HousePrecheckCheck an address

846 Progress AveToronto · zoning, lot size and permit records

Employment · E 0.7 (x165)76.0 × 151.3 m11,083 m²on Progress Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 2 development applications open within 300 m, up to 1 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
76.0 m frontage151.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit17 279742Closed

    Proposed interior alterations to an existing Place of Worship.

    Feb 5, 2018 · 846 PROGRESS AVE
  • Building permit99 201303Closednew building

    KINGDOM HALL

    Oct 28, 1999 · 846 PROGRESS AVE

Check before you build

  • Site-specific exception 900.20.10(165)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(165)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from the centre line of the creek is 15 metres. Prevailing By-laws and Prevailing Sections: (None Apply)

  2. Older by-law A

    The minimum building setback from the centre line of the creek is 15 metres. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
11,083 m²
Frontage
76 m
Depth
151.3 m
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
1,469 m²roof up to 7.9 m
Back yard
84.7 mhouse to rear lot line
Side yards
14.2 m and 14.4 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.7 (x165) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    Interior alterations to the north wing to convert the existing church space into a day nursery.

    801 PROGRESS AVE · Sep 10, 2025 · 328 m away
  • Minor varianceApproved

    The applicant is seeking relief from the provisions of the Zoning By-law to permit the growing of micro greens in the existing organic food processing company, Crown Sprouts.

    1147 BELLAMY RD N · Dec 13, 2018 · 332 m away

Latest activity nearby

  • Building permit

    Proposed interior alterations to existing office (Toyota Canada).

    850 PROGRESS AVE · Aug 28, 2026 · 155 m away
  • Zoning review

    Closed

    10 ESTATE DR · Aug 4, 2026 · 84 m away
  • Development application

    Proposal to redevelopment of a part of an existing 1-storey commercial building, and to construct 2 additional storeys above it without changing the building footprint. The proposed redevelopment consists of retaining 3799sqm of the existing 4929sqm building, and redeveloping the remaining 1130 sqm, and constructing 2x 1130 sqm floorplates above it. The total modified/new GFA is 3390sqm, and the overall total GFA including the existing retained building is 7189sqm. The building will have a height of 13.2m, 3-storeys, and 53 parking spaces.

    20 PRODUCTION DR · Jun 24, 2026 · 196 m away · City file
  • Zoning review

    Closed

    10 ESTATE DR · May 8, 2026 · 84 m away
  • Building permit

    Updating the existing infrastructure to bring the building in line with net-zero energy design criteria.

    821 PROGRESS AVE · Jan 23, 2026 · 202 m away
  • Zoning review

    Closed

    39 ESTATE DR · Nov 13, 2025 · 279 m away
  • Building permit

    1 GROUND SIGN**KAL TIRE**

    16 ESTATE DR · Nov 4, 2025 · 112 m away
  • Building permit

    Proposal to install a backflow prevention device.

    860 PROGRESS AVE · Aug 22, 2025 · 98 m away
  • Building permit

    Proposal to restore existing sprinkler system.

    16 ESTATE DR · Apr 15, 2025 · 112 m away
  • Zoning review

    Closed

    1 TOYOTA PL · Apr 10, 2025 · 218 m away

Neighbourhood: Woburn North

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station20 min walk
Nearest TTC stop
Progress Ave at Production Dr2 min walk
Nearest cycling route
Ellesmere RdMulti-Use Trail - Boulevard, 14 min walk
Nearest traffic count
11,043 vehicles in 8 hProgress Ave: Bellamy Rd N - Production Dr, 150 m away, Mar 21, 2016
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Trca Lands ( 77)6 min walk
Morningside Park8 min walk
Lee Centre Park8 min walk

Schools within 1 km

  • TALENTA ACADEMY Private 10 min walk
  • ADVANCED CHRISTIAN ACADEMY (Renamed) Private 11 min walk
  • ADVANCED CHRISTIAN ACADEMY Private 11 min walk
  • MADINATUL ULOOM ACADEMY INC Private 11 min walk
  • MADINATUL ULOOM ISLAMIC GIRLS ACADEMY Private 12 min walk
  • Z3 EDUCATION CENTRE SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWoburn NorthMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home54%54%
Population (2021)26,58016,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWoburn NorthCity median
Assault768.9636.3
Robbery76.569.5
Shootings13.910.5
Auto theft316.6192.6
Theft over $5,00062.646.1
Break and enter180.9172.8
Theft from vehicles281.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.