HousePrecheckCheck an address

85 St George StToronto · zoning, lot size and permit records

58.7 × 79.9 m4,653 m²on Hoskin Avecorner, also on St George St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 23 223459 (Premise isolation backflow preventer device installation on exisiting fire sprinkler sy..., 2023, status Inspection); 22 202689 (Replacement of conventional fire alarm system to addressable system due to obsolete rep..., 2022, status Inspection); 10 179049 (interior alterations on portion of ground floor, new millwork counter, repostioning of..., 2010, status Revocation Pending). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
58.7 m frontage79.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 building permits open, the oldest since 2010

    Needs a closer look

    Still open in the City's records: 23 223459 (Premise isolation backflow preventer device installation on exisiting fire sprinkler sy..., 2023, status Inspection); 22 202689 (Replacement of conventional fire alarm system to addressable system due to obsolete rep..., 2022, status Inspection); 10 179049 (interior alterations on portion of ground floor, new millwork counter, repostioning of..., 2010, status Revocation Pending).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit23 223459Inspection

    Premise isolation backflow preventer device installation on exisiting fire sprinkler system water service

    Dec 11, 2023 · 85 ST GEORGE ST
  • Building permit22 202689Inspection

    Replacement of conventional fire alarm system to addressable system due to obsolete replacement componenets

    Oct 20, 2022 · 85 ST GEORGE ST
  • Building permit19 229140Closed

    Modifications to the incoming water service piping within the existing building, to provide back-flow prevention.

    Oct 30, 2019 · 85 ST GEORGE ST
  • Building permit10 179049Revocation Pending

    interior alterations on portion of ground floor, new millwork counter, repostioning of doors, addition of security window, relocation of doors requires infill of existing 1hr rating

    Jun 7, 2010 · 85 ST GEORGE ST
  • Building permit97 024258Closed

    INSTALL A COMMUNICATIONS CABINET IN BASEMENT AND 2 CELLULAR ANTENNAS AND A MICROWAVE ANTENNA ON ROOF : CANTEL COMMUNICATIONS JB LISTED HISTORICAL

    Dec 18, 1997 · 85 ST GEORGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,653 m²
Frontage
58.7 m
Depth
79.9 m
Street
Hoskin Ave
Corner lot
Yes, also on St George St79.9 m along it
Public lane
None
House footprint
2,463 m²
Back yard
2.6 mhouse to rear lot line
Side yards
2.5 m and 4.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    2
    Multiplex permits
    0
    Development applications
    9

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).

      356 HURON ST · Dec 10, 2025 · 232 m away
    • Minor varianceApproved

      To alter the existing two-storey mixed-use building by constructing a rear three-storey addition with a ground floor one-car garage (abutting the laneway). The side (east) second and third storey portions of the rear addition will be partially cantilevered above the exterior passageway. The existing office space on the ground floor, as well as the two residential dwelling units on the second and third levels will be maintained.

      108 HARBORD ST · Aug 13, 2025 · 487 m away
    • Minor varianceApproved

      To alter the existing two-storey commercial building by increasing the permitted non-residential gross floor area for the restaurant use (through interior alterations).

      648 SPADINA AVE · Dec 11, 2024 · 395 m away
    • Minor varianceApproved

      To alter the existing building by constructing a three-storey addition above the one-storey portion of the building.

      70 ST GEORGE ST · Sep 6, 2023 · 261 m away
    • Minor varianceApproved

      To alter the existing building (Innis College) by constructing a four-storey addition at the northwest portion of the subject site.

      2 SUSSEX AVE · Jul 19, 2023 · 253 m away

    Latest activity nearby

    • Zoning review

      Application On Hold

      356 HURON ST · Nov 12, 2026 · 232 m away
    • Building permit

      Proposal for the replacment of three (3) air handling units and one (1) cooling tower

      80 ST GEORGE ST · Nov 10, 2026 · 200 m away
    • Building permit

      REV : Proposed revision include coordinated revised drawings of laboratory, classroom, office and lounge spaces to reflect minor modifications required due to numerous site conditions found during construction at the existing university building. Proposal for interior building alterations - demolition. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work

      25 HARBORD ST · Nov 3, 2026 · 92 m away
    • Building permit

      Proposed 3 storey entrance Addition to north elevation of existing Bissell Building. Addition to contain new accessible at-grade primary entrance, academic and office programed spaces and a new roof terrace. Scope of work includes renovations and alterations to existing Bissell Building levels 1 to 4 including new window openings at the ground level. The Project will also include landscaping.

      130-140 ST GEORGE ST · Nov 2, 2026 · 145 m away
    • Building permit

      Proposal to replace existing fire pump

      140 ST GEORGE ST · Oct 29, 2026 · 195 m away
    • Building permit

      Proposal for existing fire-pump replacement

      120 ST GEORGE ST · Oct 29, 2026 · 105 m away
    • Building permit

      Proposal for existing fire-pump replacement, replacement of all existing hose valves in every existing fire hose cabinet.

      130 ST GEORGE ST · Oct 29, 2026 · 145 m away
    • Building permit

      Proposal for fire protection sprinkler system alteration.

      110 ST GEORGE ST · Oct 21, 2026 · 79 m away
    • Building permit

      Proposed wholesale removal and replacement of existing conventional BUR roof with a new two-ply cold-adhered conventional modified bitumen membrane assembly, wholesale replacement of parapet metal flashing, localized masonry repairs and mortar repointing as directed by the consultant, wholesale removal and replacement of the existing deteriorated roof deck and joists

      7 HART HOUSE CRCL · Oct 8, 2026 · 258 m away
    • Building permit

      Proposal for the supply of a 3/4" water service to a hose bib that will servce an existing community garden.

      358 HURON ST · Sep 15, 2026 · 227 m away

    Neighbourhood: University

    About the area around the lot, not the lot itself.

    Nearest station
    St. George Station8 min walk
    Nearest TTC stop
    Hoskin Ave at St George St1 min walk
    Nearest cycling route
    St George StBike Lane, 1 min walk
    Nearest traffic count
    11,238 vehicles in 14 hHoskin Ave / Harbord St / St George St, 70 m away, Jun 25, 2025
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 3 with cyclists
    Parks
    Queen's Park6 min walk
    Huron - Washington Parkette6 min walk
    Matt Cohen Park8 min walk

    Schools within 1 km

    • MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 3 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 3 min walk
    • ROTMAN SCHOOL OF MANAGEMENT - U OF T, BLDG 134 University 3 min walk
    • SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 3 min walk
    • SCHOOL OF CONTINUING STUDIES - U OF T, BLDG 103 University 6 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT THE OBSERVATORY - U OF T, BLDG 89 University 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureUniversityMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home39%54%
    Population (2021)6,43516,813
    Homes built in 1960 or before59%29%
    Homes needing major repairs11%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleUniversityCity median
    Assault1740.5636.3
    Robbery133.969.5
    Homicide12.25.3
    Auto theft182.6192.6
    Theft over $5,000121.746.1
    Break and enter730.3172.8
    Theft from vehicles353188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.