HousePrecheckCheck an address

90 Galloway RdToronto · zoning, lot size and permit records

Also 100 Galloway Rd

Open space · OR159.0 × 182.8 m27,367 m²on Apsco Avecorner, also on Galloway Rd

Not a home

Scarborough Boys & Girls Club

The City of Toronto's real estate inventory lists Scarborough Boys & Girls Club here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
159.0 m frontage182.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (2% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (83% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (86% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A254/03SC (The applicant proposes to continue the operation of a day care centre known as the East..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit22 207087Closed

    Proposal for complete accessibility upgrades.

    Jan 27, 2023 · 100 GALLOWAY RD
  • Building permit19 221354Closed

    BLD,PLB,HVA - Proposal to renovate the existing daycare and program space, including a new kitchen.

    Oct 7, 2019 · 100 GALLOWAY RD
  • Zoning review19 113738 ZPRClosed
    Feb 9, 2019 · 100 GALLOWAY RD
  • Building permit15 159290Closed

    Proposal to replace one (1) existing roof mounted heat/cool unit (RTU1) with new unit of similar size and capacity on existing youth community centre (unit located near RTU2 and EF4).

    Jun 15, 2015 · 100 GALLOWAY RD
  • Building permit10 321554Closed

    To erect and display two illuminated wall signs at the westerly and northerly uppermost portion of an existing two storey building in conjunction with the existing community services facility located on the premises **Boys & Girls Club of East Scarborough**

    Jul 15, 2011 · 90 GALLOWAY RD
  • Zoning review11 222486 ZPUClosed
    Jun 20, 2011 · 90 GALLOWAY RD
  • Building permit10 151928Closed

    To reduce scope of work originally submitted - revisions indicated on submitted drawings 2nd floor stair #2 (site plan-Galloway curbs)

    Jun 14, 2011 · 90 GALLOWAY RD
  • Zoning review11 120481 ZSVClosed
    Feb 4, 2011 · 90 GALLOWAY RD
Show 3 older records
  • Zoning review09 175253 ZALCancelled
    Oct 2, 2009 · 90 GALLOWAY RD
  • Building permit08 205588Closed

    relocate office mobile trailer

    Dec 3, 2008 · 90 GALLOWAY RD
  • Minor varianceA254/03SCApproved

    The applicant proposes to continue the operation of a day care centre known as the Eastside Club School Age Daycare located within the City owned East Scarborough Boys and Girls Club building on the property.

    Nov 26, 2003 · 90 GALLOWAY RD

Lot facts

Area
27,367 m²
Frontage
159 m
Depth
182.8 m
Street
Apsco Ave
Corner lot
Yes, also on Galloway Rd182.8 m along it
Public lane
None
House footprint
1,852 m²roof up to 14.9 m
Back yard
9.1 mhouse to rear lot line
Side yards
13.9 m and 103.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 27 City trees in front of this lot. The City's street tree inventory lists 27 trees at this address: butternut (71 cm), maple, manitoba (67 cm), butternut (26 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed rear addition to existing house (unheated)

    22 APSCO AVE · Oct 20, 2026 · 102 m away
  • Building permit

    Proposal for a side entrance door and proposed stair modification.

    17 PAYZAC AVE · Sep 8, 2026 · 199 m away
  • Minor varianceApproved

    To legalize and maintain the rear yard one-storey sunroom.

    22 APSCO AVE · Jun 3, 2026 · 102 m away
  • Building permit

    Proposal to construct below grade entrance from garage and proposing 3windows in the basement.

    15 EMCARR DR · May 8, 2026 · 117 m away
  • Building permit

    Proposal to convert existing attached garage space to a living accomodation (bedroom, kitchen, bathroom)

    79 CULTRA SQ · Feb 24, 2025 · 151 m away
  • Building permitgarden suite

    Proposal to construct a new 1 storey garden suite in the rear yard of an existing SFD-detached dwelling,

    12 PAYZAC AVE · Jan 31, 2025 · 250 m away
  • Building permitsecondary suite

    Basement renovation for second suite with basement walkout

    20 APSCO AVE · Oct 28, 2024 · 113 m away
  • Building permitdemolition

    Proposed demolition of existing dwelling (NH application: 24 190177)

    5 WALDOCK ST · Sep 20, 2024 · 184 m away
  • Building permit

    Drain - Proposal to construct a two-storey SFD with a finished basement

    5 WALDOCK ST · Sep 17, 2024 · 184 m away
  • Building permitgarden suite

    Revision 01 - to construct two wood entrance decks to new garden suitePROPOSED: NEW SINGLE STOREY GARDEN SUITE IN EXISTING REAR YARD.

    105 GALLOWAY RD · Sep 5, 2024 · 191 m away

Neighbourhood: West Hill

About the area around the lot, not the lot itself.

Nearest station
Guildwood Station6 min walk
Nearest TTC stop
130 Westlake Rd - Guildwood Station6 min walk
Nearest cycling route
Galloway RdSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
2,481 vehicles in 8 hGalloway Rd / Waldock St, 160 m away, Sep 5, 2017
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Galloway Park1 min walk
Poplar Park3 min walk
Guildwood Village Park5 min walk

Schools within 1 km

  • MAPLEWOOD HIGH SCHOOL English Public 4 min walk
  • EASTVIEW JR PUBLIC SCHOOL English Public 5 min walk
  • POPLAR ROAD JR PUBLIC SCHOOL English Public 10 min walk
  • GUILDWOOD JR PUBLIC SCHOOL English Public 14 min walk
  • ST URSULA CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
  • GALLOWAY ROAD PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest HillMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home59%54%
Population (2021)28,14016,813
Homes built in 1960 or before21%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest HillCity median
Assault1328.2636.3
Robbery98.369.5
Homicide6.35.3
Shootings15.810.5
Auto theft149192.6
Theft over $5,00063.446.1
Break and enter193.4172.8
Theft from vehicles389.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.