HousePrecheckCheck an address

905 Progress AveToronto · zoning, lot size and permit records

37.9 × 81.2 m3,053 m²on Estate Drcorner, also on Progress Ave

Not a home

East Highland Creek - Prop B

The City of Toronto's real estate inventory lists East Highland Creek - Prop B here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 6 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N20 m
37.9 m frontage81.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (97% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,053 m²
Frontage
37.9 m
Depth
81.2 m
Street
Estate Dr
Corner lot
Yes, also on Progress Ave81.2 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%2 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    6

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To alter the existing building to construct a mezzanine level at 2036 Ellesmere Road (Building D) and alter the use from industrial to recreational uses. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on October 8, 2025.

      2050 ELLESMERE RD · Dec 3, 2025 · 437 m away
    • Minor varianceRefused

      To construct a mixed-use development consisting of three residential towers having heights of 21, 27 and 30 storeys, containing 879 dwelling units in total.

      1221 MARKHAM RD · Dec 8, 2021 · 363 m away
    • Minor varianceApproved

      To permit interior alterations to a site plan approved (File No. 15 204840 ESC 38 SA), tall building, multi-residential project by increasing additional floor area and adding to the total maximum number of residential units.

      1250 MARKHAM RD · Oct 14, 2020 · 268 m away
    • Minor varianceApproved

      To permit the construction of a third storey addition to the northwest wing of the existing hotel to add 30 new suites (total 163 suites). Sixteen (16) new surface parking spaces will be added for a total of 157 spaces.

      50 ESTATE DR · Mar 5, 2020 · 244 m away
    • Minor varianceApproved

      Global Kingdom Ministries is proposing to build two additions and undertake interior renovations to the existing place of worship building. The proposed additions would be located on the north and south sides of the building and would increase the total floor area by 2,307 m2. The additions would be used for an expanded nursery, meeting rooms, an audio and video production studio, and a lounge area. There are 464 existing parking spaces on the place of worship site. The applicants are proposing to re-stripe the parking area to provide an additional 22 parking spaces (486 spaces in total). The zoning by-law requires 633 parking spaces, and the applicants are requesting a variance to permit a parking shortfall of 147 spaces.

      1250 MARKHAM RD · Oct 28, 2014 · 268 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alterations for office unit finish in commercial area Unit 109.

      885 PROGRESS AVE · Sep 14, 2026 · 116 m away
    • Zoning review

      Closed

      930 PROGRESS AVE · Jul 22, 2026 · 203 m away
    • Building permit

      1 Ground Sign*****12FIFTY*****

      1250 MARKHAM RD · Jun 26, 2026 · 268 m away
    • Building permit

      Stage SL 100 and tents will be erected for Toronto Fiesta Extravaganza on June 19th, 2026 and will be taken down on June 21st, 2026.

      1250 MARKHAM RD · Jun 17, 2026 · 268 m away
    • Building permit

      2 Ground Sign

      1280 MARKHAM RD · Jun 15, 2026 · 50 m away
    • Building permit

      Proposal for make-up air unit replacement

      50 TUXEDO CRT · Jun 3, 2026 · 224 m away
    • Zoning review

      Notice Sent

      1255 MARKHAM RD · May 19, 2026 · 179 m away
    • Development application

      Redevelopment of the lands consisting of, a 17-storey mixed use building containing apartment dwelling units intended for seniors, and a dedicated daycare/pre-school facility. The development will be phased. A 2-storey community centre/banquet hall, and, two new 39-storey residential buildings.The existing Place of Worship located at 920 Progress Avenue will be retained in situ, with a reconfigured access and pick-up/drop-off area.

      920 PROGRESS AVE · May 11, 2026 · 142 m away · City file
    • Building permit

      1 Ground Sign1 Wall Sign

      1250 MARKHAM RD · Apr 29, 2026 · 268 m away
    • Zoning review

      Closed

      1280 MARKHAM RD · Mar 1, 2026 · 50 m away

    Neighbourhood: Woburn North

    About the area around the lot, not the lot itself.

    Nearest station
    McCowan Rt Station26 min walk
    Nearest TTC stop
    Progress Ave at Markham Rd West Side1 min walk
    Nearest cycling route
    Ellesmere RdMulti-Use Trail - Boulevard, 10 min walk
    Nearest traffic count
    12,046 vehicles in 8 hProgress Ave / Estate Dr (East), 40 m away, Mar 21, 2016
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Trca Lands ( 77)1 min walk
    Morningside Park1 min walk
    Woburn Park - Scarborough7 min walk

    Schools within 1 km

    • Z3 EDUCATION CENTRE SCHOOL Private 8 min walk
    • TALENTA ACADEMY Private 9 min walk
    • WOBURN COLLEGIATE INSTITUTE English Public 10 min walk
    • WOBURN JR PUBLIC SCHOOL English Public 10 min walk
    • CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 12 min walk
    • ST THOMAS MORE CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWoburn NorthMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home54%54%
    Population (2021)26,58016,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWoburn NorthCity median
    Assault768.9636.3
    Robbery76.569.5
    Shootings13.910.5
    Auto theft316.6192.6
    Theft over $5,00062.646.1
    Break and enter180.9172.8
    Theft from vehicles281.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.