HousePrecheckCheck an address

921 Progress AveToronto · zoning, lot size and permit records

Also 931 Progress Ave

Employment · E 0.7≈ 137.7 × 275.0 m24,854 m²on Progress Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: B0022/26SC (2026); 25 233775 ESC 24 SA (Site Plan Control Application proposes the development of a 1-storey restaurant in an e..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
≈ 137.7 m frontage≈ 275.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (22% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (17% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Highland Forest/Morningside Park Forest and Highland Creek West

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • Natural Heritage System (28% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: B0022/26SC (2026); 25 233775 ESC 24 SA (Site Plan Control Application proposes the development of a 1-storey restaurant in an e..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

17 records on file: more than at 100% of Toronto houses (median 0).

  • Consent (lot split)B0022/26SCPending
    Oct 14, 2026 · 921-931 PROGRESS AVE
  • Development application25 233775 ESC 24 SAUnder Review

    Site Plan Control Application proposes the development of a 1-storey restaurant in an existing vacant part of lot with two existing one-storey buildings.

    Oct 1, 2025 · 921-931 PROGRESS AVE · City file
  • Zoning review24 109427 ZAPNotice Sent
    Jan 29, 2024 · 921-931 PROGRESS AVE
  • Zoning review22 165099 ZAPClosed
    Jun 20, 2022 · 921-931 PROGRESS AVE
  • Zoning review20 196656 ZZUCancelled
    Sep 21, 2020 · 921 PROGRESS AVE
  • Building permit15 255426Cancelled

    Interior partitioning for office

    Nov 23, 2015 · 921-931 PROGRESS AVE
  • Zoning review15 181323 ZZUClosed
    Jun 26, 2015 · 921-931 PROGRESS AVE
  • Building permit14 186127Closed

    Installation of a 2" DCVA back flow preventer c/w expansion tank

    Jul 28, 2014 · 921-931 PROGRESS AVE
Show 9 older records
  • Building permit14 186121Closed

    Installation of a 2" DCVA back flow preventer and expansion tank

    Jul 28, 2014 · 921-931 PROGRESS AVE
  • Building permit13 214806Closed

    Interior alterations in existing one storey Industrial building to create a new storage room and washroom corridor, with two new sprinkler heads, new exit signs and emergency lighting and mechanical application.

    Aug 13, 2013 · 921-931 PROGRESS AVE
  • Zoning review11 190453 ZPUClosed
    May 9, 2011 · 921-931 PROGRESS AVE
  • Building permit06 191833Closed

    INTERIOR ALTERATION

    Dec 5, 2006 · 921-931 PROGRESS AVE
  • Zoning review04 142120 ZPUClosed
    Jun 1, 2004 · 921-931 PROGRESS AVE
  • Building permit03 112079Closed

    INSTALLATION OF SPRAY BOOTH - UNIT 7

    May 5, 2003 · 921-931 PROGRESS AVE
  • Building permit02 197427Closed

    INTERIOR ALTERATIONS TO OFFICE SPACE

    Dec 23, 2002 · 921-931 PROGRESS AVE
  • Building permit01 169922Closed

    INSTALLATION OF A FIRE PREVENTION SYSTEM USING INERGEN INERT GAS.

    Aug 22, 2001 · 921-931 PROGRESS AVE
  • Building permit99 117995Closed

    OFFICE RENOVATION

    Jan 27, 2000 · 921-931 PROGRESS AVE

Lot facts

Area
24,854 m²
Frontage
137.7 mestimated, irregular lot
Depth
275 mestimated, irregular lot
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
4,918 m²roof up to 9.7 m
Back yard
17.8 mhouse to rear lot line
Side yards
16.5 m and 24.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for existing P1 underground parking garage structural restoration.

    40 TUXEDO CRT · Nov 2, 2026 · 236 m away
  • Consent (lot split)Pending

    Accepted

    921-931 PROGRESS AVE · Oct 14, 2026 · 28 m away
  • Zoning review

    Closed

    930 PROGRESS AVE · Jul 22, 2026 · 244 m away
  • Development application

    Redevelopment of the lands consisting of, a 17-storey mixed use building containing apartment dwelling units intended for seniors, and a dedicated daycare/pre-school facility. The development will be phased. A 2-storey community centre/banquet hall, and, two new 39-storey residential buildings.The existing Place of Worship located at 920 Progress Avenue will be retained in situ, with a reconfigured access and pick-up/drop-off area.

    930 PROGRESS AVE · May 11, 2026 · 261 m away · City file
  • Development application

    Site Plan Control Application proposes the development of a 1-storey restaurant in an existing vacant part of lot with two existing one-storey buildings.

    921-931 PROGRESS AVE · Oct 1, 2025 · 107 m away · City file
  • Consent (lot split)Pending

    To obtain consent to sever the property into two lots and to establish private easements at and below grade. Cross-reference Site Plan Control Application 21 149517 ESC 24 SA and Zoning By-law Amendment Application 21 149511 ESC 24 OZ.

    40 TUXEDO CRT · Jun 21, 2024 · 236 m away
  • Zoning review

    Notice Sent

    921-931 PROGRESS AVE · Jan 29, 2024 · 28 m away
  • Zoning review

    Application On Hold

    40 TUXEDO CRT · Jan 26, 2024 · 236 m away
  • Building permit

    Revision 01. HVAC - Kitchen Fire SuppressionPROPOSED: Remove existing no load bearing wall, new sinks, HVAC renovation

    930 PROGRESS AVE · Aug 1, 2023 · 244 m away
  • Zoning review

    Closed

    30 TUXEDO CRT · Jan 12, 2023 · 240 m away

Neighbourhood: Woburn North

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station32 min walk
Nearest TTC stop
Progress Ave at Roadway to Centennial College2 min walk
Nearest cycling route
Ellesmere RdMulti-Use Trail - Boulevard, 11 min walk
Nearest traffic count
6,199 vehicles in 8 hProgress Ave: Markham Rd - Progress Ave N / Hwy 401 Collectors E Ramp, 120 m away, Feb 23, 2022
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Morningside Park1 min walk
Woburn Park - Scarborough3 min walk
Trca Lands ( 77)7 min walk

Schools within 1 km

  • CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 6 min walk
  • WOBURN JR PUBLIC SCHOOL English Public 8 min walk
  • WOBURN COLLEGIATE INSTITUTE English Public 10 min walk
  • ST THOMAS MORE CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • Z3 EDUCATION CENTRE SCHOOL Private 12 min walk
  • TALENTA ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWoburn NorthMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home54%54%
Population (2021)26,58016,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWoburn NorthCity median
Assault768.9636.3
Robbery76.569.5
Shootings13.910.5
Auto theft316.6192.6
Theft over $5,00062.646.1
Break and enter180.9172.8
Theft from vehicles281.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.