HousePrecheckCheck an address

879 Kipling AveToronto · zoning, lot size and permit records

Employment · E 1.032.7 × 38.7 m1,253 m²on Kipling Avecorner, also on Olivewood Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 09 163952 (Install one 3/4-inch backflow prevention device (RP) in existing service station, 2009, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • Major Transit Station Area: KiplingThe City plans more homes around the station: good for transit, and more building over time.
N20 m
32.7 m frontage38.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2009

    Needs a closer look

    Still open in the City's records: 09 163952 (Install one 3/4-inch backflow prevention device (RP) in existing service station, 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit25 242300Closeddemolition

    Proposal for demolition of a single-storey commercial building currently being used for a convenience store.

    Nov 3, 2025 · 879 KIPLING AVE
  • Building permit10 149925Closed

    To replace first party sign panels for one double sided illuminated ground sign, two illuminated canopy signs and 3 illuminated wall signs for "Husky" gas station.

    May 19, 2010 · 879 KIPLING AVE
  • Building permit09 163952Inspection

    Install one 3/4-inch backflow prevention device (RP) in existing service station.

    Sep 25, 2009 · 879 KIPLING AVE
  • Zoning review08 120868 LTOClosed
    Mar 20, 2008 · 879 KIPLING AVE

Lot facts

Area
1,253 m²
Frontage
32.7 m
Depth
38.7 m
Street
Kipling Ave
Corner lot
Yes, also on Olivewood Rd38.7 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Kipling. The lot is inside the Kipling Major Transit Station Area approved by the Province (Site and Area Specific Policy 626). Source
  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
90%9 of 10 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To maintain the existing building.

    889 KIPLING AVE · May 25, 2023 · 71 m away
  • Minor varianceApproved

    To maintain the existing building.

    891 KIPLING AVE · May 25, 2023 · 90 m away
  • Minor varianceApproved

    To permit vehicle car sales or a vehicle dealership within the existing vehicle repair shop or vehicle service shop.

    362 OLIVEWOOD RD · Jun 3, 2021 · 256 m away
  • Minor varianceApproved

    To construct a one-storey rear addition.

    39 ADVANCE RD · Sep 15, 2020 · 478 m away
  • Minor varianceApproved

    To construct a detached garage in the rear yard.

    113 JUDGE RD · Nov 7, 2019 · 207 m away

Latest activity nearby

  • Building permit

    Supply and install (2) replacement HVAC RTUS

    850 KIPLING AVE · Nov 4, 2026 · 182 m away
  • Consent (lot split)Approved

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    891 KIPLING AVE · Oct 22, 2026 · 90 m away
  • Building permit

    A proposal to erect and display 5 Wall Signs and one Ground Sign displaying static copy. ***MIDAS***

    371 OLIVEWOOD RD · Jun 18, 2026 · 112 m away
  • Building permit

    Proposal for interior alterations to auto shop/

    371 OLIVEWOOD RD · Jun 12, 2026 · 112 m away
  • Consent (lot split)Pending

    Application Received

    889 KIPLING AVE · Jun 11, 2026 · 71 m away
  • Zoning review

    Cancelled

    897 KIPLING AVE · May 21, 2026 · 132 m away
  • Building permitdemolition

    Proposal for demolition of a single-storey commercial building currently being used for a convenience store.

    879 KIPLING AVE · Nov 3, 2025 · 6 m away
  • Zoning review

    Cancelled

    351 OLIVEWOOD RD · Oct 16, 2025 · 221 m away
  • Building permit

    Proposal to replace existing backflow prevention device.

    365 OLIVEWOOD RD · May 6, 2025 · 159 m away
  • Zoning review

    Closed

    121 JUDGE RD · Feb 20, 2025 · 238 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Kipling Station5 min walk
Nearest TTC stop
Kipling Ave at Olivewood Rd1 min walk
Nearest cycling route
Kipling AveCycle Track, 6 min walk
Nearest traffic count
15,126 vehicles in 8 hKipling Ave / Olivewood Rd, 40 m away, Feb 8, 2022
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Six Points Park8 min walk
Fieldway Parkette9 min walk
Cloverdale Park14 min walk

Schools within 1 km

  • MINDWERX4KIDS LEARNING CENTRE SCHOOL Private 12 min walk
  • ACADEMY OF MATH AND ENGLISH Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.