HousePrecheckCheck an address

9 Woodlawn Ave EToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2419)11.8 × 39.7 m468 m²on Woodlawn Ave E

Not a home

Land without a building

A demolition permit (26 181825, 2026) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 181825 (Proposal to demo existing building, 2026); 21 251885 STE 11 SA (Revised Site Plan Approval application to facilitate the redevelopment of the site for..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: SummerhillThe City plans more homes around the station: good for transit, and more building over time.
N20 m
11.8 m frontage39.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 181825 (Proposal to demo existing building, 2026); 21 251885 STE 11 SA (Revised Site Plan Approval application to facilitate the redevelopment of the site for..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 181825Under Reviewdemolition

    Proposal to demo existing building.

    Jun 10, 2026 · 9 WOODLAWN AVE E
  • By-law investigation25 194222 SIN 00 IRClosed

    Signs

    Jul 15, 2025 · 9 WOODLAWN AVE E
  • Development application21 251886 STE 11 OZClosed

    Official Plan and Zoning By-law Amendment application to permit a 47-storey mixed-use building, containing 730 dwelling units (including 40 replacement rental units) and 332 square metres of non-residential gross floor area. The Official Plan Amendment is required to permit the proposed height and built form on the site.

    Dec 29, 2021 · 9 WOODLAWN AVE E · City file
  • Development application21 251885 STE 11 SAUnder Review

    Revised Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 309 square metres and a residential gross floor area of 46,603 square metres. 724 residential dwelling units are proposed, of which, 40 are rental replacement units.

    Dec 29, 2021 · 9 WOODLAWN AVE E · City file
  • Zoning review06 123814 LTOClosed
    Apr 6, 2006 · 9 WOODLAWN AVE E
  • Building permit02 100378Closed

    make interior alterations

    Feb 13, 2002 · 9 WOODLAWN AVE E
  • Zoning review84 026569 LTOClosed
    Jun 18, 1984 · 9 WOODLAWN AVE E

Check before you build

  • Site-specific exception 900.11.10(2419)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2419)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 260 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 262 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 265 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  5. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 260 of former City of Toronto By-law 438-86

  6. Older by-law B

    Section 12(2) 262 of former City of Toronto By-law 438-86

  7. Older by-law C

    Section 12(2) 265 of former City of Toronto By-law 438-86

  8. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
468 m²
Frontage
11.8 m
Depth
39.7 m
Street
Woodlawn Ave E
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Summerhill. The lot is inside the Summerhill Major Transit Station Area approved by the Province (Site and Area Specific Policy 720). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c2.0; r2.5) SS2 (x2419) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
91%41 of 45 decisions
Garden suite permits
0
Laneway suite permits
4
Multiplex permits
1
Development applications
18

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 45 variance decisions: more than at 80% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    1262 YONGE ST · Jun 3, 2026 · 81 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 267-2021 (LPAT), for the 23-storey mixed-use building (currently under construction) by constructing a one-storey addition (enclosed solarium / patio) for the use of the eating establishment (restaurant), by increasing the total gross floor area, the horizontal patio projection, and building heights (the enclosed solarium/patio will have a height of 4.6 m). Also to reduce the north building setback from 5.9 m to 4.35 m, the south building separation distance from 5.5 m to 2.58 m, and to alter the location of the ground level vertical clearance area as depicted on Diagram 6. There will be a total of 127 residential dwelling units on this lot.

    5 SCRIVENER SQ · Apr 15, 2026 · 381 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 1201-2022(OLT), for the 10-storey mixed-use building to increase the number of storeys to 13-storeys, the building height from 44.95 m to 59.14 m (including the mechanical penthouse), and gross floor area, as well as modifications to the building setbacks.This is currently under the review of Site Plan Control (File No. 21 250334 STE 11 SA). There will be a total of 99 residential dwelling units on this lot, with an eating establishment (restaurant) and an outdoor patio on the ground floor.

    1140 YONGE ST · Feb 25, 2026 · 479 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey office building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 47 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    1155 YONGE ST · Oct 22, 2025 · 175 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey commercial building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 40 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    1133 YONGE ST · Oct 22, 2025 · 222 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear ground floor addition (with a basement addition below, including a walkout), a rear second storey addition, and a rear third storey addition with a rear balcony (above the second storey roof).

    49 WALKER AVE · Dec 9, 2026 · 257 m away
  • Building permit

    rev 01: revision to basement excavation and underpinning work, drainage, upper floor layouts, stair loaction, egress window, front entrance, third floor dormerProposed renovation and addition at basement; ground and second floor, ;third floor raised roof- dormer and windows deck at second and third floor.

    88 SUMMERHILL AVE · Nov 25, 2026 · 248 m away
  • Zoning review

    Not Started

    1208 YONGE ST · Nov 23, 2026 · 233 m away
  • Building permit

    Remove and replace 1 Chiller, 1 Cooling Tower, 1 Condenser Pump, 2 Building Pumps, VFDs

    1 BALMORAL AVE · Nov 17, 2026 · 240 m away
  • Building permit

    Proposal for localized concrete repairs and replacing the guards at the northwest exterior garage stairwell.

    44 JACKES AVE · Nov 4, 2026 · 224 m away
  • Zoning review

    Notice Sent

    11 TACOMA AVE · Oct 28, 2026 · 208 m away
  • Zoning review

    Closed

    67 SUMMERHILL AVE · Oct 27, 2026 · 195 m away
  • Building permit

    Proposed structural design of a pergola deck structure

    22 D BIRCH AVE · Oct 26, 2026 · 268 m away
  • Zoning review

    Notice Sent

    1226 YONGE ST · Oct 20, 2026 · 168 m away
  • Building permit

    PROPOSAL 3/4"0 TYPE 'K' SOFT PREVENTION COPPER WATER DEVICE. SERVICE, 4"0 PVC SANITARY LATERAL@ 1.0% & PROP. WATER, SITE METER AND SERVICES BACKFLOWPERMIT

    46 SHAFTESBURY AVE · Oct 5, 2026 · 209 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
Summerhill Station3 min walk
Nearest TTC stop
Yonge St at Woodlawn Ave East1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
12,932 vehicles in 14 hYonge St / Woodlawn Ave E / Woodlawn Ave W, 60 m away, May 23, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
David A. Balfour Park3 min walk
54 Jackes Ave Park3 min walk
Pricefield Road Playground5 min walk

Schools within 1 km

  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 2 min walk
  • THE LINDEN SCHOOL Private 5 min walk
  • COTTINGHAM JR PUBLIC SCHOOL English Public 8 min walk
  • DE LASALLE COLLEGE SCHOOL Private 9 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 11 min walk
  • OUR LADY OF PERPETUAL HELP CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.