HousePrecheckCheck an address

850 York Mills RdToronto · zoning, lot size and permit records

64.3 × 109.4 m7,033 m²on York Mills Rd

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 18 270588 NNY 16 SA (INACTIVE 9 storey non-residential mixed use building consisting of retail uses on the g..., 2018). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 9 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
64.3 m frontage109.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 18 270588 NNY 16 SA (INACTIVE 9 storey non-residential mixed use building consisting of retail uses on the g..., 2018).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Zoning review18 270584 POZClosed
    Jul 29, 2020 · 850 YORK MILLS RD
  • Development application18 270588 NNY 16 SAUnder Review

    INACTIVE 9 storey non-residential mixed use building consisting of retail uses on the ground floor, offices uses and self-storage uses throughout the building and two levels of underground parking. A total of 699 parking spaces and 7 loading spaces will be provided. Vehicular access is proposed along Lesmill Rd which will facilitate access to the property and the loading area and another vehicular access will provide access to the York Mills Rd underpass.

    Dec 20, 2018 · 850 YORK MILLS RD · City file
  • Development application18 270584 NNY 16 OZClosed

    8 storey non-residential mixed use building consisting of retail uses on the ground floor, and offices uses and self-storage uses throughout the building above the ground floor. The site will be serviced by two levels of underground parking. Vehicular access is proposed along Lesmill Rd which will facilitate access to the property and the loading area and another vehicular access will provide access to the York Mills Rd underpass.

    Dec 20, 2018 · 850 YORK MILLS RD · City file
  • Zoning review12 293607 PSPClosed
    Dec 13, 2012 · 850 YORK MILLS RD
  • Development application12 290298 NNY 34 SAClosed

    Proposal is for a 2 storey commercial building with a GFA of 11,254 square metres. Proposed uses include retail, restaurant, financial institution, banks, medical offices and educational uses. Parking is to be surface and underground parking.

    Dec 6, 2012 · 850 YORK MILLS RD
  • Zoning review11 213294 POZClosed
    Jun 8, 2011 · 850 YORK MILLS RD
  • Development application11 204049 NNY 34 OZClosed

    Revised proposal is for a 2 storey commercial building with a GFA of 11,254 square metres. Proposed uses include retail, restaurant, financial institution, banks, medical offices and educational uses. Parking is to be surface and underground parking.

    May 27, 2011 · 850 YORK MILLS RD
  • Zoning review09 125407 ZPRClosed
    Apr 9, 2009 · 850 YORK MILLS RD
Show 1 older records
  • Building permit02 128344Closeddemolition

    TO DEMOLISH THE EXISTING ONE STOREY WAREHOUSE.

    Jun 12, 2002 · 850 YORK MILLS RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,033 m²
Frontage
64.3 m
Depth
109.4 m
Street
York Mills Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    3

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a deficiency in the number of parking spaces required for the proposed medical office.

      41 LESMILL RD · Sep 17, 2026 · 346 m away
    • Minor varianceApproved

      The proposal involves interior renovations only to existing office space on Level 2 to accommodate Medical Office Use. There is no addition, no modification to the exterior. and the existing parking supply remains unchanged.

      41 LESMILL RD · Feb 19, 2026 · 346 m away
    • Minor varianceApproved

      To permit the reduction of parking spaces provided and the relocation of the loading zone at the school and childcare facility. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 10, 2024.

      16 COLDWATER RD · Jul 24, 2025 · 437 m away
    • Minor varianceApproved

      To construct a new dwelling.

      27 HURLINGHAM CRES · Mar 8, 2022 · 464 m away
    • Minor varianceApproved

      Proposal to increase the retail store use permitted within the existing commercial building.

      865 YORK MILLS RD · Sep 23, 2021 · 334 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alterations to an existing office.

      23 LESMILL RD · Nov 2, 2026 · 197 m away
    • Building permit

      Proposal for tenant fitout to create a Dance Studio (Fitness Centre). No changes to existing HVAC, Plumbing, Fire Saftey systems.

      25 LESMILL RD · Aug 17, 2026 · 251 m away
    • Building permit

      Proposal for interior alterations to exisitng office.

      25 LESMILL RD · Jul 8, 2026 · 251 m away
    • Zoning review

      Application On Hold

      861 YORK MILLS RD · Jun 15, 2026 · 209 m away
    • Zoning review

      Closed

      864 YORK MILLS RD · Mar 31, 2026 · 216 m away
    • Building permit

      Proposal to install a new backflow prevention device.

      855 YORK MILLS RD · Mar 25, 2026 · 126 m away
    • Building permit

      Proposal to install a backflow prevention device.

      862 YORK MILLS RD · Dec 15, 2025 · 188 m away
    • Building permit

      2 wall signs**Tim Hortons**

      860 YORK MILLS RD · Aug 19, 2025 · 148 m away
    • Building permit

      Proposal to construct alterations to existing exterior ramp, entrance doors and interior ramp to conform to latest accessibility requirements.

      857 YORK MILLS RD · Jul 28, 2025 · 217 m away
    • Building permit

      Proposal for fire alarm upgrade, add additional fire alarm annunciator at the main entrance

      853 YORK MILLS RD · Jul 23, 2025 · 154 m away

    Neighbourhood: St.Andrew-Windfields

    About the area around the lot, not the lot itself.

    Nearest station
    Walkway to Oriole GO Station23 min walk
    Nearest TTC stop
    York Mills Rd at Lesmill Rd West Side2 min walk
    Nearest cycling route
    York Mills RdBike Lane - Buffered, 1 min walk
    Nearest traffic count
    14,245 vehicles in 8 hLesmill Rd / York Mills Access Ramp / York Mills Rd, 130 m away, Dec 17, 2022
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Don Mills Trail4 min walk
    Kirkwood Park9 min walk
    Trca Lands ( 81)10 min walk

    Schools within 1 km

    • CENTRAL MONTESSORI SCHOOL - YORK MILLS Private 7 min walk
    • HAWTHORN SCHOOL FOR GIRLS Private 7 min walk
    • BAYVIEW GLEN PRIVATE SCHOOL Private 8 min walk
    • THE LAUREL SCHOOL Private 8 min walk
    • DON MILLS LINC English Public 8 min walk
    • HERITAGE INNOVATION SCHOOL Private 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt.Andrew-WindfieldsMedian neighbourhood
    Median household income (2020)$118,000$84,500
    Households that own their home64%54%
    Population (2021)16,96016,813
    Homes built in 1960 or before17%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt.Andrew-WindfieldsCity median
    Assault614.8636.3
    Robbery106.969.5
    Shootings5.310.5
    Auto theft203.2192.6
    Theft over $5,00042.846.1
    Break and enter384.9172.8
    Theft from vehicles219.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.