Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2007
Needs a closer lookStill open in the City's records: 20 152700 (Proposal for civil works improvements in an existing park - PF&R Capital Works Project..., 2020, status Permit Issued); 07 111246 (Construct accessory building (composting toilet), 2007, status Work Not Started).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- By-law investigation25 231852 WST 00 IRClosed
Waste
Sep 28, 2025 · 875 DUFFERIN ST - Building permit23 207841Closed
Proposal to erect one 20 x 40 canopy / tent for temporary shelter for the Native Child and Family Services of Toronto's community Pow Wow. Fire-rated shelter, secured with cement bases, installed by Gervais Rental Inc. Set up on Saturday September 30 at 7am, take down 7pm.
Sep 29, 2023 · 875 DUFFERIN ST - Building permit20 152651Closed
HVAC - Proposal to renovate the existing park club house, work includes upgrade the building envelope, with new plumbing and mechanical systems. -PF&R Capital Works Project for Dufferin Grove Park
Aug 31, 2020 · 875 DUFFERIN ST - Building permit20 152672Closed
Proposal to construct a new single storey garage for zamboni storage, with a green roof. -PF&R Capital Works Project for Dufferin Grove Park
Aug 17, 2020 · 875 DUFFERIN ST - Building permit20 152700Permit Issued
Proposal for civil works improvements in an existing park - PF&R Capital Works Project for Dufferin Grove Park
Aug 14, 2020 · 875 DUFFERIN ST - Building permit07 111246Work Not Started
Construct accessory building (composting toilet).
Aug 16, 2007 · 875 DUFFERIN ST - Building permit04 174096Closed
To erect and dismantle 2 tents on 9/18/04 for Chruch of Scientology. 1 tent 16 x 16 and the other is approximately 28 x 32.
Sep 16, 2004 · 875 DUFFERIN ST
Lot facts
- Area
- 53,286 m²
- Frontage
- 230.9 m
- Depth
- 267.6 m
- Street
- Dufferin Park Ave
- Corner lot
- Yes, also on Dufferin St267.6 m along it
- Public lane
- Ln N Sylvan E Gladstone, 76.2 m along it
- House footprint
- 366 m²roof up to 9.1 m
- Back yard
- 227.3 mhouse to rear lot line
- Side yards
- 35.9 m and 184.2 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 81%22 of 27 decisions
- Garden suite permits
- 3
- Laneway suite permits
- 5
- Multiplex permits
- 8
- Development applications
- 3
Within 300 m, last 10 years. 16 suite and multiplex permits: more than at 84% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal for interior alterations to main floor and third floor.
37 HAVELOCK ST · Nov 24, 2026 · 287 m away - Building permit
Proposal to construct a single car (detached) carport 5.65m (width) x 9.40m (depth) = 50.80 sqm with a overhead garage door installed on the front (west) side.
263 RUSHOLME RD · Nov 17, 2026 · 279 m away - Building permit
Proposed alterations and three storey rear addition to existing two-and-a-half storey dwelling.
118 HAVELOCK ST · Nov 12, 2026 · 135 m away - Building permit
Rev 01: Changed from a new riser for the lobby/gym sprinklers to altering the existing and upsizing. Proposal for new sprinkler system in existing lobby.
919 DUFFERIN ST · Nov 3, 2026 · 198 m away - Zoning review
Closed
900 DUFFERIN ST · Oct 14, 2026 · 244 m away - Building permit
Proposal for as-built third-floor unconditioned service room and exterior steel stair; structural revisions and new piers.
217 RUSHOLME RD · Sep 30, 2026 · 278 m away - Building permit
Proposal for the reconstruction of existing rear addition and second floor deck. No changes made to the building footprint.
110 HAVELOCK ST · Sep 24, 2026 · 159 m away - Building permit
Proposed Commercial Kitchen Ventilation and Fire Suppression Systems. - Unit 0078 - Pizza Pizza
900 DUFFERIN ST · Sep 15, 2026 · 244 m away - Building permit
Proposed covered front porch on existing residence (front yard)
206 RUSHOLME RD · Sep 14, 2026 · 229 m away - Building permit
1 wall sign.***CANADIAN BLOOD SERVICE***
900 DUFFERIN ST · Sep 10, 2026 · 244 m away
Neighbourhood: Dufferin Grove
About the area around the lot, not the lot itself.
- Nearest station
- Dufferin Station9 min walk
- Nearest TTC stop
- Dufferin Mall2 min walk
- Nearest cycling route
- Dufferin Grove Park TrlMulti-Use Trail - Existing Connector, 1 min walk
- Nearest traffic count
- 435 vehicles in 14 hGladstone Ave / Sylvan Ave / Dufferin Grove Park Trl, 150 m away, Jun 25, 2024
- Serious collisions within 500 m
- 82021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
- Parks
- Dufferin Grove Park1 min walk
- Salem Parkette9 min walk
- Westmoreland Avenue Parkette10 min walk
Schools within 1 km
- ST MARY CATHOLIC ACADEMY SECONDARY SCHOOL English Separate 3 min walk
- BLOOR C.I. & ALPHA II ALTERNATIVE English Public 8 min walk
- ST HELEN CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
- BROCK JR PUBLIC SCHOOL English Public 9 min walk
- DEWSON STREET JR PUBLIC SCHOOL English Public 11 min walk
- THE ORCHARD MONTESSORI SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Dufferin Grove | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $78,000 | $84,500 |
| Households that own their home | 42% | 54% |
| Population (2021) | 11,215 | 16,813 |
| Homes built in 1960 or before | 56% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Dufferin Grove | City median |
|---|---|---|
| Assault | 1224.5 | 636.3 |
| Robbery | 111.3 | 69.5 |
| Auto theft | 111.3 | 192.6 |
| Theft over $5,000 | 87.5 | 46.1 |
| Break and enter | 270.3 | 172.8 |
| Theft from vehicles | 278.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.