Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 24 254353 PRS 00 IR (Property Standards, 2024).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 232909 (Proposed demolition of existing 4-storey building at 878 Yonge Street & 3 Scollard Stre..., 2026); 24 103640 STE 11 SA (Site Plan Amendment to the previously approved 16 173156 STE 11 SA, 2024).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0586/03TEY (The site is located at the southwest corner of Scollard and Yonge Streets and is occupi..., 2004).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
26 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 232909Application Acceptable
Proposed demolition of existing 4-storey building at 878 Yonge Street & 3 Scollard Street to allow the construction of a new 50-storey residential building with a 10m underground (2-levels) on the property.
Sep 4, 2026 · 878 YONGE ST - Building permit25 215682Closed
Proposed cafe with internal refinishing of flooring and bathroom tiling / plumbing for coffe machines.
Nov 10, 2025 · 878 YONGE ST - Building permit25 217848Cancelled
3 Wall Signs
Aug 29, 2025 · 878 YONGE ST - By-law investigation24 254353 PRS 00 IRClosed
Property Standards
Dec 30, 2024 · 878 YONGE ST - Zoning review24 105603 ZAPClosedJan 17, 2024 · 878 YONGE ST
- Development application24 103640 STE 11 SANOAC Issued
Site Plan Amendment to the previously approved 16 173156 STE 11 SA
Jan 11, 2024 · 3 SCOLLARD ST · City file - Zoning review21 119557 LTOClosedFeb 24, 2021 · 878 YONGE ST
- Zoning review19 253469 ZPRClosedNov 25, 2019 · 878 YONGE ST
Show 18 older records
- Development application16 173156 STE 27 SAClosed
SPA application for a 46-storey residential building.
Jun 13, 2016 · 878 YONGE ST · City file - Development application16 173154 STE 27 OZClosed
A rezoning and OPA application for a 51-storey residential tower (179 metres tall including 3 mechanical floors). A total of 165 residential units are proposed along with density of 32.2 times the area of the lot. The application has been refused by City Council and it has been appealed to the Ontario Municipal Board. A site plan application (12 173156 STE 27 SA) has also been submitted.
Jun 13, 2016 · 878 YONGE ST · City file - Zoning review11 133597 LPRClosedFeb 25, 2011 · 878 YONGE ST
- Building permit09 147883Closed
Proposal to install backflow prevention device
Jun 15, 2009 · 878 YONGE ST - Zoning review08 174418 LPRClosedJun 24, 2008 · 878 YONGE ST
- Building permit07 231247Closed - Dormant
Add 4 floors to existing 4 storey building for office and residential
Nov 22, 2007 · 878 YONGE ST - Zoning review07 211271 ZPRClosedMay 14, 2007 · 878 YONGE ST
- Building permit05 165712Closed
Make interior alterations to restaurant for condominium sales office with model suite; enclose stair to basement; close 2 openings on north ground floor exterior elevation; close & relocate door opening at east ground floor exterior elevation to north elevation.
Aug 10, 2005 · 878 YONGE ST - Building permit04 199660Closed
Revision to BP#04199660, change seating and add washroom in the basement.
Feb 2, 2005 · 878 YONGE ST - Minor varianceA0586/03TEYApproved
The site is located at the southwest corner of Scollard and Yonge Streets and is occupied by a four-storey building containing a retail store at grade with offices above. The applicant is seeking relief from the provisions of the Zoning By-law and Site Specific By-law No. 667-83 to make alterations to the building and to construct a four-storey addition over the existing building. The lower two floors of the addition will be for office use, while the upper two storeys would be used as a residential unit. The existing gross floor area of the building is approximately 753.47 square metres, while the proposed will be approximately 1,371.71 square metres.
Feb 4, 2004 · 878 YONGE ST - Zoning review03 197733 ZPRClosedDec 3, 2003 · 878 YONGE ST
- Zoning review03 197444 PSPClosedDec 2, 2003 · 878 YONGE ST
- Zoning review03 164987 ZPRClosedAug 11, 2003 · 878 YONGE ST
- Zoning review02 123109 ZPRClosedApr 3, 2002 · 878 YONGE ST
- Zoning review01 012606 LTOClosedApr 26, 2001 · 878 YONGE ST
- Building permit99 019342Closed
INSTALL 1 W.C.,1 W.B., 1 URINAL IN BASEMENT. SEE BP# 423465
Jul 21, 1999 · 878 YONGE ST - Building permit99 018842Closed
INSTALL FIXTURES BASEMENT FL 1 W.C., 1 W.B., 1ST FL 2 DISHWASHER 2-2 CPT.K.S., 2 W.B., 1 W.C., 2 COFFEE MACHINE IN CONNECTION WITH 423465 SS
Jul 12, 1999 · 878 YONGE ST - Building permit99 014369Closed
MAKE INTERIOR ALTERATIONS TO 1ST FLOOR FOR RESTAURANT PURPOSES, ALSO ALTER NORTH ELEVATION BY INSTALL OVERHEAD DOORS. HOLD FOR SURVEY, HEALTH APPROVAL. FEE$ 642.66
May 25, 1999 · 878 YONGE ST
Check before you build
Site-specific exception 900.11.10(324)
Needs a closer look23 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On lands municipally known as 3-11 Scollard Street and 874-878 Yonge Street in the year 2020, if the requirements of Section 5. and Schedule A of By-law 697-2021(OLT) are complied with, buildings and structures may be constructed, enlarged, or used on the lands identified on Diagram 1 of By-law 697-2021(OLT) in compliance with
- Rule B
to (W) below; (B) Despite regulation 40.10.40.40(1), the permitted maximum total gross floor area of the building is 20,600 square metres, of which a minimum of 70 square metres must be available for non-residential uses
- Rule C
In addition to the provisions of regulation 40.5.40.40(3) and for the purposes of regulation 200.5.1.10(11), the gross floor area of a mixed use building is also reduced by: (i) Below finished ground level, the area occupied by any main walls and interior building walls
- Rule D
Despite regulation 40.10.40.1(1), dwelling units must be located above the first storey of a building
- Rule E
Despite regulations 40.10.40.70(1) and 600.10.10, the required minimum building setbacks above finished ground are shown on Diagrams 3A and 3B of By-law 697-2021(OLT)
- Rule F
Despite regulations 5.10.40.70(1) and (2), 40.5.40.70(1), clause 40.10.40.60 and (E) above, the following encroachments are permitted into the required minimum building setbacks shown on Diagrams 3A and 3B of By-law 697-2021(OLT): (i) Lighting fixtures, excluding air craft warning lights, cornices, sills, eaves, architectural or ornamental features, structural elements including columns and structural slabs, to a maximum of 0.5 metres into a required building setback , provided such encroachments are no higher than the roof of that portion of the building to which such encroachments are attached; (ii) Canopies or awnings, including supporting structures , to a maximum of 1.5 metres into a required building setback , provided the height of such encroachments is no more than 4.0 metres above ground; (iii) planters, retaining walls, bollards, gas meters, wheel chair ramps, public art, guardrails, railings, and landscape features, provided the height of such encroachments is no more than 2.0 metres above ground; and (iv) Structures and elements permitted by (J) below, to a maximum projection of 7.4 metres into a required building setback
- Rule G
Balconies are permitted provided such balconies comply with the minimum building setbacks shown on Diagrams 3A and 3B of By-law 697-2021(OLT), subject to encroachments permitted in (F) above
- Rule H
Despite regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 116.0 metres and the highest point of the building or structure
- Rule I
Despite regulation 40.10.40.10(1), no portion of a building or structure erected on the lands above ground may exceed the maximum permitted building heights in metres specified by the numbers following the HT symbol as shown on Diagrams 3A and 3B of By-law 697-2021(OLT)
- Rule J
Despite Regulations 40.5.40.10(3), (4), (5), (6), (7), and (8) and (I) above, the following may project above the permitted maximum building heights shown on Diagrams 3A and 3B of By-law 697-2021(OLT): (i) elements of a green roof and parapets to a maximum of 2.0 metres above the maximum permitted building height; (ii) window washing equipment to a maximum of 2.5 metres above the maximum permitted building height ; (iii) Elements or structures on any portion of a roof used for outside or open air recreation, including required residential amenity space , terraces, screens, to a maximum of 3.0 metres above the maximum permitted building height; (iv) chimneys, vents, air craft warning lights, stacks and structures for wind protection; and (v) Structures or elements permitted by (F) above
- Rule K
For the purpose of this Exception, the term " established grade " is the Canadian Geodetic Datum elevation of 116.0 metres
- Rule L
Regulations 200.5.1(3), 200.5.1.10 (5), (10) and (13), 200.10.1(1) and (2), 200.15.1(3) and (4), and 200.15.15.4(2) do not apply if resident or visitor parking spaces are provided in an "automated parking garage"
- Rule M
Despite regulations 200.5.1.10(2) and (6), 200.10.1(3), 200.15.1(1), 200.15.15.4(1) a parking space or an accessible parking space provided on a parking pallet within an "automated parking garage" is subject only to the following minimum dimensions: (i) width of 2.1 metres; and (ii) length of 5.4 metres
- Rule N
If parking spaces are provided within an "automated parking garage", the requirement to provide accessible parking spaces set out in regulations 200.15.10(1) and 200.15.15.4(3) is satisfied with the provision of parking spaces provided in accordance with (M) above
- Rule O
Despite 40.10.100.10(1)(C), a maximum of two vehicle accesses are permitted
- Rule P
Despite regulations 230.5.1.10(4)(A)(ii) and (B)(ii), the width of a bicycle parking space must be a minimum of 0.35 metres
- Rule Q
In addition to the provisions of regulation 230.5.1.10(9)(B), a "long-term" bicycle parking space may also be located on the third storey of the building
- Rule R
Despite regulation 230.5.1.10(10), a "long-term" bicycle parking space and a "short-term" bicycle parking space may be located in a stacked bicycle parking space
- Rule S
Regulation 230.40.1.20(2) does not apply to a "short-term" bicycle parking space located in a building
- Rule T
For the purpose of this Exception, an "automated parking garage" means a mechanical system for the purpose of parking and retrieving vehicles without drivers in the vehicle during parking and without the use of ramps or drive aisles, and which may include but is not limited to, a vertical lift and the storage of vehicles on parking pallets
- Rule U
Regulation 40.10.40.50(2) does not apply with respect to amenity space for buildings with non-residential uses
- Rule V
Section 600.20 with respect to Priority Retail Streets does not apply
- Rule W
Despite any existing or future severance, partition or division of the lands shown on Diagram 1 of By-law 697-2021(OLT), the provisions of this Exception and By-law 569-2013, as amended, apply to the whole of the lands as one lot as if no severance, partition or division had occurred.
Lot facts
- Area
- 156 m²
- Frontage
- 5.4 m
- Depth
- 29.3 m
- Street
- Yonge St
- Corner lot
- Yes, also on Scollard St29.3 m along it
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- 18 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 211, 225. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.0 (c2.5; r3.0) SS1 (x324) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%26 of 26 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 38
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 26 variance decisions: more than at 58% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.
1235 BAY ST · Oct 14, 2026 · 226 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).
131 DAVENPORT RD · Oct 7, 2026 · 454 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.
874 YONGE ST · Aug 5, 2026 · 12 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 151 m away - Minor varianceApproved
To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.
106 SCOLLARD ST · Jun 10, 2026 · 356 m away
Latest activity nearby
- Zoning review
Application Acceptable
12 CUMBERLAND ST · Nov 24, 2026 · 157 m away - Building permit
1 wall sign + 1 projecting sign***HELLO NORI***
1250 BAY ST · Nov 24, 2026 · 270 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.
40 ASQUITH AVE · Nov 20, 2026 · 239 m away - Building permit
6 overhanging structure signs**AEVUM**
11 YORKVILLE AVE · Nov 19, 2026 · 107 m away - Building permit
Proposal for new Sprinklers System on the 3rd floor public corridor.
60 BLOOR ST W · Nov 19, 2026 · 289 m away - Building permit
Proposed interior alterations to an existing office
2 BLOOR ST E · Nov 18, 2026 · 284 m away - Building permit
Proposal for interior alterations to an existing office.
2 BLOOR ST E · Nov 17, 2026 · 284 m away - Building permit
INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802
50 YORKVILLE AVE · Nov 16, 2026 · 130 m away - Zoning review
Not Started
12 CUMBERLAND ST · Nov 12, 2026 · 157 m away - Building permit
Proposal for ground floor sprinkler alteration for the bicycle storage and associated office/corridor
877 YONGE ST · Nov 10, 2026 · 190 m away
Neighbourhood: Annex
About the area around the lot, not the lot itself.
- Nearest station
- Yonge Station3 min walk
- Nearest TTC stop
- Yonge St at Scollard St1 min walk
- Nearest cycling route
- Yonge StCycle Track, 1 min walk
- Nearest traffic count
- 10,037 vehicles in 8 hYonge St / Scollard St, 30 m away, Jun 16, 2003
- Serious collisions within 500 m
- 82021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 3 with cyclists
- Parks
- Frank Stollery Parkette1 min walk
- Town Hall Square1 min walk
- Harold Town Park2 min walk
Schools within 1 km
- MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 3 min walk
- JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 5 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 7 min walk
- CAREER QUEST - TORONTO Private 8 min walk
- ROSEDALE DAY SCHOOL Private 9 min walk
- BRANKSOME HALL GIRLS SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Annex | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $85,000 | $84,500 |
| Households that own their home | 41% | 54% |
| Population (2021) | 29,300 | 16,813 |
| Homes built in 1960 or before | 40% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Annex | City median |
|---|---|---|
| Assault | 1080.9 | 636.3 |
| Robbery | 80.5 | 69.5 |
| Homicide | 5.2 | 5.3 |
| Shootings | 5.2 | 10.5 |
| Auto theft | 116.9 | 192.6 |
| Theft over $5,000 | 114.3 | 46.1 |
| Break and enter | 387.1 | 172.8 |
| Theft from vehicles | 220.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.