Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 9 Kingslake Rd
9 Kingslake Rd is on a 30.5 m by 13.8 m lot on Kingslake Rd in Don Valley Village. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 6 records on this lot since 2011. That is more than at 95% of Toronto houses. In 2018, a development application was filed: "Draft plan of standard condominium for a 16-storey building with 209 residential units, 1 guest suite and 1 commercial unit, as well as one block of 8 back to…". Status: closed. In 2017, a development application was filed: "Phase 2.1 of the allenbury revitalization project. this application proposes the removal of 70 existing tchc rental units and the construction of a 10 storey…". Status: closed. In 2015, a development application was filed: "The applicant proposes to construct a 16-storey tower (building a), having a total of 209 residential units, one townhouse block (block t1), having a total of…". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 2 minor variance applications in the last 10 years and approved 100%. Don Mills station is a 10-minute walk.
Summary
What the City's records show on this house
- Zoning not in By-law 569-2013Moderate
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2018-03-02 | Development application18 124199 NNY 33 CD | Draft plan of standard condominium for a 16-storey building with 209 residential units, 1 guest suite and 1 commercial unit, as well as one block of 8 back to back townhouses. The building and townhouse block form one condominium corporation. The previous site plan application was for the site known as 3-5 Allenbury Gardens (15 201459 NNY 33 SA). | Closed | |
| 2017-04-18 | Development application17 145395 NNY 33 SA | Phase 2.1 of the Allenbury Revitalization Project. This application proposes the removal of 70 existing TCHC rental units and the construction of a 10 storey rental apartment building with 75 units, a 17 storey market ondominium building with 207 units, 28 rental and 8 market townhouse units. 294 vehicle parking spaces are proposed in underground parking 290 bike parking spaces are proposed. This file is associated with the master site plan file #12 263954 and the Official Plan and Zoning file # 11 293972 | Closed | |
| 2015-08-04 | Development application15 201459 NNY 33 SA | The applicant proposes to construct a 16-storey tower (Building A), having a total of 209 residential units, one townhouse block (Block T1), having a total of 8 residential units, and two levels of underground parking which would service both Building A and Block T1. This is Phase 1.2. | Closed | |
| 2013-06-14 | Development application13 188226 NNY 33 PL | Part lot exemption for independent lots for a mixed-income and mixed-tenure community which includes: 127 social housing units, 7 rental housing units, 900 residential condominium units and a public park, currently owned by Toronto Community Housing Corporation. | Closed | |
| 2012-10-17 | Development application12 263954 NNY 33 SA | Master Site Plan application for master site plan approval to demolish the existing 127 rental housing units and replace them 1,034 residential units comprised of 900 condominium units and 134 rental units. Each phase of development will require site plan approval. | Closed | |
| 2011-10-17 | Development application11 293972 NNY 33 OZ | Official Plan and Zoning By-law amendment application and rental housing demolition application to demolish the existing 127 rental housing units and replace them with 1,034 residential units comprised of 900 condominium units and 134 rental replacement units.Building heights ranging from 3 storey townhouses to 16-20 storey apartment buildings. Also includes 199 sqm of commercial space on the ground floor of one apartment building. 927 parking spaces in 2 levels of underground parking. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 414 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 8 development applications within 300 m in 10 years, none open
- 2 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Don Valley Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Don Mills StationNearest station10 min walk
- Don Mills Rd at Fairview Mall Dr North SideNearest TTC stop5 min walk
- Van Horne AveNearest cycling route11 min walk
- Woodbine Jr High & N/E Secondary AlternativeSchool7 min walk
- Kingslake Public SchoolSchool8 min walk
- Georges Vanier Secondary SchoolSchool9 min walk
- Muirhead Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3563.3
- Robberycity median 69.5103
- Auto theftcity median 192.6206
- Theft over $5,000city median 46.145.1
- Break and entercity median 172.893.3
- Theft from vehiclescity median 188.1157.7
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist