HousePrecheckCheck an address

92 Carlton StToronto · zoning, lot size and permit records

Also 246 Mutual St, 248 Mutual St, 250 Mutual St, 252 Mutual St, 254 Mutual St and 2 more

Commercial residential · CR 4.0 (c1.0; r4.0) SS130.3 × 51.2 m1,539 m²on Carlton Stcorner, also on Mutual Stbacks onto School Lane

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 12 storeys, 110 rental units, built 2010More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 20 157700 (Proposal for interior alterations to convert storage room into waste collection and bul..., 2020, status Inspection); 07 128472 (HVAC - Construction of a new residential building 110 units, 12 Storeys. TCHC building, 2008, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
30.3 m frontage51.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2008

    Needs a closer look

    Still open in the City's records: 20 157700 (Proposal for interior alterations to convert storage room into waste collection and bul..., 2020, status Inspection); 07 128472 (HVAC - Construction of a new residential building 110 units, 12 Storeys. TCHC building, 2008, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 8 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 187118 PRS 00 IR (Property Standards, 2026); 26 152281 PRS 00 IR (Property Standards, 2026); 26 139804 PRS 00 IR (Property Standards, 2026); and 5 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 Committee of Adjustment files on this lot

    Good to know

    3 approved. A0305/08TEY (To construct a 12 storey, 110 unit, residential building, 2008); A0915/07TEY (To permit the undersized parking spaces for the previously approved eleven-storey resid..., 2008); A0804/06TEY (The site is located at the northwest corner of Carlton Street and Mutual Street. The ap..., 2006).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (12 storeys, 110 units, built 2010).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 187118 PRS 00 IRClosed

    Property Standards

    Jun 18, 2026 · 92 CARLTON ST
  • By-law investigation26 152281 PRS 00 IRClosed

    Property Standards

    Apr 29, 2026 · 92 CARLTON ST
  • By-law investigation26 139804 PRS 00 IRClosed

    Property Standards

    Apr 7, 2026 · 92 CARLTON ST
  • By-law investigation26 135943 PRS 00 IRClosed

    Property Standards

    Mar 28, 2026 · 92 CARLTON ST
  • By-law investigation26 134967 PRS 00 IRClosed

    Property Standards

    Mar 26, 2026 · 92 CARLTON ST
  • By-law investigation26 129137 PRS 00 IRClosed

    Property Standards

    Mar 13, 2026 · 92 CARLTON ST
  • By-law investigation26 116379 PRS 00 IRClosed

    Property Standards

    Feb 11, 2026 · 92 CARLTON ST
  • By-law investigation26 101107 PRS 00 IRClosed

    Property Standards

    Jan 5, 2026 · 92 CARLTON ST
Show 11 older records
  • Building permit20 157700Inspection

    Proposal for interior alterations to convert storage room into waste collection and bulk item room for existing apartment building.

    Jul 15, 2020 · 92 CARLTON ST
  • Building permit09 120489Closed

    Sprinkler permit for 07 128472 Bld. - see folder for initial fees

    May 4, 2009 · 88 CARLTON ST
  • Building permit07 128472Inspection

    HVAC - Construction of a new residential building 110 units, 12 Storeys. TCHC building.

    Oct 30, 2008 · 88 CARLTON ST
  • Minor varianceA0305/08TEYApproved

    To construct a 12 storey, 110 unit, residential building.

    Apr 2, 2008 · 88 CARLTON ST
  • Minor varianceA0915/07TEYApproved

    To permit the undersized parking spaces for the previously approved eleven-storey residential apartment building with two levels of below-grade parking. Further, to reduce the number of on-site parking spaces provided.

    Jan 9, 2008 · 88 CARLTON ST
  • Zoning review07 241654 ZPRClosed
    Jul 10, 2007 · 88 CARLTON ST
  • Building permit06 196027Closed

    Proposal to construct structure to support the south facades of the existing buildings. The facades will be incorporated into a new 11 storey structure. Single Owner #88 and #90 Carlton St. (Non Profit Housing. See enclosed letter) See Demo # 06 179547. Jim Laughlin familiar.

    Dec 12, 2006 · 88 CARLTON ST
  • Building permit06 179547Closeddemolition

    Single Owner #88 and #90 Carlton St. Proposed demolition of 3 storey apartment building on #88 and 3 storey apartment building on #90. (Non Profit Housing. See enclosed letter) Jim Laughlin familiar. Applicatn to submit Struct. Gen Review ( Hold lifted for expediency- Nov 20,2006)

    Nov 24, 2006 · 88 CARLTON ST
  • Minor varianceA0804/06TEYApproved

    The site is located at the northwest corner of Carlton Street and Mutual Street. The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to demolish the two existing apartment buildings and construct a new eleven storey residential apartment building containing 108 units. Twenty-seven out of the thirty-eight proposed parking spaces will be provided in a below-grade garage while the remaining spaces will be provided on ground level within the building.

    Nov 22, 2006 · 88 CARLTON ST
  • Zoning review06 181512 PSPClosed
    Oct 4, 2006 · 88 CARLTON ST
  • Zoning review06 173815 ZPRClosed
    Sep 7, 2006 · 88 CARLTON ST

Lot facts

Area
1,539 m²
Frontage
30.3 m
Depth
51.2 m
Street
Carlton St
Corner lot
Yes, also on Mutual St51.2 m along it
Public lane
School Lane, 33.4 m along it
House footprint
1,276 m²roof up to 39.5 m
Back yard
2.2 mhouse to rear lot line
Side yards
0 m and 0.2 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Carlton Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c1.0; r4.0) SS1 (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
94%17 of 18 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
17

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 269 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 434 m away
  • Minor varianceApproved

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    134 CARLTON ST · Jul 9, 2025 · 242 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 422 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 483 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    50 GERRARD ST E · Nov 25, 2026 · 287 m away
  • Building permit

    1 Wall Sign***** T-DOT DENTAL*****

    306 JARVIS ST · Nov 17, 2026 · 153 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 274 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 274 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 228 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 228 m away
  • Zoning review

    Closed

    140 CARLTON ST · Oct 27, 2026 · 269 m away
  • Zoning review

    Closed

    27 CARLTON ST · Oct 26, 2026 · 270 m away
  • Building permit

    Layout changes + addition of a bathroom in units1A, 12, 24 & 25.

    134 CARLTON ST · Oct 23, 2026 · 242 m away
  • Zoning review

    Closed

    30 CARLTON ST · Oct 20, 2026 · 233 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
College Station7 min walk
Nearest TTC stop
Carlton St at Church St1 min walk
Nearest cycling route
Gerrard St ECycle Track, 4 min walk
Nearest traffic count
15,841 vehicles in 14 hCarlton St / Church St, 100 m away, Sep 26, 2026
Serious collisions within 500 m
152021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 4 with cyclists
Parks
Allan Gardens3 min walk
Montague Parkette4 min walk
Joseph Sheard Parkette6 min walk

Schools within 1 km

  • LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 1 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 1 min walk
  • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 2 min walk
  • NATIONAL BALLET SCHOOL Private 2 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 2 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 3 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.