HousePrecheckCheck an address

875 Morningside AveToronto · zoning, lot size and permit records

≈ 173.0 × 259.0 m28,698 m²on Tams Rdcorner, also on Morningside Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 235104 (Install electromagnetic locking devices (maglocks) on 4-double doors separating the new..., 2026); 26 210716 (Demolition of existing change room interior walls and renovation of the area to accommo..., 2026); 26 152156 (Proposed interior alterations to existing Assembly (Sports Centre)Structural interior a..., 2026); and 2 more. Larger work can mean noise and trucks next door; read what each one is for.
N50 m
≈ 173.0 m frontage≈ 259.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2019

    Needs a closer look

    Still open in the City's records: 20 164999 (install 1 maglock between pool & dryland training room, revise door hardware & access r..., 2020, status Inspection); 19 140070 (interior alterations to multi purpose room, former doping control room, 2019, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (2% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 235104 (Install electromagnetic locking devices (maglocks) on 4-double doors separating the new..., 2026); 26 210716 (Demolition of existing change room interior walls and renovation of the area to accommo..., 2026); 26 152156 (Proposed interior alterations to existing Assembly (Sports Centre)Structural interior a..., 2026); and 2 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 235104Permit Issued

    Install electromagnetic locking devices (maglocks) on 4-double doors separating the new Academy Room from the Male and Female Change Rooms (two new double doors and two existing doors)

    Oct 8, 2026 · 875 MORNINGSIDE AVE
  • Building permit26 210716Inspection

    Demolition of existing change room interior walls and renovation of the area to accommodate new squad rack and fitness area - Panam Sports Centre

    Sep 3, 2026 · 875 MORNINGSIDE AVE
  • Building permit26 152156Inspection

    Proposed interior alterations to existing Assembly (Sports Centre)Structural interior alterations to install a new W-beam and lateral bracing to support a proposed foldable partition wall, including associated Level 3(sector 6) ceiling work and Level 2(sector 7) wall demolition.

    Jul 8, 2026 · 875 MORNINGSIDE AVE
  • Building permit26 170035Inspection

    Proposed interior alterations to existing Tim Hortons restaurant.

    Jun 19, 2026 · 875 MORNINGSIDE AVE
  • Building permit26 166726Cancelled

    Proposal fo interior demolition and construction of new 190 mm CMU wall on slab thickening.Installation of new double door in new wall openings. (Aquatic/Sports Centre)

    May 25, 2026 · 875 MORNINGSIDE AVE
  • Zoning review22 152202 POZClosed
    Jun 7, 2022 · 875 MORNINGSIDE AVE
  • Development application22 152202 ESC 25 OZClosed

    OPA and Rezoning for proposed 6-storey, 15, 117m2 institutional building, known as the Scarborough Academy of Medicine and Integrated Health ("SAMIH")

    May 26, 2022 · 875 MORNINGSIDE AVE · City file
  • Building permit20 164999Inspection

    install 1 maglock between pool & dryland training room, revise door hardware & access readers

    Oct 2, 2020 · 875 MORNINGSIDE AVE
Show 15 older records
  • Building permit19 140070Permit Issued

    interior alterations to multi purpose room, former doping control room

    May 1, 2019 · 875 MORNINGSIDE AVE
  • Development application16 209876 ESC 44 OZUnder Review

    Official Plan Amendment application to adopt a Secondary Plan for the University of Toronto Scarborough Campus.

    Aug 19, 2016 · 875 MORNINGSIDE AVE · City file
  • Building permit15 123929Closed

    Proposal to erect 2 temporary tents for Modern Pentathlon.. PAN AM Games. PAC. May15-Sept15/2015.

    May 19, 2015 · 875 MORNINGSIDE AVE
  • Building permit14 265227Closed

    Proposal to erect temporary bleacher for Roller Sports and Speed Skating. Pentathlon & Roller Sports PAN AM Games. April 1 - Sept 30/2015.

    May 14, 2015 · 875 MORNINGSIDE AVE
  • Building permit15 124751Closed

    Proposal for 2 temporary trailers for Ticket Box Offices - Aquatics. PAN AM Games. May 15 - Sept 15/2015.

    May 12, 2015 · 875 MORNINGSIDE AVE
  • Building permit15 123914Closed

    Proposal to erect 4 temporary tents for Aquatics. PAN AM Games. PAC. May15-Sept11/2015.

    Mar 20, 2015 · 875 MORNINGSIDE AVE
  • Building permit14 265204Closed

    Proposal to erect 2 temporary bleachers and fencing for Synchronized Swimming at the Aquatics Centre & Field Hockey House. PAN AM Games. May 1 - Sept 30/2015.

    Mar 18, 2015 · 875 MORNINGSIDE AVE
  • Development application15 128776 ESC 44 SAClosed

    Temporary installation for Modern Pentathalon event for the 2015 Pan Am Games. The proposal includes an asphalt track, temporary fencing, tents with a total area of 600 m2, trailers, seating bleachers for 944 seats and shipping containers. All components are intended to be removed by September 30, 2015.

    Mar 17, 2015 · 875 MORNINGSIDE AVE
  • Building permit15 107582Closed

    demolish non-structural wall at pool level, remove glass wall on 2nd floor pool gallery for broadcasting coverage for PAN AM aquatic centre

    Mar 2, 2015 · 875 MORNINGSIDE AVE
  • Building permit14 164820Closed

    To erect and display two non-illuminated overhanging structure signs and twelve ground signs including 10 directional and two illuminated. **Panam Sports Complex**

    Jul 10, 2014 · 875 MORNINGSIDE AVE
  • Building permit14 144837Closed

    To erect and display three overhanging structure signs on the north, south and east elevations. ** Toronto Pan Am Sports Centre **

    Apr 30, 2014 · 875 MORNINGSIDE AVE
  • Building permit14 123382Closed

    To erect and display three wall signs on the west elevation, one illuminated channel letters and two illuminated logo-style wall signs. **Pan Am Sports Centre**

    Mar 5, 2014 · 875 MORNINGSIDE AVE
  • Zoning review14 123380 ZSVClosed
    Mar 1, 2014 · 875 MORNINGSIDE AVE
  • Zoning review14 109120 ZPRClosed
    Jan 24, 2014 · 875 MORNINGSIDE AVE
  • Development application10 174838 ESC 44 OZClosed

    REVISED SUBMISSION: University of Toronto - City of Toronto Aquatic Centre (Pan Am Games). This will be a shared facility between the University and City, and will be the Aquatic Centre for the Pam Am and Para-Pan Games taking place in the summer of 2015. The building is to be situated in part on the U of T's Scarborough Campus lands and in part on City of Toronto lands, the total site area is approximately 6.7 ha. This jointly owned facility will be approximately 37,000 m2 in size will include two 50 m swimming pools and dive tank, athletic facilities including a gymnasium, indoor track, a fitness centre and other minor athletic facilities. It will also include ancillary offices as well as facilities for the Canadian Sports Institute of Ontario (CSIO). The proposed building height ranges between 30 and 35 m.

    May 13, 2010 · 875 MORNINGSIDE AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
28,698 m²
Frontage
173 mestimated, irregular lot
Depth
259 mestimated, irregular lot
Street
Tams Rd
Corner lot
Yes, also on Morningside Ave259 m along it
Public lane
None
House footprint
8,988 m²roof up to 29.2 m
Back yard
16.1 mhouse to rear lot line
Side yards
8.4 m and 15.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit building retrofits including: exterior envelope work, interior common/amenity space accessibility upgrades and renovations, exterior accessibility upgrades to circulation routes, drop-off and parking, mechanical and electrical systems upgrades.

      90 MORNELLE CRT · Jan 13, 2022 · 442 m away
    • Minor varianceApproved

      The purpose of this minor variance application is to obtain a temporary reduction in the number of required parking spaces for the University of Toronto, Scarborough Campus (UTSC).

      1050 MILITARY TRL · Mar 11, 2021 · 439 m away
    • Minor varianceApproved

      The 12 storey apartment building currently has 165 residential units. The applicant is proposing to convert the existing basement lockers/storage space into 9 new residential units. A new recreation room is also proposed in the basement.

      750 MORNINGSIDE AVE · Nov 20, 2014 · 374 m away
    • Minor varianceApproved

      The applicant proposes to complete construction of a two-storey semi-detached dwelling.

      10 SCHMIRLER TER · Mar 10, 2004 · 249 m away
    • Minor varianceApproved

      The applicant proposes to complete construction of a two-storey semi-detached dwelling.

      26 SCHMIRLER TER · Mar 10, 2004 · 189 m away

    Latest activity nearby

    • Zoning review

      Not Started

      840 MILITARY TRL · Nov 6, 2026 · 241 m away
    • Building permit

      To erect and display two illuminated wall sign***POPEYES ****

      790 MILITARY TRL · Oct 23, 2026 · 185 m away
    • Building permit

      Install electromagnetic locking devices (maglocks) on 4-double doors separating the new Academy Room from the Male and Female Change Rooms (two new double doors and two existing doors)

      875 MORNINGSIDE AVE · Oct 8, 2026 · 69 m away
    • Building permit

      Demolition of existing change room interior walls and renovation of the area to accommodate new squad rack and fitness area - Panam Sports Centre

      875 MORNINGSIDE AVE · Sep 3, 2026 · 69 m away
    • Zoning review

      Closed

      790 MILITARY TRL · Aug 25, 2026 · 185 m away
    • Zoning review

      Closed

      790 MILITARY TRL · Jul 20, 2026 · 185 m away
    • Building permit

      To erect and display two illuminated wall sign***POPEYES ****

      790 MILITARY TRL · Jul 14, 2026 · 185 m away
    • Building permit

      Proposed interior alterations to existing Assembly (Sports Centre)Structural interior alterations to install a new W-beam and lateral bracing to support a proposed foldable partition wall, including associated Level 3(sector 6) ceiling work and Level 2(sector 7) wall demolition.

      875 MORNINGSIDE AVE · Jul 8, 2026 · 69 m away
    • Building permit

      Proposed interior alterations to existing Tim Hortons restaurant.

      875 MORNINGSIDE AVE · Jun 19, 2026 · 69 m away
    • Building permit

      Rebuilding of rear attached deck

      204 BONSPIEL DR · Jun 9, 2026 · 144 m away

    Neighbourhood: Highland Creek

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Morningside Ave at Tams Rd3 min walk
    Nearest cycling route
    The MeadowayMulti-Use Trail, 6 min walk
    Nearest traffic count
    14,990 vehicles in 8 hMorningside Ave / Tams Rd / Pan Am Dr, 140 m away, Dec 10, 2023
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Bonspiel Park5 min walk
    Ellesmere Ravine Park10 min walk
    Morningside Park12 min walk

    Schools within 1 km

    • MILITARY TRAIL PUBLIC SCHOOL English Public 6 min walk
    • ST JOHN PAUL II CATHOLIC SECONDARY SCHOOL English Separate 7 min walk
    • CENTENNIAL COLLEGE SCHOOL - MORNINGSIDE CAMPUS College 10 min walk
    • ROUGE VALLEY EDUCATION CENTRE Private 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHighland CreekMedian neighbourhood
    Median household income (2020)$120,000$84,500
    Households that own their home86%54%
    Population (2021)12,62516,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHighland CreekCity median
    Assault575.6636.3
    Robbery44.369.5
    Homicide7.45.3
    Shootings7.410.5
    Auto theft243.5192.6
    Theft over $5,00095.946.1
    Break and enter118.1172.8
    Theft from vehicles214188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.