Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 91 King St E
91 King St E is on a 15.6 m by 29.5 m lot on King St E in Downtown Yonge East. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 12 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Rev 01: third floor revision to proposed scope of work ( deletion of 1 sleeping quarters and washroom. minor adjacent revisions. [interior renovation to…". Status: closed. In 2020, a building permit was filed: "Hvac - proposal for interior alterations to provide new stair connection at albany club basement to 65 king st e parking mezzanine level". Status: closed. In 2012, a building permit was filed: "Proposal for interior alterations to fourth floor and construction of new roof top deck. tenant is the albany club of toronto". Status: closed. Nothing on file is open right now.
Within 300 m, 16 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 11 minor variance applications in the last 10 years and approved 91%. King station is a 4-minute walk.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Zoning not in By-law 569-2013Moderate
- 16 development applications open within 300 mLowFree check
- 2 City trees in front of this lotLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
12 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2022-04-26 | Building permit22 101109 | Rev 01: third floor revision to proposed scope of work ( deletion of 1 sleeping quarters and washroom. Minor adjacent revisions. [Interior renovation to existing private club including recognizing the previously completed third floor renovation. ] | Closed | |
| 2020-02-19 | Building permit19 210667 | HVAC - Proposal for interior alterations to provide new stair connection at Albany Club basement to 65 King St E parking mezzanine level. | Closed | |
| 2018-10-24 | Consent (lot split)B0065/18TEY | To obtain consent to re-establish an easement/right-of-way. | Approved | |
| 2012-05-01 | Building permit12 132924 | Proposal for interior alterations to fourth floor and construction of new roof top deck. Tenant is the Albany Club of Toronto. | Closed | |
| 2012-04-11 | Zoning review12 152085 PRZ | No description on file | Closed | |
| 2012-03-29 | Development application12 145905 STE 28 OZ | Application update and partial resubmission on September 26, 2016: Rezoning application for 79-91 King St E to permit a 25-storey (77m in height excluding mechanical penthouse) mixed-use building with a 4-storey podium and 3 levels of underground parking. The podium component occupies the entire footprint of the site. Tower floorplate is 625 sq. metres. The proposal includes 169 dwelling units on floors 5-25, a private club (Albany Club) spanning floors 1-4, and ground floor retail. | Closed | |
| 2012-03-21 | Minor varianceA0110/12TEY | To construct a roof top patio to the existing four-storey building. | Approved | |
| 2012-01-17 | Zoning review12 107117 ZPR | No description on file | Closed | |
| 2012-01-17 | Zoning review12 107102 ZPR | No description on file | Closed | |
| 2005-06-21 | Building permit05 144947 | Install new fire alarm system within existing building. Existing & Proposed: Private Club | Closed | |
| 2004-11-30 | Zoning review04 196479 LTO | No description on file | Closed | |
| 2000-10-19 | Building permit00 334060 | construct elevator between basement and 1st floor. construct cold storage room in basement. (applicant to supply basement and 1st floor plan) | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 426 m²
- Back yard
- 0.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 16 development applications open within 300 m, up to 80 storeys
- 11 minor variance decisions within 300 m, 91% approved
What this part means for this house, in plain EnglishUnlock
16 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Assault: 3.7 times the Toronto median
- Theft over $5,000: 2.2 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
- Robbery: 2.1 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Downtown Yonge East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- King StationNearest station4 min walk
- King St East at Church St West SideNearest TTC stop1 min walk
- Adelaide St ENearest cycling route3 min walk
- Keystone International SchoolsSchool2 min walk
- Victoria Street LincSchool5 min walk
- Downtown Alternative SchoolSchool7 min walk
- George Brown College - St James CampusSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32360.8
- Robberycity median 69.5143.3
- Shootingscity median 10.511.9
- Auto theftcity median 192.675.6
- Theft over $5,000city median 46.199.5
- Break and entercity median 172.8274.7
- Theft from vehiclescity median 188.1390.1
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist