jan 31, 2011 · 100 QUEEN'S PARK
  • Building permit10 205483Closed - Dormant

    renovation of two of the 3rd floor galleries,

    Jul 6, 2010 · 100 QUEEN'S PARK
  • Building permit10 182495Closed

    Proposal to erect non-certified tents (2-30'x100', 1-30'x50'). June 12-13/10. ROM. Maximum setup to removal is 31 days.

    May 31, 2010 · 100 QUEEN'S PARK
  • Building permit10 171447Closed

    intertior alterations to portion of 4th floor, room K417, by providing new dropped drywall ceiling c/w sprinklers, smoke detection and lights.

    May 12, 2010 · 100 QUEEN'S PARK
  • Building permit09 174344Closed - Dormant

    Reroute existing kitchen exhaust duct and install new paint spray booth.

    Dec 16, 2009 · 100 QUEEN'S PARK
  • Building permit09 142255Closed

    Proposal for interior alterations to the second floor, east wing of the Royal Ontario Museum.

    Jun 1, 2009 · 100 QUEEN'S PARK
  • Building permit08 209153Closed

    HVAC - Replace existing interior lift and stair with new ramp. 2nd Floor . Royal Ontario Museum

    Nov 12, 2008 · 100 QUEEN'S PARK
  • Building permit08 195888Cancelled

    Proposal for truss structure with suspended video screens (20.6sm) on south-west corner of property to be installed September 2, 2008 and to be dismantled on September 14, 2008. The ROM.

    Aug 21, 2008 · 100 QUEEN'S PARK
  • Building permit08 183328Closed - Dormant

    HVAC - Proposal for interior alterations to level 2B for "Storage Prep Room" - The ROM (49.7m2).

    Aug 12, 2008 · 100 QUEEN'S PARK
  • Building permit08 189624Inspection

    Proposal to install a new open metal access stair for maintenance between the 3rd and 4th floor roofs. ROM

    Aug 8, 2008 · 100 QUEEN'S PARK
  • Building permit08 172775Inspection

    HVAC - Interior alterations of existing gallery space for ROM museam - SCHAD Gallery - Centre Block Second Floor.

    Jul 17, 2008 · 100 QUEEN'S PARK
  • Building permit08 172784Inspection

    Interior alterations of existing gallery space for ROM museam - TECH Gallery - Second Floor North East.

    Jun 23, 2008 · 100 QUEEN'S PARK
  • Building permit08 118411Closed

    Install 11 door hold open devices in Royal Ontario Museum curatorial block.

    Apr 10, 2008 · 100 QUEEN'S PARK
  • Zoning review07 191111 ZSVClosed
    May 3, 2007 · 100 QUEEN'S PARK
  • Zoning review07 188130 ZPRClosed
    May 2, 2007 · 100 QUEEN'S PARK
  • Building permit06 127674Closed - Dormant

    New sprinkler system for Royal Ontario Museum addition

    Mar 13, 2007 · 100 QUEEN'S PARK
  • Zoning review07 113326 ZPRClosed
    Mar 5, 2007 · 100 QUEEN'S PARK
  • Zoning review06 163792 LTOClosed
    Aug 4, 2006 · 100 QUEEN'S PARK
  • Building permit05 134632Revision Issued

    Revision as dicussed with Kin Wah Chan.Upgrade fire alarm & security systems.

    Jul 31, 2006 · 100 QUEEN'S PARK
  • Building permit06 122233Closed - Dormant

    Make interior alterations for restaurant on 5th floor of ROM.

    Apr 27, 2006 · 100 QUEEN'S PARK
  • Building permit05 198464Inspection

    Construct interior wheelchair ramp in lower rotunda; make alterations to existing theatre area by enlarging stage area in theatre. (Re: Renaissance ROM - Lower Rotunda and Theatre)

    Jan 25, 2006 · 100 QUEEN'S PARK
  • Building permit05 201803Closed

    Erect temporary bleachers to be located on both sides of Queens Park in front of The ROM, for the Santa Clause Parade. To be erected on Nov 16/05 and dismantled Nov. 21/05

    Nov 17, 2005 · 100 QUEEN'S PARK
  • Zoning review05 180431 PRZClosed
    Sep 14, 2005 · 100 QUEEN'S PARK
  • Building permit05 168389Closed

    To erect temporary canopy for a period of 1 year starting September 2005 to south entrance of ROM

    Aug 24, 2005 · 100 QUEEN'S PARK
  • Building permit05 165654Closed - Dormant

    Make interior alterations on portion 1B and installing automated door openers on existing door for handicap access.

    Aug 11, 2005 · 100 QUEEN'S PARK
  • Building permit05 123704Closed

    Interior alterations to the Royal Ontario Museum for Cafeteria on ground floor, including 2 restaurants. Cafeteria: 345 seats, Cafe/rotunda: 80 seats.

    Jun 8, 2005 · 100 QUEEN'S PARK
  • Building permit05 135982Closed - Dormant

    Make interior alterations to existing gallery space on third level (west wing).

    May 26, 2005 · 100 QUEEN'S PARK
  • Building permit05 110849Permit Issued

    Revise original permit to include minor alterations to: Sprinkler system; Lighting; Emergency lighting and Exit signs associated with the Interior work for museum exhibit installation.

    May 2, 2005 · 100 QUEEN'S PARK
  • Building permit05 116021Permit Issued

    Interior alterations to add temporary exit corridor on 2nd floor west wing.

    Apr 6, 2005 · 100 QUEEN'S PARK
  • Building permit05 102958Closed - Dormant

    Interior alterations to existing exhibition location. (AS PER WADE TAM)

    Feb 17, 2005 · 100 QUEEN'S PARK
  • Building permit04 188884Cancelled

    Erect temporary bleachers to be located on both sides of Queens Park in front of The ROM, for the Santa Clause Parade. To be erected on Nov 17th/04 and deismantled on Nov 22/04

    Nov 5, 2004 · 100 QUEEN'S PARK
  • Building permit04 121137Inspection

    Make interior alterations to upgrade for alcohol storage and dispensing on the 2nd floor.Existing & Proposed: ROM

    Jul 12, 2004 · 100 QUEEN'S PARK
  • Building permit03 179096Inspection

    Make interior alterations & construct addition to existing museum (ROM). New construction: Group A: 1, 344 m. sq.; Group B: 12, 952 m. sq. Group E: 874 m. sq. Alterations (total): 13, 267 m. sq.See C. of A. Decision

    Jul 2, 2004 · 100 QUEEN'S PARK
  • Building permit04 146605Closed - Dormant

    Interior alterations and partial demolition for new exhibition

    Jun 17, 2004 · 100 QUEEN'S PARK
  • Building permit04 134797Closed

    Install 1 maglock at 4th floor - stacks area

    May 13, 2004 · 100 QUEEN'S PARK
  • Building permit04 119309Inspection

    Interior alterations to locker room

    Mar 25, 2004 · 100 QUEEN'S PARK
  • Building permit04 108102Inspection

    Structural core permit for elevation/stairs structural elements in connection with 03-179096--as per Mario Angelucci

    Mar 24, 2004 · 100 QUEEN'S PARK
  • Building permit04 112741Inspection

    Demolish interior demising walls; in connection with 03-179096 BLD.

    Mar 12, 2004 · 100 QUEEN'S PARK
  • Building permit03 194524Closed

    Site servicing for Royal Ontario Museum...in connection with permit#03-172731 PRT.

    Feb 4, 2004 · 100 QUEEN'S PARK
  • Building permit03 200855Inspection

    Partial permit for foundations in connection with B.P.#03-179096 BLD.

    Feb 2, 2004 · 100 QUEEN'S PARK
  • Building permit04 102659Inspection

    Make interior alterations to portion of 2nd floor (s/e wing)

    Jan 15, 2004 · 100 QUEEN'S PARK
  • Building permit03 200229Cancelled

    There is an identical application in already.

    Dec 12, 2003 · 100 QUEEN'S PARK
  • Building permit03 200247Inspection

    Proposed caisones for Royal Ontario Museum extention.refer to BP#03-179096 BLDExisting and proposed : ROMAs per Mario Angelucci

    Dec 12, 2003 · 100 QUEEN'S PARK
  • Minor varianceA0613/03TEYApproved

    The applicant, The Royal Ontario Museum, is seeking relief from the provisions of Site Specific By-law No. 340-2003, in order to construct an addition on the north side of the building. At its meeting of April 14, 15 and 16, 2003, City Council approved an amendment to the Zoning By-law to permit this addition. The addition will provide new gallery spaces and a new entrance on the Bloor Street frontage. The addition will be approximately 12,705 square metres with a maximum height of 37.1 metres.

    Dec 10, 2003 · 100 QUEEN'S PARK
  • Building permit03 174731Inspection

    Proposed shoring for Royal Ontario Museum extension. Refer to BP#179096 BLD.

    Nov 17, 2003 · 100 QUEEN'S PARK
  • Building permit03 190239Closed

    Erect temporary bleachers to be located on both sides of Queens park in front of the Royal Ontario Museum bldg., for the Santa Clause Parade- to be erected on Nov 12/03 and dismantled On Nov 17/2003.

    Nov 12, 2003 · 100 QUEEN'S PARK
  • Building permit03 179092Cancelled

    Construct addition & make interior alterations to existing museum (ROM)

    Sep 26, 2003 · 100 QUEEN'S PARK
  • Building permit03 146225Inspection

    Alter existing sprinkler system in connection with BP#03-135449 BLD.

    Jul 15, 2003 · 100 QUEEN'S PARK
  • Building permit03 149550Closed

    Install 2 new maglocks on floors 2B and 1B

    Jun 26, 2003 · 100 QUEEN'S PARK
  • Building permit03 135449Inspection

    Make interior alterations to ground floor (level 1) 1B and 2B of the North East Wing.LISTED HISTORICAL

    Jun 3, 2003 · 100 QUEEN'S PARK
  • Building permit03 116470Inspectiondemolition

    Demolition to terrace gallery and associated areas.Heritage Ok to be issued as per Mario

    May 23, 2003 · 100 QUEEN'S PARK
  • Building permit03 133069Closed

    Relocate 2 existing maglocks on level 1 and 1b and install 1 new maglock on 2b

    May 15, 2003 · 100 QUEEN'S PARK
  • Building permit02 195199Inspection

    make interior alterations to levels 2b, 1b, & ground level.

    Dec 16, 2002 · 100 QUEEN'S PARK
  • Building permit02 185728Closed

    erect temporary bleachers to be located on both sides of Queen's Park in front of the Royal Ontario Museum building for the Santa Claus Parade - to be erected Nov.13/02 and dismantled Nov.18/02. HISTORICAL

    Nov 7, 2002 · 100 QUEEN'S PARK
  • Zoning review02 176614 PRZClosed
    Sep 26, 2002 · 100 QUEEN'S PARK
  • Building permit01 195877Closed

    Erect temporary bleachers to be located on both sides of Queen's Park in front of the Royal Ontario Museum building for the Santa Claus parade to be erected on Nov. 16/01 and dismantled on Nov. 21/00

    Nov 19, 2001 · 100 QUEEN'S PARK
  • Building permit99 104375Inspection

    install two(2) electromagnetic locks

    Oct 21, 1999 · 100 QUEEN'S PARK
  • Building permit98 021513Closed

    INSTALL PLUMBING FIXTURES 1ST FL: 2 W.C. REFER TO APPLICATION NUMBER: 417114

    Oct 20, 1998 · 100 QUEEN'S PARK
  • Building permit98 020584Closed

    MAKE ALTERATIONS AND INSTALL PARTITIONS ON THE FIRST AND SECOND FLOORS OF THE PLANETARIUM FOR PROPOSED EXHIBIT (CHILDRENS OWN MUSEUM). (CONV. ADDRESS FOR 100 QUEEN'S PARK "HISTORICAL" /LM

    Sep 9, 1998 · 100 QUEEN'S PARK

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
17,584 m²
Frontage
117.3 m
Depth
155.2 m
Street
Bloor St W
Corner lot
Yes, also on Queen's Park155.2 m along it
Public lane
None
House footprint
13,817 m²
Back yard
0.5 mhouse to rear lot line
Side yards
1.1 m and 8 mhouse to side lot lines
Buildings on the lot
34house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    86%12 of 14 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    20

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards for the mixed-use building (as approved under Site Specific Zoning By-law 687-2021 (amended under City Wide Zoning By-law 569-2013)), by increasing the height of certain roof elements by 0.8 metres, and increasing the non-residential and residential gross floor areas. The overall building height (including the mechanical penthouse) will be 143.2 m. There will be a total of 323 rental residential dwelling units on this lot.

      33 AVENUE RD · Sep 23, 2026 · 320 m away
    • Minor varianceRefused

      To permit one 36-storey mixed-use building, which will span across two lots, for a private student residence use. There will be a total of 426 dwelling units, and 220.5 m² of non-residential retail uses (at-grade) within this building. The properties municipally known as 208 Bloor Street West and 210 Bloor Street West are currently under separate ownership and governed by separate Site-Specific Zoning By-laws (By-law 782-2022(OLT), and By-law 778-2024). In the near future, both properties will merge on title under one single entity to facilitate this new development. There is a current Site Plan Control application (No. 21 220574 STE 11 SA) which is currently under review and consideration.

      208 BLOOR ST W · Jul 8, 2026 · 131 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition, rear second and third storey juliet balconies, and a rear basement walkout.

      33 LOWTHER AVE · Jul 8, 2026 · 330 m away
    • Minor varianceRefused

      To permit one 36-storey mixed-use building, which will span across two lots, for a private student residence use. There will be a total of 426 dwelling units, and 220.5 m² of non-residential retail uses (at-grade) within this building. The properties municipally known as 208 Bloor Street West and 210 Bloor Street West are currently under separate ownership and governed by separate Site-Specific Zoning By-laws (By-law 782-2022(OLT), and By-law 778-2024). In the near future, both properties will merge on title under one single entity to facilitate this new development. There is a current Site Plan Control application (No. 21 220574 STE 11 SA) which is currently under review and consideration.

      210 BLOOR ST W · Jul 8, 2026 · 137 m away
    • Minor varianceApproved

      To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.

      106 SCOLLARD ST · Jun 10, 2026 · 490 m away

    Latest activity nearby

    • Zoning review

      Application On Hold

      153 BLOOR ST W · Nov 24, 2026 · 112 m away
    • Building permit

      Repairs to the existing 8th Floor Pool Deck and 8th Floor Men's Locker Room, including: waterproofing repairs, structural concrete repairs, interior finish repairs.

      220 BLOOR ST W · Nov 20, 2026 · 145 m away
    • Zoning review

      Not Started

      150 BLOOR ST W · Nov 19, 2026 · 177 m away
    • Building permit

      Proposed interior alterations to ground-floor Suite 103 for Delysees restaurant (Group A-2), including partitions, fire separations, washrooms, structural partition framing, HVAC and plumbing.

      151 BLOOR ST W · Nov 19, 2026 · 152 m away
    • Building permit

      A proposal to erect and display 2 ground signs, one wall sign and one overhanging structure sign, all displaying static copy.***ROYAL ONTARIO MUSEUM***

      100 QUEEN'S PARK · Nov 10, 2026 · 43 m away
    • Building permit

      Addition of new exterior door, construction of new interior partition, reinstallation of interior metal cornertrim piece.

      170 BLOOR ST W · Nov 9, 2026 · 105 m away
    • Building permit

      Replace existing roof mounted exhaust fans (EF-2.1,29,30), Replace existing pumps, CP-5 and CP-6 found in mechanical room E045, Replace existing pump, CP-11 and CP-14 found in mechanical room 55, Replace existing pump, M-42 found in mechanical room 55, Replace the existing air handling units, AHU-311 and AHU-319 within 3rd floor mechanical rooms in 311 and 319.

      80 QUEEN'S PARK · Nov 4, 2026 · 152 m away
    • Building permit

      Proposed fire alarm panel replacement

      157 BLOOR ST W · Nov 4, 2026 · 128 m away
    • Building permit

      Proposal for installation of roof edge railings and ladder port at TTC's St. George Station - Bedford Entrance.

      8 BEDFORD RD · Oct 28, 2026 · 267 m away
    • Building permit

      The owner is undertaking an upgrade to the parking access control system, including the overhead coiling door operator, access control hardware, and associated system components.

      9 BEDFORD RD · Oct 27, 2026 · 239 m away

    Neighbourhood: University

    About the area around the lot, not the lot itself.

    Nearest station
    Museum Station2 min walk
    Nearest TTC stop
    Bloor St West at Queens Park1 min walk
    Nearest cycling route
    Queen's Park CresCycle Track, 1 min walk
    Nearest traffic count
    13,375 vehicles in 14 hBloor St W: Queen's Park - Bedford Rd, 100 m away, Apr 10, 2024
    Serious collisions within 500 m
    102021–2026, killed or seriously injured: 3 fatal, 4 with pedestrians, 5 with cyclists
    Parks
    Bloor - Bedford Parkette4 min walk
    Queen's Park4 min walk
    Village of Yorkville Park4 min walk

    Schools within 1 km

    • ROSEDALE DAY SCHOOL Private 3 min walk
    • THE SHIRE SCHOOL Private 4 min walk
    • CAREER QUEST - TORONTO Private 5 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT THE OBSERVATORY - U OF T, BLDG 89 University 5 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 6 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 6 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureUniversityMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home39%54%
    Population (2021)6,43516,813
    Homes built in 1960 or before59%29%
    Homes needing major repairs11%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleUniversityCity median
    Assault1740.5636.3
    Robbery133.969.5
    Homicide12.25.3
    Auto theft182.6192.6
    Theft over $5,000121.746.1
    Break and enter730.3172.8
    Theft from vehicles353188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.