HousePrecheckCheck an address

85 The EsplanadeToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c0.5; r4.0) SS1 (x2365)≈ 28.6 × 75.5 m1,208 m²on Church Stcorner, also on The Esplanade

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 7 storeys, 128 rental units, built 1997More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 23 154107 (Replacement of four boilers (end of service life) to new high efficiency boilers replac..., 2023, status Permit Issued); 04 195628 (HVAC - Interior alterations to various portions of building for structural changes. - I..., 2004, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: KingThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 28.6 m frontage≈ 75.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2004

    Needs a closer look

    Still open in the City's records: 23 154107 (Replacement of four boilers (end of service life) to new high efficiency boilers replac..., 2023, status Permit Issued); 04 195628 (HVAC - Interior alterations to various portions of building for structural changes. - I..., 2004, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 25 214787 PRS 00 IR (Property Standards, 2025); 25 137298 ZON 00 IR (Zoning, 2025); 24 252969 ZON 00 IR (Zoning, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (7 storeys, 128 units, built 1997).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation25 214787 PRS 00 IRClosed

    Property Standards

    Aug 22, 2025 · 85 THE ESPLANADE
  • By-law investigation25 137298 ZON 00 IRClosed

    Zoning

    Mar 31, 2025 · 85 THE ESPLANADE
  • By-law investigation24 252969 ZON 00 IRClosed

    Zoning

    Dec 23, 2024 · 85 THE ESPLANADE
  • Building permit23 154107Permit Issued

    Replacement of four boilers (end of service life) to new high efficiency boilers replacement of existing parking exhaust ventilation system with CO detection sysetm. ( The existing exhaust system consists of an exhaust fan).

    Jun 29, 2023 · 85 THE ESPLANADE
  • Building permit22 212740Closed

    Proposal to replace the existing fire alarm control panel in the existing apartment building.

    Nov 22, 2022 · 85 THE ESPLANADE
  • Building permit10 261183Closed - Dormant

    Plumbing - Proposal to install a solar domestic hot water system in an existing building. Current use of building Senior Citzens Housing with office and retail.

    Oct 26, 2010 · 85 THE ESPLANADE
  • Building permit09 145496Closed - Dormant

    Install 1 back flow prevention device.

    Jun 16, 2009 · 85 THE ESPLANADE
  • Building permit04 195628Inspection

    HVAC - Interior alterations to various portions of building for structural changes. - Interior Alterations

    Dec 14, 2004 · 85 THE ESPLANADE

Check before you build

  • Site-specific exception 900.11.10(2365)

    Needs a closer look

    20 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2365)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Older by-law B

    Former City of Toronto by-law 515-76

  3. Older by-law C

    Former City of Toronto by-law 576-76

  4. Older by-law D

    Former City of Toronto by-law 677-76

  5. Older by-law E

    Former City of Toronto by-law 24-77

  6. Older by-law F

    Former City of Toronto by-law 614-77

  7. Older by-law G

    Former City of Toronto by-law 391-78

  8. Older by-law H

    Former City of Toronto by-law 478-78

  9. Older by-law I

    Former City of Toronto by-law 664-78

  10. Older by-law J

    Former City of Toronto by-law 812-78

  11. Older by-law K

    Former City of Toronto by-law 889-78

  12. Older by-law L

    Former City of Toronto by-law 373-79

  13. Older by-law M

    Former City of Toronto by-law 615-79

  14. Older by-law N

    Former City of Toronto by-law 884-79

  15. Older by-law O

    Former City of Toronto by-law 61-80

  16. Older by-law P

    Former City of Toronto by-law 879-80

  17. Older by-law Q

    Former City of Toronto by-law 116-82

  18. Older by-law R

    Former City of Toronto by-law 145-83

  19. Older by-law S

    Former City of Toronto by-law 92-85

  20. Older by-law T

    Former City of Toronto by-law 514-86

1 part for other addresses
  • U On 1 Church St., former City of Toronto by-laws 198-79, 513-90, and 417-91.
By-law 569-2013, Chapter 900

Lot facts

Area
1,208 m²
Frontage
28.6 mestimated, irregular lot
Depth
75.5 mestimated, irregular lot
Street
Church St
Corner lot
Yes, also on The Esplanade75.5 m along it
Public lane
None
House footprint
703 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
17 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: King. The lot is inside the King Major Transit Station Area approved by the Province (Site and Area Specific Policy 606). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: The Esplanade. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c0.5; r4.0) SS1 (x2365) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
11

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.

    7 YONGE ST · Sep 3, 2025 · 432 m away
  • Minor varianceApproved

    To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.

    7 YONGE ST · Apr 23, 2025 · 432 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

    71 KING ST E · Dec 11, 2024 · 317 m away
  • Minor varianceApproved

    To permit the reduction of residential parking spaces and types, residential amenity space provided, and tower heights to the 85 ,78, and 70-storey buildings, currently under review by Site Plan Control Application (File Number 20 19218252 STE 10 SA). There will be a total of 2,640 residential dwelling units (with 188 affordable units) within this block (Block4).

    55 LAKE SHORE BLVD E · Oct 23, 2024 · 293 m away
  • Minor varianceApproved

    To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

    34 KING ST E · Sep 25, 2024 · 400 m away

Latest activity nearby

  • Building permit

    Proposal for interior alteration to existing office suites 208, 216, 230 and 306

    56 THE ESPLANADE · Nov 26, 2026 · 92 m away
  • Zoning review

    Application On Hold

    91 FRONT ST E · Nov 24, 2026 · 213 m away
  • Building permit

    Proposed cooling Tower Replacement scope on the roof and mechanical room, along with one heating coil replacement.

    33 YONGE ST · Nov 17, 2026 · 294 m away
  • Building permit

    Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.

    47 COLBORNE ST · Nov 9, 2026 · 246 m away
  • Building permit

    UNIT 301 INTERIOR NON-STRUCTURAL PARTITION DEMOLITION

    47 COLBORNE ST · Nov 6, 2026 · 246 m away
  • Building permit

    REV 01: Revision to permit to combine the two existing all gender washrooms into oneProposal for interior alterations for tenant fit out to existing unit. Unit 300

    41 FRONT ST E · Nov 6, 2026 · 141 m away
  • Building permit

    REVISION- 03Rev 02 - Scope clarified and simplified for future tenant (Back to Base project with plumbing rough-ins). Build out of future space by others (under separate future permit).REVISION 01:Interior alterations - back to base building - group A occupancy

    71 FRONT ST E · Nov 5, 2026 · 141 m away
  • Building permit

    Proposal for iInterior alterations to a group D office building - UNIT 400

    47 COLBORNE ST · Nov 4, 2026 · 246 m away
  • Building permit

    Interior alterations to and existing office. - Unit 307 - Allied

    47 COLBORNE ST · Nov 3, 2026 · 246 m away
  • Building permit

    Revision 01: revision to permit 25-138538 BLD 00 BA to revise layout.Convert the existing gym to a retail store - DollaramaConvenience address is 98 The Esplanade

    71 FRONT ST E · Nov 3, 2026 · 141 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
King Station7 min walk
Nearest TTC stop
Church St at The Esplanade1 min walk
Nearest cycling route
The EsplanadeBi-Directional Cycle Track, 1 min walk
Nearest traffic count
5,993 vehicles in 14 hThe Esplanade / Church St, 30 m away, Jul 17, 2024
Serious collisions within 500 m
142021–2026, killed or seriously injured: 4 fatal, 7 with pedestrians, 6 with cyclists
Parks
Berczy Park3 min walk
David Crombie Park3 min walk
Market Lane Park4 min walk

Schools within 1 km

  • DOWNTOWN ALTERNATIVE SCHOOL English Public 3 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 4 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 7 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 8 min walk
  • VICTORIA STREET LINC English Public 9 min walk
  • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.