HousePrecheckCheck an address

868 Lawrence Ave EToronto · zoning, lot size and permit records

Residential multiple · RM (f21.0; a835; d1.0)≈ 44.6 × 81.8 m2,505 m²on Tremont Crescorner, also on Lawrence Ave E

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 31 rental units, built 1954More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • City upkeep score: 78 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 44.6 m frontage≈ 81.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 240810 PRS 00 IR (Property Standards, 2026); 26 240171 PRS 00 IV (Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 m..., 2026); 26 240165 PRS 00 IR (Property Standards, 2026); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 78 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 31 units, built 1954).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 240810 PRS 00 IRClosed

    Property Standards

    Sep 21, 2026 · 868 LAWRENCE AVE E
  • By-law investigation26 240171 PRS 00 IVClosed

    Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 millimetres above grade opens within 1,500 millimetres of the floor not leading to a balcony does not emplo

    Sep 18, 2026 · 868 LAWRENCE AVE E
  • By-law investigation26 240165 PRS 00 IRClosed

    Property Standards

    Sep 18, 2026 · 868 LAWRENCE AVE E
  • By-law investigation26 170614 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 868 LAWRENCE AVE E
  • By-law investigation26 170613 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 868 LAWRENCE AVE E
  • By-law investigation25 105689 PRS 00 IRClosed

    Property Standards

    Jan 16, 2025 · 868 LAWRENCE AVE E
  • Building permit24 132467Closed

    Proposed domestic water piping replacement to apartment building throughout.

    Apr 19, 2024 · 868 LAWRENCE AVE E
  • Building permit17 239216Closed

    Backflow Prevention Devices.

    Oct 19, 2017 · 868 LAWRENCE AVE E
Show 3 older records
  • Building permit02 120720Closed - Dormant

    BALCONY CONCRETE REPAIR AND GUARDRAIL REPLACEMENT TO A 3 STOREY APARTMENT BUILDING.

    Jun 19, 2002 · 868 LAWRENCE AVE E
  • Building permit01 124820Closed

    INSTALL NEW CATCHBASIN AND 8" STORM SEWER, 2 MH

    Jul 17, 2001 · 868 LAWRENCE AVE E
  • Building permit94 251057Closed - Dormant

    FIRE ALARM

    May 10, 1995 · 868 LAWRENCE AVE E

Lot facts

Area
2,505 m²
Frontage
44.6 mestimated, irregular lot
Depth
81.8 mestimated, irregular lot
Street
Tremont Cres
Corner lot
Yes, also on Lawrence Ave E81.8 m along it
Public lane
None
House footprint
696 m²roof up to 14 m
Back yard
16.4 mhouse to rear lot line
Side yards
4.4 m and 19.9 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Central Don Mills Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 21 m. Frontage is about 44.6 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 835 m². Lot area is 2,505 m²: meets the minimum. Source
  • Zone RM (f21.0; a835; d1.0) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 23 City trees in front of this lot. The City's street tree inventory lists 23 trees at this address: elm, chinese (42 cm), elm, chinese (38 cm), elm, chinese (36 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%24 of 28 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached by constructing a covered porch.

    20 LANGBOURNE PL · Sep 11, 2025 · 261 m away
  • Minor varianceApproved

    To construct a one storey front addition, carport and a two-storey rear addition. Also to construct a rear yard deck.

    14 LANGBOURNE PL · Mar 8, 2022 · 263 m away
  • Minor varianceApproved

    Proposal for a 1 storey front and side addition and 2 storey rear addition to the existing semi-detached dwelling.

    42 LANGBOURNE PL · Jan 28, 2021 · 302 m away
  • Minor varianceApproved

    To construct two 11-storey towers connected by a 4-storey podium with 296 residential units and 1 retail unit.

    99 THE DONWAY W · Feb 5, 2014 · 388 m away
  • Minor varianceApproved

    The applicant is proposing to construct a one storey addition to the rear west portion of the existing two storey semi-detached dwelling. The applicant is also proposing the construction of a one storey attached carport to the north portion of the semi-detached dwelling.

    31 VEERY PL · Jul 4, 2012 · 488 m away

Latest activity nearby

  • Building permit

    Proposal to construct a new cabana in rear yard and update rear yard landscape.

    62 NORDEN CRES · Nov 20, 2026 · 269 m away
  • Building permit

    Proposal to install a flat roof mounted Solar PV System.

    20 SANDERLING PL · Nov 13, 2026 · 264 m away
  • Building permit

    Backwater Valve installation

    11 TREMONT CRES · Nov 5, 2026 · 204 m away
  • Building permit

    Structural snow damage restoration.

    63 PAPERBIRCH DR · Oct 29, 2026 · 235 m away
  • Building permit

    REVISION-01Proposal for a one storey rear addition, partial 2nd floor addition, and interior alterations to the existing SFD-detached dwelling.See also 25 226732 ZAP and 25 270398 MV

    20 PAPERBIRCH DR · Oct 21, 2026 · 257 m away
  • Zoning review

    Closed

    45 NORDEN CRES · Aug 27, 2026 · 283 m away
  • Building permit

    Interior & Exterior sanitary line replacement. 4" clay to 4" PVC. Install back water valve

    55 JOCELYN CRES · Aug 14, 2026 · 185 m away
  • Zoning review

    Closed

    170 THE DONWAY W · Apr 20, 2026 · 215 m away
  • Zoning review

    Closed

    895 LAWRENCE AVE E · Apr 9, 2026 · 249 m away
  • Building permit

    Proposed unheated covered porch addition in front yard and front entrance way to primary dwelling.

    20 LANGBOURNE PL · Apr 2, 2026 · 261 m away

Neighbourhood: Banbury-Don Mills

About the area around the lot, not the lot itself.

Nearest station
Don Valley Station31 min walk
Nearest TTC stop
Lawrence Ave East at Tremont Cres (East) West Side1 min walk
Nearest cycling route
Duncairn Park TrlMulti-Use Trail - Entrance, 4 min walk
Nearest traffic count
23,065 vehicles in 14 hLawrence Ave E / Tremont Cres (East), 50 m away, May 5, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Paperbirch Walkway1 min walk
Duncairn Park4 min walk
Don Mills Trail4 min walk

Schools within 1 km

  • NORMAN INGRAM PUBLIC SCHOOL English Public 7 min walk
  • OVERLAND LEARNING CENTRE English Public 8 min walk
  • SENECA HILL PRIVATE SCHOOL Private 8 min walk
  • ST BONAVENTURE CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • DON MILLS MDL SCHOOL English Public 14 min walk
  • DON MILLS COLLEGIATE INSTITUTE English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBanbury-Don MillsMedian neighbourhood
Median household income (2020)$91,000$84,500
Households that own their home60%54%
Population (2021)27,15516,813
Homes built in 1960 or before24%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBanbury-Don MillsCity median
Assault404.9636.3
Robbery101.269.5
Shootings9.210.5
Auto theft220.9192.6
Theft over $5,00067.546.1
Break and enter248.5172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.