Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
6 building permits open, the oldest since 2003
Needs a closer lookStill open in the City's records: 23 225811 (Mechanical and plumbing alterations and repair: Underground Parking Garage levels, 2024, status Inspection); 23 213627 (Mechanical and plumbing alterations and repair: Underground Parking Garage levels, 2023, status Inspection); 12 235461 (This is for the infill of a void on the second floor of this University of Toronto stud..., 2012, status Inspection); and 3 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 212836 (Complete StandPipe Fire Pump UpgradeNew Fire Pump.New Fire Pump Controller.New Fire Pum..., 2026); 24 218223 (REVISION 01: Relocated feed main to other side of stairs in lobby because of ductwork r..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 72 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
28 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 212836Permit Issued
Complete StandPipe Fire Pump UpgradeNew Fire Pump.New Fire Pump Controller.New Fire Pump Circuit Breaker.New Fire Pump Conductors Back to the main Distribution panel.
Jan 6, 2026 · 89 CHESTNUT ST - Building permit24 126930Closed
REV 02: Proposed horizontal shaft wall system to maintain fire rating on floor assembly (Dwg. A222.1 & 17/A702), revised locations of ceiling access panels & air transfer, removal of existing guards on 2nd flr. lobby - to be replaced w/ a wall to act as guard.We are proposing to renovate a partial area of the 2nd floor Conference Center for the University of Toronto. The extent of the renovation includes building a Universal washroom, providing new finishes to the walls, ceilings and floors. We are also proposing to retrofit the existing Air Handling Units which provides both heating, cooling and exhausting for the 2nd floor and 3rd floor washrooms. One existing roof exhaust opening is to be capped and a new exhaust fan is designed in the 2nd floor ceiling. Additional plumbing alterations are also proposed for the re-routing of plumbing lines and upgrading in piping materials. Furthermore, the renovation also includes new electrical outlets, fixtures, data, and AV equipment to serve the new renovated Conference Center spaces on the second floor. To complete this renovation, mechanical and electrical work is expected to take place on the ground, 2nd, 3rd and 4th floors. The majority of the Architectural work will be on the 2nd floor, with patching work on the ground and 3rd floors.
Jun 20, 2025 · 89 CHESTNUT ST - By-law investigation25 164029 WST 00 IRClosed
Waste
May 23, 2025 · 89 CHESTNUT ST - Building permit24 218223Revision Issued
REVISION 01: Relocated feed main to other side of stairs in lobby because of ductwork repair. Connected old heads to new and existing main. Also relocated heads in ballroom (upper and lower ceiling) at request of client's comments attached.Installation of wet fire sprinkler system in 2nd & 3rd floor conference space
Apr 7, 2025 · 89 CHESTNUT ST - Building permit23 225811Inspection
Mechanical and plumbing alterations and repair: Underground Parking Garage levels
Feb 21, 2024 · 89 CHESTNUT ST - Building permit23 213627Inspection
Mechanical and plumbing alterations and repair: Underground Parking Garage levels
Dec 13, 2023 · 89 CHESTNUT ST - Building permit20 119742Closed
PROPOSED: PART OF 3RD FLOOR - CONFERENCE CENTRE RENOVATION
May 5, 2020 · 89 CHESTNUT ST - Building permit19 140548Closed
Proposal for parking garage repairers for existing University of Toronto parking garage.
May 15, 2019 · 89 CHESTNUT ST
Show 20 older records
- Building permit18 110247Closed
Proposed structural and plumbing repairs to an existing underground student residence and parking garage. The structural work will include concrete delamination and spalling repairs to slabs, columns, and walls, areas of slab replacement, and mastic traffic topping removal and replacement. The plumbing work will include replacing drains and deteriorating sections of pipe.
Jan 30, 2018 · 89 CHESTNUT ST - Building permit15 135394Closed
Proponed interior alterations to the ground floor level of the existing student residence building.
Apr 30, 2015 · 89 CHESTNUT ST - Building permit14 198299Closed
Proposal for interior alterations to the 28th floor for a new floor hatch in existing student residence.
Aug 22, 2014 · 89 CHESTNUT ST - Building permit12 235461Inspection
This is for the infill of a void on the second floor of this University of Toronto student residence. The infill will be approx. 14.10sm
Sep 14, 2012 · 89 CHESTNUT ST - Building permit12 215425Inspection
Proposal for interior alterations to construct a new fire separation around waste disposal storage areas on all 24 floors of existing residential building for students.
Aug 7, 2012 · 89 CHESTNUT ST - Building permit11 228995Closed
HVAC - This is for the replacement of the ceilings within the student lounge area of this "U OF T RESIDENCE BUILDING". This will include HVAC.
Jul 11, 2011 · 89 CHESTNUT ST - Building permit11 151328Cancelled
To erect and display four non-illuminated wall signs, each with static copy, at the easterly and southerly first storey building wall and in conjunction with an existing salon operating on the premises. **la Perla Salon Spa**
Mar 22, 2011 · 89 CHESTNUT ST - Building permit04 168141Inspection
HVAC - Interior alterations - remove and erect new partitions, modify existing mechanical system(s)..exisitng and proposed use - university student residence. - Interior Alterations
Sep 8, 2004 · 89 CHESTNUT ST - Building permit03 135748Inspection
alter HVAC system on the concourse level and the 27th floor.
Jun 11, 2003 · 89 CHESTNUT ST - Building permit03 138111Cancelled
make interior alterations to existing restaurant - occupant load to remain the same: Minor alterations in the kitchen & install new food service equipment: new barrier free washroom.
May 29, 2003 · 89 CHESTNUT ST - Building permit02 124885Closed
alter plans approved under bp 02-124885 by making structural alterations
Aug 27, 2002 · 89 CHESTNUT ST - Zoning review02 118565 LTOClosedMar 15, 2002 · 89 CHESTNUT ST
- Building permit00 363581Closed - Dormant
Closing exterior door for a retail suite on ground floor of Colony Hotel and change sliding door to public corridor to a pair of double swing doors. Other life-safety systems remain unchange.
Dec 21, 2000 · 89 CHESTNUT ST - Building permit00 358722Closed
Replace doors in existing 2nd floor ballroom
Nov 30, 2000 · 89 CHESTNUT ST - Building permit00 358705Closed
Make interior alterations to portion of first floor to enlarge lobby area
Nov 30, 2000 · 89 CHESTNUT ST - Zoning review99 022505 LTOClosedJun 14, 1999 · 89 CHESTNUT ST
- Building permit96 017968Closed
ALTER EXISTING HVAC SYSTEM IN CONNECTION WITH PERMIT # 383423 SS
Jul 2, 1996 · 89 CHESTNUT ST - Zoning review96 024392 LTOClosedJan 5, 1996 · 89 CHESTNUT ST
- Zoning review90 028644 LTOClosedJul 13, 1990 · 89 CHESTNUT ST
- Zoning review89 029910 LTOClosedJan 30, 1989 · 89 CHESTNUT ST
Check before you build
Site-specific exception 900.11.10(2534)
Needs a closer look4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 260 of former City of Toronto By-law 438-86
- Older by-law D
On 89 Chestnut St., former City of Toronto by-laws 192-68, 142-69, and 147-72
1 part for other addresses
- E On 112 Elizabeth St., former City of Toronto by-law 710-82.
Lot facts
- Area
- 3,513 m²
- Frontage
- 48.2 m
- Depth
- 73.8 m
- Street
- Foster Pl
- Corner lot
- Yes, also on Chestnut St73.8 m along it
- Public lane
- None
- House footprint
- 3,280 m²
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0 m and 2 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 5house, garage, sheds
- Max height
- 61 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 7.8 (c4.5; r7.8) SS1 (x2534) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust ruby lace (17 cm), elm (9 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 89%8 of 9 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 20
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 433 m away - Minor varianceApproved
To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.
292 DUNDAS ST W · Mar 4, 2026 · 478 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 172 m away - Minor varianceApproved
To permit a place of amusement (arcade) use on this subject lot.
247 YONGE ST · Jan 8, 2025 · 426 m away - Minor varianceApproved
To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.
203 DUNDAS ST W · Oct 16, 2024 · 180 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots and to create new easements/rights-of-way.
123 EDWARD ST · Oct 2, 2027 · 192 m away - Building permit
Proposal for interior alterations to existing office suite. To include HVAC, sprinkler alterations.
393 UNIVERSITY AVE · Nov 23, 2026 · 168 m away - Building permit
Installation of two (2) temporary structures for Cavalcade of Lights 2026 (Event)30' x 30' Tent for Arts & Crafts Supplied by Gervais Tents20' x 16' x 5' Theatre Stage Extension Riser Supplied by PSIInstall 11/25/2026 / Removal 11/29/2026
100 QUEEN ST W · Nov 19, 2026 · 144 m away - Building permit
Proposed an interior alteration
595 BAY ST · Nov 19, 2026 · 256 m away - Building permit
Proposal for interior alterations for Suite 2105 &2103
180 DUNDAS ST W · Nov 18, 2026 · 154 m away - Building permit
Proposal for interior alterations including furniture & elevator refurbishment.
100 QUEEN ST W · Nov 18, 2026 · 144 m away - Building permit
Interior alteration to existing office space (Unit 2200)
400 UNIVERSITY AVE · Nov 18, 2026 · 272 m away - Building permit
INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO
121 DUNDAS ST W · Nov 17, 2026 · 125 m away - Building permit
Tenant improvement to existing office suite located on the 8th floor of 375 University Avenue. No changes of use or exterior work proposed. No change to existing demising walls of suite.
375 UNIVERSITY AVE · Nov 17, 2026 · 177 m away - Building permit
Mechanical retrofit to improve building energy efficiency including working in various building Mechanical rooms and roofs. Work will be done on the chilled water, heating water and glycol piping networks. Equipment will be updated and replaced including rooftop air-source heat pumps, heat recovery chillers, updated air handling equipment, and steam network modifications.
124 EDWARD ST · Nov 9, 2026 · 235 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- St Patrick Station4 min walk
- Nearest TTC stop
- Dundas St West at Chestnut St2 min walk
- Nearest cycling route
- Bay StSharrows - Arterial, 3 min walk
- Nearest traffic count
- 3,648 vehicles in 14 hChestnut St / Armoury St, 60 m away, Oct 15, 2025
- Serious collisions within 500 m
- 82021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 1 with cyclists
- Parks
- Larry Sefton Park2 min walk
- Trinity Square3 min walk
- Gallery Park8 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 5 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 7 min walk
- CONTACT ALTERNATIVE SCHOOL English Public 7 min walk
- OCAD UNIVERSITY - ANNEX BUILDING University 8 min walk
- OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 8 min walk
- OCAD UNIVERSITY - STUDENT CENTRE University 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.