HousePrecheckCheck an address

925 Albion RdToronto · zoning, lot size and permit records

≈ 147.6 × 272.8 m19,689 m²on Riverdale Drcorner, also on Albion Rd

Not a home

Village Green Park

The City of Toronto's real estate inventory lists Village Green Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 06 175033 (Structural reinforcement associated with the installation of new rooftop unit to a comm..., 2006, status Inspection); 06 173570 (Boiler units replacement and new rooftop unit installation with associated structural r..., 2006, status Inspection); 03 165632 (Addition of 3 storey elevator structure and interior alterations to existing community..., 2004, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 7 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 147.6 m frontage≈ 272.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (11% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (8% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 3 building permits open, the oldest since 2004

    Needs a closer look

    Still open in the City's records: 06 175033 (Structural reinforcement associated with the installation of new rooftop unit to a comm..., 2006, status Inspection); 06 173570 (Boiler units replacement and new rooftop unit installation with associated structural r..., 2006, status Inspection); 03 165632 (Addition of 3 storey elevator structure and interior alterations to existing community..., 2004, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (18% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 7 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Zoning review09 175172 ZPUClosed
    Oct 2, 2009 · 925 ALBION RD
  • Zoning review08 166294 ZPUClosed
    Jun 5, 2008 · 925 ALBION RD
  • Zoning review08 154727 ZPRCancelled
    May 5, 2008 · 925 ALBION RD
  • Building permit06 175033Inspection

    Structural reinforcement associated with the installation of new rooftop unit to a community centre. Related Mechanical Permit 06-173570.

    Sep 22, 2006 · 925 ALBION RD
  • Building permit06 173570Inspection

    Boiler units replacement and new rooftop unit installation with associated structural reinforcement to an existing community centre. Refer to 06 175033 for structural component of the project.

    Sep 20, 2006 · 925 ALBION RD
  • Zoning review05 157644 ZPRClosed
    Jul 8, 2005 · 925 ALBION RD
  • Building permit03 165632Inspection

    Addition of 3 storey elevator structure and interior alterations to existing community centre.

    May 28, 2004 · 925 ALBION RD
  • Building permit02 172968Closed

    Fire Alarm system upgrade to Community Centre

    Oct 31, 2002 · 925 ALBION RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
19,689 m²
Frontage
147.6 mestimated, irregular lot
Depth
272.8 mestimated, irregular lot
Street
Riverdale Dr
Corner lot
Yes, also on Albion Rd272.8 m along it
Public lane
None
House footprint
2,380 m²roof up to 14.5 m
Back yard
104.3 mhouse to rear lot line
Side yards
9 m and 83.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 17 City trees in front of this lot. The City's street tree inventory lists 17 trees at this address: maple, silver (60 cm), black locust (37 cm), black locust (32 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%10 of 10 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
2

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a parking deficiency to accommodate a new restaurant.

    900 ALBION RD · Feb 12, 2026 · 305 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    15 COLLEGE ST · Aug 28, 2025 · 135 m away
  • Minor varianceApproved

    To construct a two storey front addition, and a second storey addition above the existing attached garage. This will be considered a new dwelling.

    34 GROVETREE RD · May 1, 2025 · 345 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    18 BATAWA CRES · Feb 6, 2025 · 227 m away
  • Minor varianceApproved

    To permit the rear below grade addition. A previous Committee of Adjustment application (A0043/21EYK) approved variances related to floor space index, building length, and platform encroachment.

    14 COLLEGE ST · Jan 23, 2025 · 90 m away

Latest activity nearby

  • Minor varianceDeferred

    To construct a new detached dwelling with an attached garage.

    8 MCGILLIVRAY AVE · Dec 3, 2026 · 238 m away
  • Building permit

    Proposed balcony construction

    979 A ALBION RD · Oct 20, 2026 · 94 m away
  • Zoning review

    Closed

    1048 ALBION RD · Oct 6, 2026 · 203 m away
  • Zoning review

    Closed

    999 ALBION RD · Oct 5, 2026 · 122 m away
  • Building permit

    Structural fire Damage restoration

    837 ALBION RD · Aug 28, 2026 · 293 m away
  • Building permit

    Proposal of renovations to basement, including new washrooms and barrier-free passenger elevating device.

    950-994 ALBION RD · Aug 14, 2026 · 129 m away
  • Building permit

    Revision 01: Approved covered ramp to be uncovered. Addition to create an interior ramp as an addition and interior alteration to create an elevator at an existing Place of Worship - "Mount Olive Seventh-Day Adventist Church"

    1030 ALBION RD · May 28, 2026 · 174 m away
  • Zoning review

    Closed

    959 ALBION RD · May 11, 2026 · 42 m away
  • Zoning review

    Closed

    1048 ALBION RD · May 7, 2026 · 203 m away
  • Zoning review

    Closed

    8 MCGILLIVRAY AVE · Mar 31, 2026 · 238 m away

Neighbourhood: Thistletown-Beaumond Heights

About the area around the lot, not the lot itself.

Nearest station
Rowntree Mills Station21 min walk
Nearest TTC stop
Albion Rd at Thistle Down Blvd North Side2 min walk
Nearest cycling route
West Humber TrlMulti-Use Trail, 7 min walk
Nearest traffic count
23,341 vehicles in 14 hAlbion Rd / Thistle Down Blvd / Riverdale Dr, 140 m away, Nov 9, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Village Green Park1 min walk
Thistletown Park2 min walk
West Humber Parkland5 min walk

Schools within 1 km

  • ST NOEL CHABANEL CATHOLIC ELEMENTARY SCHOOL French Separate 4 min walk
  • ST JOHN VIANNEY CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • RIVERCREST JR SCHOOL English Public 13 min walk
  • THISTLETOWN COLLEGIATE INSTITUTE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThistletown-Beaumond HeightsMedian neighbourhood
Median household income (2020)$86,000$84,500
Households that own their home62%54%
Population (2021)9,85016,813
Homes built in 1960 or before39%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThistletown-Beaumond HeightsCity median
Assault623.7636.3
Robbery155.969.5
Shootings18.310.5
Auto theft321192.6
Theft over $5,00045.946.1
Break and enter100.9172.8
Theft from vehicles146.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.