HousePrecheckCheck an address

842 Eglinton Ave WForest Hill North, Toronto · City records before you offer

≈ 26.6 × 43.0 m868 m²on Eglinton Ave Wcorner, also on Bathurst St

1 thing to check before you offer, including zoning not in By-law 569-2013
N20 m
≈ 26.6 m frontage≈ 43.0 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 842 Eglinton Ave W

842 Eglinton Ave W is on a 26.6 m by 43 m lot on Eglinton Ave W in Forest Hill North. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Bathurst St.

The City has 14 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Revision 03 - manual pull stationrevision 02 - addition of platform edge bollards. (refer to typical design approvals in ads 22 193328, 22 200930, 22 216439…". Status: closed. In 2023, a building permit was filed: "Protection of standpipe systems at all stations". Status: approved. In 2023, a building permit was filed: "Transit station subway, interior alterations for the installation of the future presto faregates to the transit subway station - forest hill station". Status: closed. Nothing on file is open right now.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 34 minor variance applications in the last 10 years and approved 85%. Forest Hill station is a 1-minute walk.

Summary

What the City's records show on this house

  • Zoning not in By-law 569-2013Moderate

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Clear

Open City files

How much in the City's records needs answers before an offer

  • No open orders or by-law investigations
  • No permits left open for years
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

City files on this lot

14 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2024-01-08Building permit
24 102484
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stationsCancelled
2023-07-24Building permit
16 206706
Revision 03 - manual pull stationRevision 02 - addition of platform edge bollards. (Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647)Revision 01 - Changes to wall fire rating, counter and stair changes, AED Mounting, Emergency walkway, Include Alternative Solution 19-259678 ALTPermit to construct entrance buildings for Forest Hill Station (Eglinton Crosstown LRT). Main entrance building at 842 Eglinton Ave West. Secondary entrance building at 870 and 874/876 Eglinton Ave West.Closed
2023-07-11Building permit
23 172608
Protection of Standpipe Systems at all StationsApproved
2023-01-26Building permit
23 103209
Transit Station Subway, interior alterations for the installation of the future Presto Faregates to the Transit Subway Station - Forest Hill StationClosed
2022-09-08Building permit
22 200895
Provide edge installation for bollard barriersCancelled
2017-10-05Zoning review
12 180899 PSP
No description on fileClosed
2017-01-06Building permit
17 101517
Egress from Service AreasApproved
2016-02-25Building permit
16 109392
Demolition of existing building for the future Main Entrance of the Eglinton LRT Line (Bathurst Station)Closed
2012-05-08Development application
12 169101 STE 21 SA
Eglinton Crosstown LRT Forest Hill StationClosed
2011-10-19Zoning review
11 295647 ZPR
No description on fileRe-Examined
2010-05-18Zoning review
10 177049 LTO
No description on fileClosed
2010-03-29Zoning review
10 141084 LPR
No description on fileClosed
1991-02-14Zoning review
91 026105 LTO
No description on fileClosed
1981-09-08Zoning review
81 030651 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
≈ 26.6 m frontage≈ 43.0 m deepon Eglinton Ave W
Zone
—
Height limit
—
Corner lot
Yes, also on Bathurst St
Public lane
None
House footprint
387 m²
Back yard
0.5 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Some

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 7 development applications within 300 m in 10 years, none open
    • 7 suite and multiplex permits within 300 m in 10 years
    • 34 minor variance decisions within 300 m, 85% approved

    What this part means for this house, in plain EnglishUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 5 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Forest Hill North neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$90,000median $84,500
    Households that own their home35%median 54%
    Population (2021)12,290median 16,813
    Homes built in 1960 or before45%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Forest Hill StationNearest station1 min walk
    • Bathurst St at Eglinton Ave West North SideNearest TTC stop1 min walk
    • Old Forest Hill RdNearest cycling route2 min walk
    • Alive Montessori and Private SchoolSchool1 min walk
    • Forest Hill Collegiate InstituteSchool6 min walk
    • The Village Shul Synagogue & Supplmentary SchoolSchool8 min walk
    • West Preparatory Jr Public SchoolSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3412.3
    • Robberycity median 69.57.2
    • Auto theftcity median 192.672.3
    • Theft over $5,000city median 46.150.6
    • Break and entercity median 172.8159.1
    • Theft from vehiclescity median 188.179.6

    More about Forest Hill North

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 842 Eglinton Ave W

    1 thing to check at 842 Eglinton Ave W before you offer

    • Zoning not in By-law 569-2013Moderate

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • The one step to take before you offer, so nothing slips
    • 15 sets of public records, already searched and read for you
    • What this finding can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.