HousePrecheckCheck an address

88 George Henry BlvdToronto · zoning, lot size and permit records

Also 100 George Henry Blvd, 102 George Henry Blvd, 104 George Henry Blvd, 106 George Henry Blvd, 108 George Henry Blvd and 9 more

Residential townhouse · RT (au220.0)≈ 147.7 × 311.9 m29,186 m²on Parfield Drcorner, also on George Henry Blvd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 2.9 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 15 252911 (To install (3) Backflow Prevention Devices (Water only) in basement mechanical room, 2015, status Permit Issued); 09 113480 (Rough-in fixture in basement, 2009, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 44 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • Major Transit Station Area: Don MillsThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 147.7 m frontage≈ 311.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 15 252911 (To install (3) Backflow Prevention Devices (Water only) in basement mechanical room, 2015, status Permit Issued); 09 113480 (Rough-in fixture in basement, 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 139216 PRS 00 IR (Property Standards, 2026); 26 109034 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 44 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 222454 WST 00 IRClosed

    Waste

    Aug 19, 2026 · 112 GEORGE HENRY BLVD
  • By-law investigation26 139216 PRS 00 IRClosed

    Property Standards

    Apr 6, 2026 · 94 GEORGE HENRY BLVD
  • By-law investigation26 109034 PRS 00 IRClosed

    Property Standards

    Jan 26, 2026 · 94 GEORGE HENRY BLVD
  • By-law investigation25 158538 ELS 00 IRClosed

    Election Signs: Have signs which have not been removed 72 hours after the election.

    May 13, 2025 · 1651 SHEPPARD AVE E
  • Building permit23 131156Closed

    Garage stairwell repairs

    May 2, 2023 · 86 GEORGE HENRY BLVD
  • Building permit16 225236Closed

    Installation of a portable ladder access and required ancillary work at Toronto Transit Commission's Welbec EEB (Emergency Exit Building)

    Nov 4, 2016 · 1651 SHEPPARD AVE E
  • Building permit15 252911Permit Issued

    To install (3) Backflow Prevention Devices (Water only) in basement mechanical room.

    Nov 19, 2015 · 106 GEORGE HENRY BLVD
  • Building permit10 223667Closed

    Revise structural design for deck

    Jul 20, 2011 · 100 GEORGE HENRY BLVD
Show 7 older records
  • Building permit09 113480Inspection

    Rough-in fixture in basement

    Mar 3, 2009 · 94 GEORGE HENRY BLVD
  • Zoning review04 137893 LTOClosed
    May 21, 2004 · 1651 SHEPPARD AVE E
  • Zoning review04 137883 LTOClosed
    May 21, 2004 · 1651 SHEPPARD AVE E
  • Building permit03 123753Closed

    Garage roof slab water proofing - West Garage

    May 7, 2003 · 104 GEORGE HENRY BLVD
  • Building permit03 123745Closed

    Garage roof slab water proofing - Central Garage

    May 7, 2003 · 104 GEORGE HENRY BLVD
  • Building permit03 122412Closed

    Garage roof slab water proofing - East Garage

    May 7, 2003 · 104 GEORGE HENRY BLVD
  • Building permit99 088508Cancelled

    **INT ALT-PRKING GARAGE

    May 18, 1999 · 86 GEORGE HENRY BLVD

Lot facts

Area
29,186 m²
Frontage
147.7 mestimated, irregular lot
Depth
311.9 mestimated, irregular lot
Street
Parfield Dr
Corner lot
Yes, also on George Henry Blvd311.9 m along it
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Major Transit Station Area: Don Mills. The lot is inside the Don Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 731). Source
  • Sheppard East Subway Corridor Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RT (au220.0) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: honey locust (25 cm), maple, norway (17 cm), catalpa, northern (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
11

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Backwater Valve installation

    77 GEORGE HENRY BLVD · Jul 29, 2026 · 208 m away
  • Building permit

    Proposed garage roof deck waterproofing and restoration project.

    1650 SHEPPARD AVE E · May 14, 2026 · 110 m away
  • Zoning review

    Cancelled

    70 FOREST MANOR RD · Nov 12, 2025 · 256 m away
  • Building permit

    1 WALL SIGN**CITY BRITE ELECTRIC INC**

    37 FARMVIEW CRES · Oct 6, 2025 · 227 m away
  • Zoning review

    Closed

    2600 DON MILLS RD · Aug 18, 2025 · 232 m away
  • Zoning review

    Cancelled

    80 GEORGE HENRY BLVD · Aug 14, 2025 · 201 m away
  • Building permit

    Proposed Backwater Valve Installation.

    28 MEADOWGLADE CRES · Jun 13, 2025 · 230 m away
  • Building permit

    Work under this Contract includes rehabilitation of the podium deck and parking garage structure at the building located at 25 Leith Hill Road in the City of Toronto in the Province of Ontario.

    25 LEITH HILL RD · Mar 31, 2025 · 257 m away
  • Development application

    Combined Official Plan & Zoning By-law Amendment for four buildings with heights of 47, 42, 42 and 42-storeys, together with an onsite public park occupying 1,096.8 m2. The total residential gross floor area (GFA) of the four buildings is 126,673 m2, with a total of 1,814 units proposed.

    2600 DON MILLS RD · Dec 31, 2024 · 227 m away · City file
  • Zoning review

    Closed

    2600 DON MILLS RD · Nov 19, 2024 · 232 m away

Neighbourhood: Henry Farm

About the area around the lot, not the lot itself.

Nearest station
Don Mills Station4 min walk
Nearest TTC stop
Sheppard Ave East at Don Mills Rd West Side2 min walk
Nearest cycling route
Shaughnessy BlvdSharrows, 6 min walk
Nearest traffic count
26,239 vehicles in 8 hDon Mills Rd / Sheppard Ave E, 170 m away, Feb 28, 2023
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Parkway Forest Park6 min walk
Dallington Park7 min walk
Oriole Park - North York11 min walk

Schools within 1 km

  • ST TIMOTHY CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • SHAUGHNESSY PUBLIC SCHOOL English Public 8 min walk
  • FOREST MANOR PUBLIC SCHOOL English Public 9 min walk
  • DALLINGTON PUBLIC SCHOOL English Public 10 min walk
  • WOODBINE JR HIGH & N/E SECONDARY ALTERNATIVE English Public 15 min walk
  • NORTH TORONTO CHRISTIAN SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHenry FarmMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home39%54%
Population (2021)19,84016,813
Homes built in 1960 or before5%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHenry FarmCity median
Assault286.8636.3
Robbery51.169.5
Homicide3.95.3
Shootings3.910.5
Auto theft192.5192.6
Theft over $5,00027.546.1
Break and enter55172.8
Theft from vehicles94.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.