HousePrecheckCheck an address

90 Tycos DrToronto · zoning, lot size and permit records

Employment · EL 1.061.0 × 104.0 m6,319 m²on Tycos Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 17 121978 (Proposal fro interior on the ground floor of the existing office building, 2017, status Inspection); 16 269926 (Construct 156.36 lineal meters of perditions to create 5 new showroom units. Reviewed a..., 2017, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
61.0 m frontage104.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2017

    Needs a closer look

    Still open in the City's records: 17 121978 (Proposal fro interior on the ground floor of the existing office building, 2017, status Inspection); 16 269926 (Construct 156.36 lineal meters of perditions to create 5 new showroom units. Reviewed a..., 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit24 118242Closed

    Proposal for interior alterations for office at suite 2

    Apr 9, 2024 · 90 TYCOS DR
  • Zoning review23 145736 ZAPClosed
    May 15, 2023 · 90 TYCOS DR
  • Zoning review21 244167 ZPRClosed
    Dec 2, 2021 · 90 TYCOS DR
  • Building permit17 192422Closed

    Rev 01 - Revision to equipment and distribution layout.HVAC - Proposal for interior alterations to fit our for new tenant. Unit 1. Scope of work also includes new exterior door for patio.

    Nov 7, 2017 · 90 TYCOS DR
  • Building permit17 148102Closed

    HVAC - Interior alterations to offices in Suite 5 for tenant improvement

    May 19, 2017 · 90 TYCOS DR
  • Building permit17 121978Inspection

    Proposal fro interior on the ground floor of the existing office building.

    May 10, 2017 · 90 TYCOS DR
  • Building permit17 122498Closed

    HVAC - Construct interior alterations for a tenant fit out (366.97m2)

    Apr 13, 2017 · 90 TYCOS DR
  • Building permit16 269926Inspection

    Construct 156.36 lineal meters of perditions to create 5 new showroom units. Reviewed and approved for F2 occupancy. May 03, 2017. LL

    Apr 10, 2017 · 90 TYCOS DR
Show 2 older records
  • Building permit17 106964Closed

    To erect and display six static illuminated wall signs.**ATEB CONSULTING**

    Feb 8, 2017 · 90 TYCOS DR
  • Building permit15 269024Closed

    Proposal to install a 1/2" backflow prevention device

    Jan 19, 2016 · 90 TYCOS DR

Lot facts

Area
6,319 m²
Frontage
61 m
Depth
104 m
Street
Tycos Dr
Corner lot
No
Public lane
None
House footprint
2,458 m²roof up to 13.6 m
Back yard
33.4 mhouse to rear lot line
Side yards
3.1 m and 5.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EL 1.0 (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: kentucky coffeetree (8 cm), kentucky coffeetree (8 cm), maple, freeman autumn blaze (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%16 of 16 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
0

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    Proposal to permit a Recreational use.

    116 TYCOS DR · Nov 23, 2023 · 168 m away

Latest activity nearby

  • Minor variancePending

    To construct a three (3) storey fourplex with rear yard Garden Suite.

    537 GLEN PARK AVE · Nov 26, 2026 · 242 m away
  • Building permitsecondary suite

    Proposal to construct a second unit in basement with window enlargements.

    1136 GLENCAIRN AVE · Nov 25, 2026 · 162 m away
  • Building permitsecondary suite

    PROP. REAR ADDITION AND 2nd FLOOR ADDITION, REBUILT CONC.PORCH AND FRONT WALK-OUT& CONC.DECK , CONVERT TO 2 UNITS

    542 GLEN PARK AVE · Nov 25, 2026 · 289 m away
  • Building permit

    FS - Sprinkler Shop Drawing - Proposed interior alterations for new Tenant (unit 2)

    117 TYCOS DR · Nov 18, 2026 · 232 m away
  • Building permitsecondary suite

    Proposal to construct a second unit in basement with window enlargements

    1136 GLENCAIRN AVE · Nov 12, 2026 · 162 m away
  • Zoning review

    Not Started

    542 GLEN PARK AVE · Oct 28, 2026 · 289 m away
  • Building permit

    Proposed installation of one temporary tent, TENT CERT#25 137538Installation Date: September 15, 2026Removal Date: September 17, 2026

    125 TYCOS DR · Sep 11, 2026 · 297 m away
  • Building permit

    Installation of temporary tent - ONE- 20'x45' TENT CERT#25 135948 .Anchored with weights. Informal rest stop area for attendees of the Tycos Dr. Trade Day event, providing treat samples and water. Install is Sept 15th. Event is Sept 16th. Removal is Sept 17th, 2026

    125 TYCOS DR · Sep 8, 2026 · 297 m away
  • Zoning review

    Notice Sent

    537 GLEN PARK AVE · Sep 2, 2026 · 242 m away
  • Zoning review

    Notice Sent

    537 GLEN PARK AVE · Sep 2, 2026 · 242 m away

Neighbourhood: Yorkdale-Glen Park

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station20 min walk
Nearest TTC stop
Glencairn Ave at Haven Rd East Side2 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 12 min walk
Nearest traffic count
1,846 vehicles in 8 hWingold Ave / Lansdowne Ave, 360 m away, Dec 14, 2009
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Glen Long Park5 min walk
Hillmount Parkette8 min walk
Dufferin Hill Park9 min walk

Schools within 1 km

  • REGINA MUNDI CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • DANTE ALIGHIERI ACADEMY - CLOSED TIL 2026 English Separate 9 min walk
  • JOYCE PUBLIC SCHOOL English Public 11 min walk
  • FIELDSTONE DAY SCHOOL Private 13 min walk
  • FIELDSTONE KING'S COLLEGE SECONDARY SCHOOL Private 13 min walk
  • LEONARDO DA VINCI ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYorkdale-Glen ParkMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home54%54%
Population (2021)16,62516,813
Homes built in 1960 or before27%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYorkdale-Glen ParkCity median
Assault1212.6636.3
Robbery146.869.5
Homicide4.75.3
Shootings28.410.5
Auto theft492.6192.6
Theft over $5,000274.746.1
Break and enter341.1172.8
Theft from vehicles360188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.