HousePrecheckCheck an address

90 Adelaide St EToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c2.0; r4.0) SS1 (x2254)33.2 × 27.5 m875 m²on Adelaide St E

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 8 storeys, 60 rental units, built 1980More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 10 122879 (Proposal to install two backflow prevention devices in existing mixed-use building, 2010, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 17 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
33.2 m frontage27.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2010

    Needs a closer look

    Still open in the City's records: 10 122879 (Proposal to install two backflow prevention devices in existing mixed-use building, 2010, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A581/01TO (Located currently on the site is an eight storey apartment building with one level of u..., 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 17 development applications open within 300 m

    Good to know

    17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Apartment).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (8 storeys, 60 units, built 1980).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Zoning review19 118554 LTOClosed
    Feb 25, 2019 · 90 ADELAIDE ST E
  • Building permit10 122879Permit Issued

    Proposal to install two backflow prevention devices in existing mixed-use building.

    Feb 26, 2010 · 90 ADELAIDE ST E
  • Zoning review09 195172 LTOClosed
    Dec 9, 2009 · 90 ADELAIDE ST E
  • Building permit06 165871Closed

    Proposal to replace fire alarm in exising multi-use building.

    Aug 23, 2006 · 90 ADELAIDE ST E
  • Building permit01 158435Closed

    alter plan as approved by providing 5 undersized parking spaces see: c. of a. dec.

    Jan 15, 2002 · 90 ADELAIDE ST E
  • Minor varianceA581/01TOApproved

    Located currently on the site is an eight storey apartment building with one level of underground parking. The applicant is seeking to convert basement storage space to parking space (200 square metres). Two existing parking psaces will be retained and re-located. Six new parking spaces will be created, five of which will be undersized. The building when altered will contain 18 parking spaces.

    Nov 14, 2001 · 90 ADELAIDE ST E
  • Zoning review93 025087 LTOClosed
    May 13, 1993 · 90 ADELAIDE ST E
  • Zoning review90 028180 LTOClosed
    Feb 20, 1990 · 90 ADELAIDE ST E
Show 2 older records
  • Zoning review89 030447 LTOClosed
    Oct 20, 1989 · 90 ADELAIDE ST E
  • Zoning review87 030593 LTOClosed
    Dec 16, 1987 · 90 ADELAIDE ST E

Check before you build

  • Site-specific exception 900.11.10(2254)

    Needs a closer look

    4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2254)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 334 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 335 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 260 of former City of Toronto By-law 438-86

  4. Older by-law D

    On 90 Adelaide St. E., former City of Toronto by-laws 711-77 and 96-0140

4 parts for other addresses
  • E On 55 Lombard St., former City of Toronto by-laws 147-79 and 426-83
  • F On 77 Lombard St., former City of Toronto by-laws 711-77 and 96-0140
  • G On 69 Lombard St., former City of Toronto by-law 96-0140
  • H On 99 Queen St. E., former City of Toronto by-law 505-82.
By-law 569-2013, Chapter 900

Lot facts

Area
875 m²
Frontage
33.2 m
Depth
27.5 m
Street
Adelaide St E
Corner lot
No
Public lane
None
House footprint
653 m²
Back yard
5.3 mhouse to rear lot line
Side yards
0.8 m and 1.4 mhouse to side lot lines
Buildings on the lot
7house, garage, sheds
Max height
23 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c2.0; r4.0) SS1 (x2254) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm (24 cm), elm, accolade (16 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%20 of 21 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
46

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 467 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 301 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 435 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 438 m away
  • Minor varianceApproved

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    89 CHURCH ST · Jan 15, 2025 · 97 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

    60 QUEEN ST E · Dec 16, 2026 · 235 m away
  • Building permit

    Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.

    99 QUEEN ST E · Nov 20, 2026 · 187 m away
  • Building permit

    Revision No.1: New Fire Shutter Window

    30 ADELAIDE ST E · Nov 20, 2026 · 237 m away
  • Building permit

    nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements

    50 RICHMOND ST E · Nov 19, 2026 · 245 m away
  • Building permit

    Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.

    19 TORONTO ST · Nov 16, 2026 · 202 m away
  • Building permit

    Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.

    124 CHURCH ST · Nov 16, 2026 · 147 m away
  • Building permit

    Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.

    47 COLBORNE ST · Nov 9, 2026 · 298 m away
  • Zoning review

    Not Started

    100 LOMBARD ST · Nov 6, 2026 · 92 m away
  • Building permit

    UNIT 301 INTERIOR NON-STRUCTURAL PARTITION DEMOLITION

    47 COLBORNE ST · Nov 6, 2026 · 298 m away
  • Building permit

    Replacing and reconnecting building interior domestic cold water system, including a temporary domestic/fire feed.

    74 VICTORIA ST · Nov 4, 2026 · 295 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
Queen Station7 min walk
Nearest TTC stop
Church St at Richmond St East3 min walk
Nearest cycling route
Adelaide St ECycle Track, 1 min walk
Nearest traffic count
16,499 vehicles in 14 hAdelaide St E / Church St, 80 m away, Nov 4, 2025
Serious collisions within 500 m
142021–2026, killed or seriously injured: 2 fatal, 8 with pedestrians, 2 with cyclists
Parks
St. James Park1 min walk
Courthouse Square Park2 min walk
Toronto Sculpture Garden3 min walk

Schools within 1 km

  • KEYSTONE INTERNATIONAL SCHOOLS Private 3 min walk
  • VICTORIA STREET LINC English Public 5 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 5 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 8 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 8 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.