HousePrecheckCheck an address

92 Eastdale AveToronto · zoning, lot size and permit records

Also 100 Eastdale Ave, 102 Eastdale Ave, 104 Eastdale Ave, 106 Eastdale Ave, 108 Eastdale Ave and 3 more

≈ 199.6 × 86.6 m7,161 m²on Eastdale Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 7 storeys, 80 rental units, built 2024More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 24 178208 STE 19 SA (Site Plan Approval for a 41-storey (129.6 metres in height excluding the 6 storey mechn..., 2024); 24 123646 STE 19 OZ (Zoning By-law Amendment for a 40-storey (126 metres plus 6 metre MPH) high-rise residen..., 2024); 20 219688 STE 19 PL (Part Lot Control Exemption for 4 lots, 2020). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 41 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 199.6 m frontage≈ 86.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 10 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards, Rooming House, Zoning): 26 212924 PRS 00 IR (Property Standards, 2026); 26 194661 PRS 00 IR (Property Standards, 2026); 26 171466 000 00 IR (Adequate Heat, 2026); and 7 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 178208 STE 19 SA (Site Plan Approval for a 41-storey (129.6 metres in height excluding the 6 storey mechn..., 2024); 24 123646 STE 19 OZ (Zoning By-law Amendment for a 40-storey (126 metres plus 6 metre MPH) high-rise residen..., 2024); 20 219688 STE 19 PL (Part Lot Control Exemption for 4 lots, 2020).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 41 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (7 storeys, 80 units, built 2024).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

17 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 212924 PRS 00 IRClosed

    Property Standards

    Aug 2, 2026 · 100 EASTDALE AVE
  • By-law investigation26 194661 PRS 00 IRClosed

    Property Standards

    Jul 2, 2026 · 100 EASTDALE AVE
  • By-law investigation26 171466 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 100 EASTDALE AVE
  • By-law investigation26 171465 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 100 EASTDALE AVE
  • By-law investigation26 129760 PRS 00 IRClosed

    Property Standards

    Mar 15, 2026 · 100 EASTDALE AVE
  • By-law investigation26 101256 RMH 00 IRClosed

    Rooming House

    Jan 6, 2026 · 100 EASTDALE AVE
  • By-law investigation25 270981 PRS 00 IRClosed

    Property Standards

    Dec 31, 2025 · 100 EASTDALE AVE
  • By-law investigation25 270942 HEA 00 IRClosed

    Adequate Heat

    Dec 31, 2025 · 100 EASTDALE AVE
Show 9 older records
  • By-law investigation25 263515 PRS 00 IRClosed

    Property Standards

    Dec 7, 2025 · 100 EASTDALE AVE
  • By-law investigation25 255294 ZON 00 IRClosed

    Zoning

    Nov 18, 2025 · 100 EASTDALE AVE
  • Development application24 178208 STE 19 SAUnder Review

    Site Plan Approval for a 41-storey (129.6 metres in height excluding the 6 storey mechnical penthouse) residential development with a six-storey podium including 547 dwelling units of which 35 are rental replacement and 11 are affordable rental units. The proposal includes a total of 39,900 square metres of residential gross floor area.Two storeys of underground parking are proposed consisting of 304 vehicular parking spaces, 601 bicycle parking spaces and two loading spaces.

    Jul 10, 2024 · 90 EASTDALE AVE · City file
  • Development application24 123646 STE 19 OZCouncil Approved

    Zoning By-law Amendment for a 40-storey (126 metres plus 6 metre MPH) high-rise residential development, with a 6-storey podium. The proposal will contain 535 dwelling unit and comprise of 38,806 m2 residential gross floor area, two levels of underground vehicular parking levels of 304 parking spaces, and 589 bicycle parking spaces.

    Mar 8, 2024 · 90 EASTDALE AVE · City file
  • Development application20 219688 STE 19 PLApproved

    Part Lot Control Exemption for 4 lots.

    Nov 18, 2020 · 90 EASTDALE AVE · City file
  • Development application15 209998 STE 31 SAClosed

    Proposal for siteplan for the construction of a 37 storey apartment with 396 units, adjacent to the exisiting 24 storey apartment building on the site.

    Aug 20, 2015 · 90 EASTDALE AVE · City file
  • Development application15 209995 STE 31 OZClosed

    Proposal for rezoning for the construction of a 37 storey apartment building with 396 rental apartment units adjacent to the existing building on the property.

    Aug 20, 2015 · 90 EASTDALE AVE · City file
  • Development application10 119850 STE 31 OZClosed

    Rezoning application to include the replacement of 22 existing units on the site with new stacked townhouses, to add one new residential condominium building, being 24 storey building with 251 units and to construct an indoor pool facility. The proposal also includes a 'swap' of land for parks purposes, with the new building being placed in the exisitng City park and a new park being constructed where some of the existing townhouses are located.

    Feb 18, 2010 · 90 EASTDALE AVE
  • Development application08 231740 STE 31 OZClosed

    OPA application to permit the demolition of 9 rental townhouse blocks containing 52 -3 bedroom dwelling units so as to permit the construction of 2 above grade residential towers in an 8 storey and 30 storey building complete with 60 rental townhouse dwelling units in four blocks. Exisitng units to be retained 687, 365 proposed. Existing and proposed building to be connected below grade with two levels of parking.

    Dec 23, 2008 · 90 EASTDALE AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,161 m²
Frontage
199.6 mestimated, irregular lot
Depth
86.6 mestimated, irregular lot
Street
Eastdale Ave
Corner lot
No
Public lane
None
House footprint
1,654 m²
Back yard
13.5 mhouse to rear lot line
Side yards
62.9 m and 63.2 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    89%17 of 19 decisions
    Garden suite permits
    8
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    3

    Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new three-storey detached building (houseplex) with a rear (south) basement walkout, front (north) and rear (south) ground floor porches with stairs, as well as front and rear second and third storey balconies. A front yard parking pad abutting Midburn Avenue will be constructed. Also, to construct a new rear two-storey semi-detached ancillary building containing a garden suite. There will be a total of six residential dwelling units on this lot (five units in the main building and one unit within the ancillary building containing a garden suite).

      15 MIDBURN AVE · Oct 21, 2026 · 464 m away
    • Minor varianceApproved

      To construct a new three-storey detached building (houseplex) with a rear (south) basement walkout, front (north) and rear (south) ground floor porches with stairs, as well as front and rear second and third storey balconies. A front yard parking pad abutting Midburn Avenue will be constructed. Also, to construct a new rear two-storey semi-detached ancillary building containing a garden suite. There will be a total of six residential dwelling units on this lot (five units in the main building and one unit within the ancillary building containing a garden suite).

      15 MIDBURN AVE · Oct 21, 2026 · 464 m away
    • Minor varianceApproved

      To construct a new one-storey detached ancillary building (workshop and storage) in the rear yard of the property containing the existing one-storey detached dwelling. The existing metal shed and semi-detached garage in the rear yard will be demolished.

      343 LUMSDEN AVE · Oct 7, 2026 · 437 m away
    • Minor varianceApproved

      To construct a new two-storey detached dwelling with a covered front porch with stairs, a front integral garage, and a front driveway abutting Westbrook Avenue.

      54 WESTBROOK AVE · Sep 9, 2026 · 369 m away
    • Minor varianceApproved

      To construct a new rear one-storey ancillary building (one-car detached garage) abutting the laneway.

      393 MAIN ST · Sep 2, 2026 · 366 m away

    Latest activity nearby

    • Building permit

      Proposal for a rear 1 storey addition and rear deck

      495 MAIN ST · Nov 25, 2026 · 269 m away
    • Building permit

      Proposed fire damage repairs.

      35 NEWMAN AVE · Sep 22, 2026 · 193 m away
    • Building permit

      UNDERPINING IN THE BASEMENT

      494 MAIN ST · Sep 15, 2026 · 255 m away
    • Building permit

      Proposal for multiple projects such as interior alterations, demolition and reconstruction of new mud room, and basement underpinning.

      449 MAIN ST · Sep 1, 2026 · 211 m away
    • Building permit

      REV 01: Proposed 2nd floor rear addition has been altered in size, the proposed 1st floor rear addition has been omitted, the existing 1st floor rear addition has been slightly increased in size, the existing basement exterior walls remain, interior alterations throughout and the existing gazebo in the rear yard has been removed.Proposal to construct a rear two storey addition to existing two-storey detached dwelling.

      501 MAIN ST · Aug 25, 2026 · 284 m away
    • Building permit

      PROPOSED REBUILDING OF THE EXISTING FRONT PORCH, PORCH ROOF AND STAIRS

      3 NEWMAN AVE · Aug 5, 2026 · 256 m away
    • Building permit

      Back water valve installation outside

      392 LUMSDEN AVE · Aug 4, 2026 · 195 m away
    • Zoning review

      Notice Sent

      73 PALMER AVE · Jul 6, 2026 · 183 m away
    • Building permitsecondary suite

      Proposal for a 2nd unit (Secondary Suite) in the basement of this existing detached SFD. Scope of work includes one window enlargement.

      390 LUMSDEN AVE · May 28, 2026 · 201 m away
    • Building permitsecondary suite

      Proposal to construct interior alterations to convert an existing detached SFD into a SFD with a secondary suite.

      38 GOODWOOD PARK CRES · May 19, 2026 · 243 m away

    Neighbourhood: Taylor-Massey

    About the area around the lot, not the lot itself.

    Nearest station
    Main Street Station9 min walk
    Nearest TTC stop
    Eastdale Ave at Goodwood Park Cres1 min walk
    Nearest cycling route
    Eastdale AveSharrows, 1 min walk
    Nearest traffic count
    3,526 vehicles in 8 hLumsden Ave / Barrington Ave / Taylor Creek Trl, 170 m away, Aug 19, 1999
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Secord Park2 min walk
    Taylor Creek Park3 min walk
    Maryland Park8 min walk

    Schools within 1 km

    • SECORD ELEMENTARY SCHOOL English Public 4 min walk
    • COMMUNITY LIFE CHRISTIAN SCHOOL Private 5 min walk
    • WILLIAM J MCCORDIC SCHOOL English Public 8 min walk
    • DANFORTH LINC English Public 12 min walk
    • GEORGE WEBSTER ELEMENTARY SCHOOL English Public 12 min walk
    • CRESCENT TOWN ELEMENTARY SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureTaylor-MasseyMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home34%54%
    Population (2021)15,02516,813
    Homes built in 1960 or before25%29%
    Homes needing major repairs10%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleTaylor-MasseyCity median
    Assault788.7636.3
    Robbery78.369.5
    Auto theft192.7192.6
    Theft over $5,00024.146.1
    Break and enter144.5172.8
    Theft from vehicles210.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.