HousePrecheckCheck an address

85 Commissioners StToronto · zoning, lot size and permit records

≈ 144.8 × 242.6 m20,630 m²on Commissioners St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 01 115280 (Install fixtures on 1st Floor; 1wc, 1 urinal, 1 lav, 1 ks, 2nd Floor: 1 2-comp ks cost..., 2001, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
≈ 144.8 m frontage≈ 242.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2001

    Needs a closer look

    Still open in the City's records: 01 115280 (Install fixtures on 1st Floor; 1wc, 1 urinal, 1 lav, 1 ks, 2nd Floor: 1 2-comp ks cost..., 2001, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (98% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Zoning review10 178855 ZPRClosed
    May 20, 2010 · 85 COMMISSIONERS ST
  • Building permit01 115280Inspection

    Install fixtures on 1st Floor; 1wc, 1 urinal, 1 lav, 1 ks, 2nd Floor: 1 2-comp ks cost included in 01 114762

    Mar 2, 2001 · 85 COMMISSIONERS ST
  • Building permit01 114762Closed

    Make interior alterations to portion of 1st and 2nd floor.

    Mar 1, 2001 · 85 COMMISSIONERS ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
20,630 m²
Frontage
144.8 mestimated, irregular lot
Depth
242.6 mestimated, irregular lot
Street
Commissioners St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    3

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a place of amusement use for the purpose of axe throwing on the ground floor of the existing two-storey industrial building.

      16 MUNITION ST · Aug 9, 2023 · 486 m away
    • Minor varianceApproved

      To permit a "place of amusement" use for the purpose of Hatchet Throwing on the ground floor of the existing two-storey industrial building, for a period of five years.

      16 MUNITION ST · Sep 27, 2017 · 486 m away
    • Minor varianceApproved

      To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of six years, from June 10 to November 30, annually.

      51 COMMISSIONERS ST · Jan 31, 2017 · 284 m away
    • Minor varianceApproved

      To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 5 years, from July 1st to October 31st, annually.

      51 COMMISSIONERS ST · Feb 19, 2014 · 284 m away
    • Minor varianceApproved

      To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 3 years, from July 1st to October 31st, annually.

      51 COMMISSIONERS ST · Jun 1, 2011 · 284 m away

    Latest activity nearby

    • Zoning review

      Closed

      80 COMMISSIONERS ST · Oct 8, 2026 · 294 m away
    • Building permit

      Proposal to erect temporary structures - wooden structures or modules with fabric in lieu of ceilings from June 23 to December 31 2026.South Boulevard of Commissioners St, near Munitions St, in the future transit ROW

      80 COMMISSIONERS ST · Jun 23, 2026 · 294 m away
    • Development application

      Draft Plan of Subdivision to create fourteen (14) development blocks of varying sizes and configurations, and nine (9) additional blocks to facilitate new segments of the water's edge promenade and dockwall as well as a variety of publicly-accessible open spaces enable development in Ookwemin Minising.

      150 COMMISSIONERS ST · May 15, 2026 · 163 m away · City file
    • Building permit

      Revision 01 - Revision to Permit 23 235370 to include: new kitchen millwork and appliances at ground floor; new washrooms and kitchenette on the second floor; associated work to HVAC, plumbing and electrical systems; and renaming second floor rooms.Interior renovation to support a Change of Use. Conservation work and new door openings at exterior.Ancillary to Park

      51 COMMISSIONERS ST · Aug 11, 2025 · 284 m away
    • Building permit

      Ceremony and celebration sunshade structure (pavillion) as part of Port Lands Flood Protection project. Erection of glulam beam and metal panel pavilion structure.

      51 COMMISSIONERS ST · May 27, 2025 · 284 m away
    • Building permit

      Revision 01 - Addition of a domestic cold water makeup provision for the site irrigation system.Plumbing - Proposed to construct 3 Storey Building comprised of 3 sound stages for Media Production, two support workshops, and office.

      101 COMMISSIONERS ST · Feb 21, 2023 · 251 m away
    • Building permit

      To erect and display eleven first party non-illuminated wall signs, displaying static copy.*****VARIOUS IDENTIFICATION SIGNS*****

      101 COMMISSIONERS ST · Jun 17, 2022 · 251 m away
    • Consent (lot split)Approved

      To obtain consent to establish a mortgage over a portion of the property known as 101 COMMISSIONERS ST(1 and 17 BASIN ST).

      101 COMMISSIONERS ST · Jun 16, 2021 · 251 m away
    • Building permit

      Part Permit - Proposal to relocate the existing building from 39 Commissioner St to a new location (51 Commissioner Streett) on a new foundation.

      51 COMMISSIONERS ST · Jan 21, 2021 · 284 m away
    • Zoning review

      Closed

      51 COMMISSIONERS ST · Nov 10, 2020 · 284 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    King Station42 min walk
    Nearest TTC stop
    75 Commissioners St2 min walk
    Nearest cycling route
    Biidaasige Park TrlMulti-Use Trail, 1 min walk
    Nearest traffic count
    6,205 vehicles in 14 hCommissioners St / Don Roadway, 200 m away, Oct 6, 2026
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Biidaasige Park1 min walk
    Cherry Beach Clarke Beach Park10 min walk
    Cherry Beach Sports Fields10 min walk

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.