HousePrecheckCheck an address

88 Scott StToronto · zoning, lot size and permit records

≈ 36.5 × 40.7 m946 m²on Colborne Stcorner, also on Scott St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 16 208012 (REV #1-ADD ONE DEVICE Installation of 12 electromagnetic locks from P1 Level to Floor 6, 2021, status Revision Issued); 17 273450 (Proposal to install a signage support structure on the main floor of an existing mixed-..., 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 36.5 m frontage≈ 40.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 16 208012 (REV #1-ADD ONE DEVICE Installation of 12 electromagnetic locks from P1 Level to Floor 6, 2021, status Revision Issued); 17 273450 (Proposal to install a signage support structure on the main floor of an existing mixed-..., 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 25 208860 PRS 00 IR (Property Standards, 2025); 25 110903 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

17 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 208860 PRS 00 IRClosed

    Property Standards

    Aug 12, 2025 · 88 SCOTT ST
  • By-law investigation25 110903 PRS 00 IRClosed

    Property Standards

    Jan 30, 2025 · 88 SCOTT ST
  • By-law investigation25 110869 SIN 00 IRClosed

    Signs

    Jan 30, 2025 · 88 SCOTT ST
  • Building permit16 208012Revision Issued

    REV #1-ADD ONE DEVICE Installation of 12 electromagnetic locks from P1 Level to Floor 6

    Mar 11, 2021 · 88 SCOTT ST
  • Building permit19 251604Closed

    Proposal for interior alterations to existing ground floor unit for new presentation/sales centre (Concert Properties, Sherbourne and Howard Condos) - UNIT 3

    Dec 13, 2019 · 88 SCOTT ST
  • Building permit18 183971Closed

    To erect and display two illuminated wall signs displaying static copy on the first storey of the easterly and southerly elevations, boht measuring 3.89 m by 0.24 m at a height of 3.40 m. ***AROMA ESPRESSO BAR***

    Jun 27, 2018 · 88 SCOTT ST
  • Building permit17 249303Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display one wall sign, projecting sign and ground sign, all illuminated and displaying static copy. The proposed wall sign is located on the first storey west elevation, measuring 0.37 metres vertically by 5.97 metres horizontally. The proposed projecting sign is located on the first storey north elevation, containing two sign faces, oriented in a back-to-back configuration, measuring 0.84 metres vertically by 0.91 metres horizontally. The proposed ground sign is located on the south frontage, containing two sign faces, oriented in a back-to-back configuration, measuring 2.35 metres vertically by 1.07 metres horizontally at a height of 4.26 metres.**88 SCOTT** **20 WELLINGTON**

    Jan 31, 2018 · 88 SCOTT ST
  • Building permit17 273450Inspection

    Proposal to install a signage support structure on the main floor of an existing mixed-use (office & residential) building.

    Jan 19, 2018 · 88 SCOTT ST
Show 9 older records
  • Building permit17 222091Closed

    To erect and display two static illuminated wall signs.**GENERIC**

    Aug 24, 2017 · 88 SCOTT ST
  • Building permit16 249536Closed

    Proposal to install 2 maglocks in existing office space - Doors D2002 and D2008

    Nov 14, 2016 · 88 SCOTT ST
  • Development application16 138743 STE 28 CDClosed

    Proposal for draft plan of standard condominium for a 58-storey mixed-use condominium consisting of 523 residential units and 326 parking spaces.

    Apr 11, 2016 · 88 SCOTT ST · City file
  • Zoning review16 134251 ZSVClosed
    Mar 31, 2016 · 88 SCOTT ST
  • Zoning review15 243551 ZPRClosed
    Oct 27, 2015 · 88 SCOTT ST
  • Building permit12 155755Closeddemolition

    This is for the demolition of the existing 7 storey office building.

    Jan 15, 2013 · 88 SCOTT ST
  • Building permit12 219452Closed

    Proposal to close various window on 2nd to 5th floors.

    Aug 29, 2012 · 88 SCOTT ST
  • Development application11 259298 STE 28 SAClosed

    Site plan approval application is to permit a 58-storey residential building comprised of a 5-storey podium and 53-storey tower. The proposed building is 197 metres tall including the mechanical penthouse and contains 523 units. The gross floor area of the building is 50072 square metres which includes 1106 square metres of ground floor retail uses. The proposal includes 321 car parking spaces in 5 levels of underground parking. The applicant is proposing to demolish the existing 7-storey structure and preserve and reuse its stone cladding for the new podium. The applicant has advised it is their intent to develop this project as a condominium - see 11 190645.

    Aug 18, 2011 · 88 SCOTT ST
  • Development application11 190645 STE 28 OZClosed

    The purpose of the rezoning application is to permit a 58-storey residential building comprised of a 5-storey podium and 53-storey tower. Revision has been submitted including the following: proposed height was 195 metres now 202 metres tall including the mechanical penthouse; proposed units was 513 now 472 units; proposed gross floor area of the building was 48,605 square metres which includes 734 square metres of ground floor retail uses now the gross floor area is proposed at 49,801 square metres including 850 square metres of retail space at grade and 5,580 square metres of office in the Wellington Street part of the podium. The proposal previously included 365 car parking spaces and now includes 343 spaces in 5 levels of underground parking. Other revisions include: changes to the main floor design, changes to the access off of Colborne Street to the internal loading area, vehicular access off of Wellington street has been deleted, atrium space on the main floor has been revised. The applicant is proposing to demolish the existing 7-storey structure and preserve and reuse its stone cladding for the new podium. The applicant has advised it is their intent to develop this project as a condominium.

    May 9, 2011 · 88 SCOTT ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
946 m²
Frontage
36.5 mestimated, irregular lot
Depth
40.7 mestimated, irregular lot
Street
Colborne St
Corner lot
Yes, also on Scott St40.7 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%8 of 8 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    28

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

      20 KING ST W · Jun 17, 2026 · 216 m away
    • Minor varianceApproved

      To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

      89 CHURCH ST · Jan 15, 2025 · 416 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

      71 KING ST E · Dec 11, 2024 · 150 m away
    • Minor varianceApproved

      To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

      34 KING ST E · Sep 25, 2024 · 131 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 702-2021(OLT), as amended by City Wide Zoning By-law 569-2013), which include an increase to the overall tower height (from 45-storeys to 48-storeys) and total gross floor area, and a reduction of parking spaces, amenity space, and number of two or more bedrooms, for the approved mixed-use building (currently under construction).

      114 CHURCH ST · Dec 6, 2023 · 391 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alteration to existing office suites 208, 216, 230 and 306

      56 THE ESPLANADE · Nov 23, 2026 · 244 m away
    • Building permit

      Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA

      4 KING ST W · Nov 23, 2026 · 173 m away
    • Building permit

      Revision 01 - Relocate 2 smoke detectors at the interior staircase.---------------------------------------------------------------Proposal to extend existing interconnected stair between 55th and 56th floor to 57th floor

      40 KING ST W · Nov 23, 2026 · 266 m away
    • Building permit

      Proposed interior fit-out for new tenant 'SMART & BIGGAR'.

      40 KING ST W · Nov 20, 2026 · 266 m away
    • Building permit

      Revision No.1: New Fire Shutter Window

      30 ADELAIDE ST E · Nov 20, 2026 · 280 m away
    • Building permit

      Proposal for interior alterations - demolition of interior partition layout and ceilings back to base condition; washroom renovation/corridor and plumbing fixture/finish

      199 BAY ST · Nov 19, 2026 · 245 m away
    • Building permit

      Proposal to design and install sprinkler modifications (return to base building protection) on level 22, suite 2250 in an existing office

      161 BAY ST · Nov 19, 2026 · 284 m away
    • Building permit

      Revision 01 - Revision to permit 26 155898 BLD 00 BA and 26 155898 HVA 00 BA. (Revised Layout)Proposed interior alteration to 21st and 22nd floor office

      199 BAY ST · Nov 19, 2026 · 245 m away
    • Building permit

      PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING AND MAGLOCK PERMITS.

      40 KING ST W · Nov 18, 2026 · 266 m away
    • Building permit

      PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING.

      40 KING ST W · Nov 18, 2026 · 266 m away

    Neighbourhood: Downtown Yonge East

    About the area around the lot, not the lot itself.

    Nearest station
    King Station1 min walk
    Nearest TTC stop
    King Station - Southbound Platform1 min walk
    Nearest cycling route
    Yonge StBike Lane, 3 min walk
    Nearest traffic count
    8,254 vehicles in 14 hWellington St E / Scott St / Berczy Park Trl, 60 m away, Jul 17, 2024
    Serious collisions within 500 m
    172021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 4 with cyclists
    Parks
    Berczy Park1 min walk
    Courthouse Square Park4 min walk
    Toronto Sculpture Garden4 min walk

    Schools within 1 km

    • KEYSTONE INTERNATIONAL SCHOOLS Private 4 min walk
    • VICTORIA STREET LINC English Public 5 min walk
    • DOWNTOWN ALTERNATIVE SCHOOL English Public 8 min walk
    • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 9 min walk
    • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 10 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDowntown Yonge EastMedian neighbourhood
    Median household income (2020)$69,500$84,500
    Households that own their home36%54%
    Population (2021)17,70016,813
    Homes built in 1960 or before7%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDowntown Yonge EastCity median
    Assault2360.8636.3
    Robbery143.369.5
    Shootings11.910.5
    Auto theft75.6192.6
    Theft over $5,00099.546.1
    Break and enter274.7172.8
    Theft from vehicles390.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.