HousePrecheckCheck an address

91A The QueenswayToronto · zoning, lot size and permit records

Also 91 The Queensway

UT≈ 52.1 × 81.3 m2,756 m²on Ellis Avecorner, also on The Queensway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 16 236939 (Proposal to conduct upgrades and rehabilitation of the Ellis SPS. This includes a new W..., 2016, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 93% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 229300 PRS 00 IR (Property Standards, 2026, status Rescheduled).

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 52.1 m frontage≈ 81.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 229300 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 236939 (Proposal to conduct upgrades and rehabilitation of the Ellis SPS. This includes a new W..., 2016, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (74% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation26 229300 PRS 00 IRRescheduled

    Property Standards

    Aug 31, 2026 · 91 THE QUEENSWAY
  • Building permit16 246749Closeddemolition

    Demo temporary sales office

    Nov 22, 2016 · 91 THE QUEENSWAY
  • Building permit16 236939Permit Issued

    Proposal to conduct upgrades and rehabilitation of the Ellis SPS. This includes a new Wet Well Vestibule and Exterior Access Door, New Wet Well Platforms, New Floor Slab Openings and Hatches, New Monorail and Hoist, Replace Existing Ladders, Modifications to Existing Stairs, Roofing Replacement and Repairs, New Equipment Pads and Bases, Painting and Coating of Interior Walls and Floors.

    Nov 17, 2016 · 91 THE QUEENSWAY

Lot facts

Area
2,756 m²
Frontage
52.1 mestimated, irregular lot
Depth
81.3 mestimated, irregular lot
Street
Ellis Ave
Corner lot
Yes, also on The Queensway81.3 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Swansea Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone UT (Utility and Transportation). Chapter 100, section 100.10 of the by-law. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
8

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitdemolition, multiplex

    PROPOSED- 3 STOREYS & BASEMENT- 6 DWELLING UNITS

    3 COE HILL DR · Nov 2, 2026 · 130 m away
  • Building permitmultiplex, new building, new house

    PROPOSED NEW BUILDING - 3 STOREYS & BASEMENT- 6 DWELLING UNITS

    3 COE HILL DR · Nov 2, 2026 · 130 m away
  • Minor varianceApproved

    To construct a new three-storey detached building (multiplex) with front and rear ground floor platforms and stairs, and a new widened driveway in the front yard. There will be a total of six residential dwelling units on this lot.

    3 COE HILL DR · Jul 8, 2026 · 130 m away
  • Development application

    Site Plan Application regarding a 35-storey residential building with retail and community uses at-grade and a 20-storey residential building. The development includes 639 residential units, including rental replacement housing provided as rent-geared-to-income units, publicly-accessible space along the Queensway, and a shared servicing and pick-up and drop-off area accessed off Windermere Avenue which provides access to separate loading spaces for each building.

    21 WINDERMERE AVE · May 21, 2026 · 289 m away · City file
  • Building permitmultiplex, new building, new house, secondary suite

    To construct a new three-storey detached dwelling (duplex) with a partially covered front porch with stairs, a front basement walkout with a patio, a front third floor balcony (above the second floor), and a rear ground floor deck with stairs.

    17 ELLIS GDNS · Mar 5, 2026 · 161 m away
  • Building permit

    REV: Replace existing wood porch with concrete porch existing two-storey detached dwelling by constructing a complete third storey addition and a partial fourth storey addition with front fourth storey rooftop balcony, third storey balcony

    38 ELLIS AVE · Feb 10, 2026 · 119 m away
  • Building permit

    Proposal for backwater valve install

    19 ELLIS GDNS · Jan 5, 2026 · 166 m away
  • Building permit

    Proposal for canopy over playground

    103 THE QUEENSWAY · Nov 24, 2025 · 292 m away
  • Development application

    Proposed mixed-use development containing two new buildings, including a 35-storey building in the southern portion of the site fronting on The Queensway (Building 1) and an inverted U-shaped building in the northern portion of the site which includes a 5- and 8-storey midrise elements, and a 20-storey tower element (Building 2). The proposed development includes a total gross floor area of 71,268 square metres. This includes 654 square metres of commercial GFA and 550 square metres of flexible community use space in Building 1, as well as 70,063 square metres of residential GFA spread between both buildings. A total of 649 residential units are proposed, including 154 rental replacement units, all owned and operated by TCHC, providing net new affordable and market housing.

    21 WINDERMERE AVE · Nov 7, 2025 · 289 m away · City file
  • Building permitdemolition

    DEMOLITION OF THE EXISTING BUNGALOW. CONSTRUCTION OF A NEW TWO-UNIT THREE- STOREY BUILDING ON THE FOOTPRINTS OF THE EXISTING BUILDING

    17 ELLIS GDNS · Oct 30, 2025 · 161 m away

Neighbourhood: High Park-Swansea

About the area around the lot, not the lot itself.

Nearest station
Runnymede Station29 min walk
Nearest TTC stop
The Queensway at Ellis Ave1 min walk
Nearest cycling route
The QueenswayBike Lane, 1 min walk
Nearest traffic count
16,297 vehicles in 8 hThe Queensway / Ellis Ave / High Park Trl, 70 m away, Oct 4, 2016
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Sunnyside Bike Park2 min walk
Sir Casimir Gzowski Park3 min walk
Rennie Park3 min walk

2021 Census

FigureHigh Park-SwanseaMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home60%54%
Population (2021)22,66516,813
Homes built in 1960 or before54%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHigh Park-SwanseaCity median
Assault465.8636.3
Robbery46.669.5
Shootings7.810.5
Auto theft89.3192.6
Theft over $5,00023.346.1
Break and enter229172.8
Theft from vehicles128.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.