HousePrecheckCheck an address

88 Harbour StToronto · zoning, lot size and permit records

≈ 63.8 × 93.8 m2,745 m²on Bremner Blvdcorner, also on Harbour St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 3 development applications open within 300 m, up to 59 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 63.8 m frontage≈ 93.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards, Zoning): 26 261873 PRS 00 IR (Property Standards, 2026); 25 251768 HEA 00 IR (Adequate Heat, 2025); 25 110427 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 59 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 261873 PRS 00 IRClosed

    Property Standards

    Oct 28, 2026 · 88 HARBOUR ST
  • By-law investigation25 251768 HEA 00 IRClosed

    Adequate Heat

    Nov 10, 2025 · 88 HARBOUR ST
  • By-law investigation25 110427 ZON 00 IRClosed

    Zoning

    Jan 29, 2025 · 88 HARBOUR ST
  • Building permit22 220138Closed

    Application for a permit to erect and display one wall sign and 3 projecting sign, all illuminated and displaying static copy.*****THE SECOND CITY*****

    Oct 18, 2024 · 88 HARBOUR ST
  • Building permit23 135787Closed

    The proposal contains two wall signs and two projecting signs, all illuminated and displaying static copy erected on the north and south elevation of the building at above noted premises. ZMP 17-185702 approved with conditions. Dimensions:Wall Signs:Sign 1: 0.75m L x 4.73m W x 0.06m D at a height of 10.75m, erected at the second storey on the south elevation.Sign 4: 0.71m L x 4.46m W x 0.12m D at a height of 21.74m, erected at the third storey on the north elevation.Projecting signs:Sign 2: 1.45m L x 2.74m W x 0.06m D at a height of 14.81m, erected at the second and third storey on the south elevation.Sign 3: 0.85m L x 1.61m W x 0.06m D at a height of 14.21m, erected at the second and third storey on the south elevation.***NATURE'S EMPORIUM***

    Jul 10, 2023 · 88 HARBOUR ST
  • Building permit22 173589Closed

    Proposal for interior alterations to a portion of an existing office Suite 1100 on the 11th floor level.

    Jul 26, 2022 · 88 HARBOUR ST
  • Building permit21 227957Closed

    Application for a permit to erect and display two illuminated wall signs.*****SHOPS*****

    Nov 3, 2021 · 88 HARBOUR ST
  • Zoning review20 233051 ZBAClosed
    Dec 22, 2020 · 88 HARBOUR ST
Show 4 older records
  • Zoning review20 131071 ZPRClosed
    Apr 9, 2020 · 88 HARBOUR ST
  • Building permit19 193343Closed

    To erect and display one illuminated wall sign. Erected at the second storey of the south elevation of the building.****HEALTH ONE****

    Aug 7, 2019 · 88 HARBOUR ST
  • Building permit19 187827Closed

    To erect and display two wall signs and two projecting signs, all illuminated.****KINTON RAMEN********KINKA****

    Aug 2, 2019 · 88 HARBOUR ST
  • Development application11 295626 STE 28 OZClosed

    PROPERTY KNOWN AS BOTH 90 Harbour and 1 York St. Official Plan Amendment and Rezoning application for new mixed use development - proposing 3 buildings (1 office tower and 2 residential buildings). Office tower 40 stories (158 metres). Two residential buildings 223 and 233 metres including mechanical penthouse ( 66 and 70 stories) with a total of 1313 dwelling units for both buildings. Shared parking with office and residential - 4 levels below grade - 735 parking spaces - 1518 bicycle parking spaces.

    Oct 19, 2011 · 88 HARBOUR ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,745 m²
Frontage
63.8 mestimated, irregular lot
Depth
93.8 mestimated, irregular lot
Street
Bremner Blvd
Corner lot
Yes, also on Harbour St93.8 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%8 of 8 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    6

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.

      200 QUEENS QUAY W · Nov 12, 2025 · 261 m away
    • Minor varianceApproved

      To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.

      7 YONGE ST · Sep 3, 2025 · 416 m away
    • Minor varianceApproved

      To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.

      7 YONGE ST · Apr 23, 2025 · 416 m away
    • Minor varianceApproved

      To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.

      20 BAY ST · Jan 15, 2025 · 140 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.

      200 QUEENS QUAY W · Dec 6, 2023 · 261 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alterations to existing office.

      25 YORK ST · Nov 24, 2026 · 220 m away
    • Building permit

      Proposal to construct a canopy at ground floor Galleria Entrance.

      25 YORK ST · Nov 24, 2026 · 220 m away
    • Building permit

      REV03: Addition of new partition and door to enclose Cafe / Lunch Room area on east side of floor plan. REV02: Proposed revision of office layout scope of work as shown on submitted drawings. Interior Alterations: Extensive Renovation, demolition of all existing interior buildout, construction of new full floor office layout.Rev 01 - Office layout revisions throughout scope of work as shown on submitted drawingsProposal for interior alterations to existing office space on the 8th floor - Healthcare of Ontario Pension Plan

      1 YORK ST · Nov 23, 2026 · 132 m away
    • Building permit

      Rev 01: Addition of fire alarm speakers and strobesINTERIOR ALTERATIONS TO EXISTING OFFICE SPACE - LEVEL 4

      10-20 BAY ST · Nov 20, 2026 · 170 m away
    • Building permit

      Proposal for interior alterations to fit out new office space

      88 QUEENS QUAY W · Nov 19, 2026 · 138 m away
    • Building permit

      Proposal for interior alterations within an existing office

      88 QUEENS QUAY W · Nov 18, 2026 · 138 m away
    • Building permit

      Proposed Interior alterations and partial change of use to convert a portion of existing office space into a coffee bar.

      18 YORK ST · Nov 18, 2026 · 273 m away
    • Building permit

      Interior alterations - new laundry area in existing storage room

      40 BAY ST · Nov 17, 2026 · 159 m away
    • Building permit

      Proposal for Interior Alterations to an existing tenant space.

      81 BAY ST · Nov 16, 2026 · 264 m away
    • Building permit

      Proposal for interior alterations on floor 9.

      81 BAY ST · Nov 16, 2026 · 264 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station3 min walk
    Nearest TTC stop
    Bay St at Harbour St South Side - Jack Layton Ferry Terminal3 min walk
    Nearest cycling route
    Harbour StMulti-Use Trail - Boulevard, 1 min walk
    Nearest traffic count
    11,026 vehicles in 8 hLake Shore Blvd W / Bremner Blvd, 30 m away, Apr 21, 2009
    Serious collisions within 500 m
    142021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 1 with cyclists
    Parks
    Love Park1 min walk
    Harbour Square Park Lands4 min walk
    Toronto Waterfront Park4 min walk

    Schools within 1 km

    • DOWNTOWN ALTERNATIVE SCHOOL English Public 16 min walk
    • KEYSTONE INTERNATIONAL SCHOOLS Private 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.