HousePrecheckCheck an address

88 Northline RdToronto · zoning, lot size and permit records

Employment · E 1.068.0 × 91.9 m5,612 m²on Northline Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 3 development applications open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
68.0 m frontage91.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit26 158619Closed

    Proposal for backflow preventor to install new 1" DCVA on incoming waterline.

    Jun 11, 2026 · 88 NORTHLINE RD

Lot facts

Area
5,612 m²
Frontage
68 m
Depth
91.9 m
Street
Northline Rd
Corner lot
No
Public lane
None
House footprint
1,091 m²roof up to 6.8 m
Back yard
41.4 mhouse to rear lot line
Side yards
12.1 m and 29.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
50%1 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing one-storey commercial building (public self-storage warehouse) which is currently under construction (Building Permit 20 25 204049 BLD 00 BA), by constructing partial second storey additions ((front (east) and rear (west) staircase enclosures)), and a new enclosed internal second level (additional self-storage lockers) within the roof of the existing open air space of the building. Also, to convert the cafeteria and portions of the office space into additional public self-storage warehouse use. The total number of accessible parking spaces, vehicular parking spaces, and loading spaces on the lot will be reduced. A related Site Plan Control application (File #20 24 186227 STE 19 SA) is approved with conditions.

    32 CRANFIELD RD · Oct 7, 2026 · 373 m away
  • Minor varianceApproved

    To alter the existing one-storey non-residential building (industrial and commercial uses) by constructing a rear one-storey addition (for industrial use) with access stairs.

    90 NORTHLINE RD · Jun 3, 2026 · 71 m away
  • Minor varianceApproved

    To alter the existing detached building (manufacturing use) by constructing a one-storey addition along a portion of the south side wall, for a vehicle depot use and 12 loading docks.

    5 BERMONDSEY RD · Feb 26, 2025 · 483 m away
  • Minor varianceApproved

    To convert the existing one-storey detached non-residential building from an Office Warehouse Use into a Public Self Storage Warehouse Use with an office area. The existing eating establishment (cafe) will be maintained and unaltered.

    32 CRANFIELD RD · Jun 19, 2024 · 373 m away
  • Minor varianceApproved

    To alter the existing industrial building by constructing a new south side addition, new unloading station and new silos in the north side yard. The property has a legal non-conforming status due to its present use for "manufacture of goods and materials including an accessory factory retail outlet" being located within the building prior to the enactment of Zoning By-law 6752.

    5 BERMONDSEY RD · Mar 8, 2016 · 483 m away

Latest activity nearby

  • Zoning review

    Cancelled

    100 SUNRISE AVE · Oct 16, 2026 · 242 m away
  • Building permit

    Proposal for localized concrete repairs, balcony repairs, railing replacement and alterations to building envelope (new window installation).

    5-11 WAKUNDA PL · Oct 8, 2026 · 291 m away
  • Zoning review

    Cancelled

    131 SUNRISE AVE · Sep 18, 2026 · 292 m away
  • Building permit

    Change of Use Only - No proposed construction or interior alterations.

    100 SUNRISE AVE · Aug 11, 2026 · 242 m away
  • Building permitsecondary suite

    Proposed interior alterations for second suite and one window enlargement.

    3 BLAIR ST · Aug 7, 2026 · 213 m away
  • Building permit

    Proposal for ventilation system retrofit.

    5 WAKUNDA PL · Jul 8, 2026 · 259 m away
  • Building permitsecondary suite

    Proposed interior alterations for second suite and one window enlargement.

    3 BLAIR ST · Jun 25, 2026 · 213 m away
  • Zoning review

    Closed

    131 SUNRISE AVE · Jun 19, 2026 · 292 m away
  • Building permit

    Proposal for backflow preventor to install new 1" DCVA on incoming waterline.

    88 NORTHLINE RD · Jun 11, 2026 · 14 m away
  • Building permit

    Addition of plumbing for a 3 piece bathroom and sink in basement.

    22 TUCKER ST · Jun 5, 2026 · 156 m away

Neighbourhood: Victoria Village

About the area around the lot, not the lot itself.

Nearest station
O'Connor Station17 min walk
Nearest TTC stop
O'Connor Dr at Wakunda Pl South Side3 min walk
Nearest cycling route
Bermondsey RdSigned Route (No Pavement Markings), 7 min walk
Nearest traffic count
2,535 vehicles in 8 hSunrise Ave / Hobson Ave, 190 m away, Oct 13, 2005
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Willis Blair Parkette4 min walk
Parma Park5 min walk
Charles Sauriol Conservation Area8 min walk

Schools within 1 km

  • O'CONNOR PUBLIC SCHOOL English Public 4 min walk
  • IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 10 min walk
  • VICTORIA PARK ELEMENTARY SCHOOL English Public 14 min walk
  • CLAIRLEA PUBLIC SCHOOL English Public 15 min walk
  • SELWYN ELEMENTARY SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureVictoria VillageMedian neighbourhood
Median household income (2020)$68,000$84,500
Households that own their home41%54%
Population (2021)17,36516,813
Homes built in 1960 or before29%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleVictoria VillageCity median
Assault591.2636.3
Robbery20.469.5
Auto theft285.4192.6
Theft over $5,00030.646.1
Break and enter208.9172.8
Theft from vehicles178.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.